Permit Information
Permit NumberBLD17-02262
StatusFinaled
Name ESI
Site Address 2419 W FAIRVIEW AVE
Project NameAdare Manor Apartments
Customer Number17-02261
ePlanReviewYes
Description
(ADARE MANOR APARTMENTS) Building B: There are two building permits under this Eplan.16 units of a 134-Unit multi-family housing and accessory retail project.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  10/23/2019 DONE
BLD-Final10/22/201910/22/201910/22/2019PPASS
DetailsDave Hannah
Tony Phone #: ###-####
FIRE-Final Inspection10/22/201910/22/201910/22/2019PPASS
DetailsTroy Cobbley
Life safety passed.

Tony Phone #: ###-####
BLD-Final10/16/201910/17/201910/17/2019PCANC
DetailsBrandon Shaw
Tony Phone #: ###-####
FIRE-Final Inspection10/16/201910/17/201910/17/2019APASS
DetailsTroy Cobbley
Previous corrections have been addressed. Life safety passed. Tony Phone #: ###-####
BLD-Final9/27/20199/30/20199/30/2019APART
DetailsDave Hannah
Asked for Michael is Dave is out today // Tony Phone #: ###-#### ok for tco for whole building
Temporary Occupancy9/30/201912/29/20199/30/2019 DONE
DetailsCandy A. Nichols
Jim Page good for a temp c of o for 45 days from 9/18/19
BLD-Final9/27/20199/27/20199/27/2019PNR
DetailsTony Young
Tony Phone #: 28-###-####
FIRE-Final Inspection9/26/20199/27/20199/27/2019ACANC
DetailsJim Page
David Phone #: ###-#### cancel per david wrong permit
PubWorks Occupancy Approval9/23/20199/23/20199/23/2019 DONE
DetailsTiffany Lowery
Bonding in place for additional PW requirements
BLD-Final9/19/20199/20/20199/20/2019APART
DetailsMike Jordan
Tony Phone #: ###-####. Ok for temp occ. only. Verified egress system for buildings A and B. Only rooms ok for occ. are 104,107,119,120,125,138,209,210,212,217,331,337,402,405,425,427,429,432,433,440.
Temporary Occupancy9/20/201912/19/20199/20/2019 DONE
DetailsTiffany Carson-Herker
FIRE-Final Inspection9/17/20199/18/20199/18/2019APART
DetailsJim Page
Partial final inspection for life fire safety complete, fire sprinkler inspection is complete, fire alarm system drawings need to be updated and resubmitted before final sign off due to the number of changes required to make it code compliant, fire extinguishers have been placed with current inspection tags. Remaining items to inspect for final sign off are:

1. Install permanent signage on stairwells/fire sprinkler riser room and FACP.

2. Provide inspection report for elevator inspection recall and shunt.

3. Update fire alarm drawings an resubmit for approval.

4. Change thumbturn deadbolts on sliding glass doors, level 2, to single action door hardware.


5. Provide a barrier for fall protection on roof top access ladder, stair 3.
6. Provide opening or gates in metal surround by HVAC units on roof for fireman access as discussed.
7. Hose valves on levels 1 through 4 project into the path of egress more than 4 inches, per IFC 1003.3.3, if a horizontal projection sticks out into the path of egress more than 4 inches then gaurds have to be provided if the projection doesn't impede the minimum width for the path of egress. If valves do in fact project into the path of egress, then hose valves will be required to be installed in a recessed cabinet.

45 day TCO authorized per conversation with Ron Johnson with Boise Fire Department.

FIRE-Final Inspection9/17/20199/18/20199/18/2019PCANC
DetailsJim Page
Duplicate inspection request, this request is cancelled.

Curtis Phone #: ###-####
Zoning Approval9/18/20199/18/20199/18/2019 PASS
DetailsKatelyn Menuge
Seeding swale on 9/20.
FIRE-Final Inspection9/17/20199/17/20199/17/2019PCANC
DetailsTroy Cobbley
Duplicate inspection.David Phone #: ###-####
FIRE-Final Inspection9/16/20199/17/20199/17/2019AFAIL
DetailsTroy Cobbley
See the Fire Life Safety Plan Review Comments for items marked in red that need addressed which include finishing the fire alarm permit (added notification devices/elevator testing), fire dept access signage, additional fire extinguishers in common areas such as Laundry Rooms/Mail Rooms/Mechanical Rooms, Single action hardware for the common use rooms with sliding doors, verification that the Riser Room is one hour.....ect.

Curtis Phone #: ###-####
FIRE-Final Inspection9/16/20199/16/20199/17/2019PFAIL
DetailsTroy Cobbley
See the Fire Life Safety Plan Review Comments for items marked in red that need addressed which include finishing the fire alarm permit (added notification devices/elevator testing), fire dept access signage, additional fire extinguishers in common areas such as Laundry Rooms/Mail Rooms/Mechanical Rooms, Single action hardware for the common use rooms with sliding doors, verification that the Riser Room is one hour.....ect.

Curtis Phone #: ###-####
FIRE-Final Inspection8/29/20198/30/20198/30/2019AFAIL
DetailsJim Page
Project not ready for life fire safety inspection, no items inspected.

Tony Phone #: ###-####
BLD-Final8/29/20198/30/20198/30/2019PCANC
DetailsTony Young
Tony Phone #: ###-####
BLD-Conference8/29/20198/29/20198/29/2019PNR
DetailsDave Hannah
Tony Phone #: ###-####
BLD-Energy code compliance8/16/20198/19/20198/19/2019APASS
DetailsDave Hannah
Insulation on joist in ceiling of retail space. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in8/12/20198/13/20198/13/2019APASS
DetailsDave Hannah
Looking at the retail area and elevator hold downs. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Energy code compliance8/9/20198/9/20198/9/2019PPASS
DetailsDave Hannah
Insulation in breeze way Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Energy code compliance8/8/20198/8/20198/8/2019PNR
DetailsDave Hannah
Breezeway insulation Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover8/6/20198/7/20198/7/2019APASS
DetailsDave Hannah
Trash rooms Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover8/7/20198/7/20198/7/2019PPASS
DetailsDave Hannah
Trash rooms 2,3 and 4 Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover8/6/20198/6/20198/7/2019PPASS
DetailsDave Hannah
Looking to cover walls Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover7/10/20197/11/20197/11/2019APASS
DetailsMike Jordan
4th Floor Area D Corridor Ceiling inspection for drywall cover. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover5/30/20195/30/20195/30/2019APASS
DetailsDave Hannah
4th Floor Area A and B Soffit Cover inspection. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover5/2/20195/2/20195/2/2019PPASS
DetailsDave Hannah
Second Floor Area D Soffit inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover4/25/20194/26/20194/26/2019PPASS
DetailsDave Hannah
4th Floor Area D soffit areas for drywall cover. Stairway 3 and Mailroom for drywall cover. 2nd Floor B insulation inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover4/17/20194/17/20194/17/2019APASS
DetailsJim Sly
3rd Floor of area D Soffit inspection from cover. Phone #: ###-#### Inspection requested via web by JT Turner
Additional inspection of firestopping in soffits 2nd floor units.......OK.
BLD-Conference4/16/20194/16/20194/16/2019PCANC
DetailsDave Hannah
BLD-Wall cover4/11/20194/12/20194/12/2019APASS
DetailsDave Hannah
Inspection of Area D floors 2-3. Janitors, Trash and storage rooms on south end. Inspection so that we can insulate. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Energy code compliance4/10/20194/11/20194/11/2019PPASS
DetailsDave Hannah
Phone #: 2084076523 >> Inspection requested via mobile web by Travis Blackburn
BLD-Energy code compliance4/9/20194/10/20194/10/2019APART
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver 4th floor area c ok and ok to insulate first floor
BLD-Wall cover4/4/20194/5/20194/5/2019APASS
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver
BLD-Wall cover4/3/20194/4/20194/4/2019APART
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver first floor drop ceilings bld b ok to cover
BLD-Energy code compliance4/3/20194/3/20194/4/2019PPASS
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver area c third floor ok to insulate
BLD-Energy code compliance4/2/20194/3/20194/3/2019APART
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver 3rd floor area c ok to insulate
BLD-Wall cover3/29/20194/1/20194/1/2019PPASS
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver second floor area c ok to cover
BLD-Wall cover3/28/20193/29/20193/29/2019PPASS
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver area c first floor units ok to cover
BLD-Wall cover3/26/20193/27/20193/28/2019PPASS
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver
BLD-Wall cover3/20/20193/21/20193/22/2019PPART
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver 4th floor bldg d ok
BLD-Framing/Rough-in3/19/20193/19/20193/20/2019PPASS
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver shear and hold downs ground level 1st floor
BLD-Wall cover3/14/20193/15/20193/15/2019APART
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver 3rd floor insulation bldg d
BLD-Wall cover3/12/20193/12/20193/14/2019PPART
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver
BLD-Wall cover3/13/20193/13/20193/14/2019PPASS
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver bldg d second floor ok
BLD-Wall cover3/7/20193/8/20193/11/2019PCANC
DetailsDave Hannah
Second Floor Area D Full cover inspection of units. Third and fourth floor of area D for main shear wall fire caulk inspection so that we can finish shear. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in3/5/20193/6/20193/6/2019APART
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver first floor sear wall at 2hr wall ok to cover ok to insulate second floor
BLD-Framing/Rough-in2/28/20193/1/20193/1/2019PPART
DetailsBrandon Shaw
1st floor shear framing, Ok to insulate...
2nd floor corridors, areas A, B, and C, OK to Insulate...
BLD-Framing/Rough-in2/25/20192/25/20192/25/2019PPART
DetailsMike Jordan
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver. 2nd floor, Area D, ok to insulate exterior walls only. 1st. floor Area D, ok to insulate interior walls and rock from ceiling down 4ft except at 2hr. wall.
BLD-Wall cover2/22/20192/22/20192/22/2019PPART
DetailsDave Hannah
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver insulation ceiling and ext walls on rooms 134 -141
BLD-Framing/Rough-in2/20/20192/20/20192/20/2019PPART
DetailsDave Hannah
Area D First Floor unit ceilings for insulation and drywall cover. Exterior walls as well. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate ext walls and ceiling bldg d
FIRE-Conference2/12/20192/13/20192/13/2019ACANC
DetailsTroy Cobbley
Overall expectations project walk. Fire Extinguishers, Knox boxes, system setup, etc. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in2/12/20192/12/20192/12/2019PNR
DetailsDave Hannah
Shear inspection remaining corridors floors 1-4. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in2/6/20192/6/20192/7/2019PPART
DetailsDave Hannah
Floors 2 and 3 corridor fire caulking inspection so that we can begin insulation and drywall. Area D. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate and pre rpck corradoers 2nd and 3rd floors bldg d
BLD-Wall Bracing1/29/20191/30/20191/30/2019PPASS
DetailsDave Hannah
Tony Phone #: ###-####
BLD-Wall Bracing12/13/201812/13/201812/13/2018PPASS
DetailsDave Hannah
shear // Tony Phone #: ###-####
BLD-Wall Bracing11/20/201811/21/201811/21/2018PPASS
DetailsJim Storey
shear // Tony Phone #: ###-#### 3rd exterior a and e ok
BLD-Wall Bracing11/6/201811/7/201811/7/2018APART
DetailsJim Sly
interior // Tony Phone #: ###-####Walked with Gary.........Inspection of all retro fit hold downs in area A B and C. all OK except 3 missing in area C ......(marked in orange) and front wall of Elevator shaft. MTI special inspections
BLD-Wall Bracing10/8/201810/9/201810/9/2018APART
DetailsDave Hannah
Mike Phone #: ###-####-plywood shear interior
BLD-Wall Bracing10/1/201810/2/201810/2/2018APART
DetailsDave Hannah
tony Phone #: ###-#### see plans for areas oked
BLD-Framing/Rough-in10/1/201810/2/201810/2/2018ANR
DetailsDave Hannah
tony Phone #: ###-####
BLD-Wall Bracing8/13/20188/14/20188/14/2018APART
DetailsDave Hannah
Tony Phone #: ###-####
BLD-Conference8/3/20188/3/20188/3/2018PDONE
DetailsDave Hannah
Tony-or Mike ###-#### Phone #: ###-####
Issue PAID IN FULL permit  4/19/2018 DONE
Print Occupancy Form  4/19/2018 DONE
Telephone call  4/6/2018 DONE
Left a message for Heidi recommending to send in a request for an extension since the review went a bit longer and still waiting for ACHD info
Plan assigned to (CDM)7/12/20177/12/20173/23/2018 PASS
DetailsCarl D Madsen
1st Comp Adare Manor
PLANS/APPL TAKEN TO FRONT DESK  3/23/2018 DONE
Permit Ready to Issue  3/23/2018 DONE
Need ACHD
Routing PW Drainage1/17/2018 3/22/2018 PASS
DetailsBrian Murphy
Routing PW Environmental1/17/2018 3/22/2018 PASS
DetailsRick Christenson
Routing PW Solid Waste1/17/2018 3/22/2018 PASS
DetailsEvan Carpenter
Routing PW Environmental9/14/2017 3/22/2018 PASS
DetailsRick Christenson
Routing - PLAN CHECK1/17/2018 3/21/2018 PASS
DetailsCarl D Madsen
Routing - MECHANICAL1/17/2018 3/21/2018 PASS
DetailsTroy James
Routing - PLANNING1/17/2018 3/21/2018 PASS
DetailsCody Riddle
Routing - Erosion and Sediment1/17/2018 3/21/2018 PASS
DetailsAndy J. Long
Routing Off Site - STRUCTURAL1/17/2018 3/21/2018 PASS
DetailsCarl D Madsen
Routing - Design Review7/12/2017 3/20/2018 PASS
DetailsSarah Schafer
Routing PW Sewer Design1/17/2018 2/21/2018 PASS
DetailsMike Sheppard
Route to Impact Fee Review1/17/20181/22/20182/7/2018 PASS
DetailsEric Bilimoria
Routing PW Street Lights2/5/2018 2/5/2018 PASS
DetailsTom Marshall
Routing - FIRE1/17/20181/17/20181/23/2018 PASS
DetailsScott Arellano
Attached revised comments to plans.
Routing - PLUMBING1/17/2018 1/22/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing1/17/2018 1/18/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/17/2018 1/17/2018 PASS
DetailsRachael Beierle
Routing - Design Review1/17/2018 1/17/2018 FAIL
DetailsSarah Schafer
Parking agreements and cross access easements still need signed and recorded.
Route to Impact Fee Review9/1/20179/4/201710/19/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLUMBING10/11/2017 10/11/2017 PASS
DetailsBill VanDegrift
Routing - PLAN CHECK9/14/2017 9/20/2017 FAIL
DetailsCarl D Madsen
Routing PW Solid Waste9/14/2017 9/20/2017 PASS
DetailsEvan Carpenter
Routing PW Drainage9/14/2017 9/19/2017 PASS
DetailsBrian Murphy
Routing PW Street Lights9/14/2017 9/19/2017 FAIL
DetailsTom Marshall
Routing PW Sewer Rating9/19/2017 9/19/2017 PASS
DetailsMorgan Webb
Routing - Addressing9/15/2017 9/15/2017 PASS
DetailsDoug Chausow
NOTE: Parcel numbers will need to be updated, once ROS17-00045 is finalized.
Routing - PLUMBING7/12/2017 9/5/2017 FAIL
DetailsBill VanDegrift
see bld17-02261
Routing - PLAN CHECK7/12/2017 9/1/2017 FAIL
DetailsCarl D Madsen
Routing - PLANNING Land Div7/12/2017 9/1/2017 PASS
DetailsTodd Tucker
Routing Off Site - STRUCTURAL7/12/2017 9/1/2017 FAIL
DetailsCarl D Madsen
Routing PW Solid Waste7/13/2017 9/1/2017 FAIL
DetailsEvan Carpenter
The eastern trash room must have an access ramp to the service drive within 15 feet of the trash room’s external door.
Routing PW Street Lights7/13/2017 9/1/2017 FAIL
DetailsTom Marshall
BLD17-02261 failed this on fails too.
Routing PW Drainage7/13/2017 9/1/2017 PASS
DetailsBrian Murphy
1st review completed  9/1/2017 FAIL
Routing - MECHANICAL7/12/2017 7/19/2017 FAIL
DetailsTroy James
Routing - FIRE7/12/20177/12/20177/14/2017 FAIL
DetailsScott Arellano
Report attached to case and emailed to architect.
Routing - PLANNING7/12/2017 7/13/2017 FAIL
DetailsCarl D Madsen
Routing - Addressing7/12/2017 7/13/2017 FAIL
DetailsLaura Hunter
Need to consolidate parcels via record of survey
Routing - PUBLIC WORKS7/12/2017 7/13/2017 FAIL
DetailsRachael Beierle
FAILED DUE TO ADDRESSING
Routing - Erosion and Sediment7/12/2017 7/13/2017 PASS
DetailsAndy J. Long
Intake Approval  7/12/2017 PASS
Application received  7/6/2017 DONE
Application submitted via PDS Online on Jul 6 2017 3:25PM
First Notice 11/2/2019   
Routing - PUBLIC WORKS9/19/2017   FAIL
DetailsMorgan Webb
STREET LIGHTS FAILED 9/19/17
Routing PW Drainage5/31/2018