BLD-Framing/Rough-in | 6/24/2020 | 8/5/2020 | 8/5/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 6/24/2020 | 7/29/2020 | 7/29/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 6/24/2020 | 7/22/2020 | 7/22/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 6/24/2020 | 7/15/2020 | 7/15/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 7/15/2020 | 7/15/2020 | 7/15/2020 | A | DONE |
Mike Jordan
|
|
|
On site to meet new general contractor.
|
BLD-Framing/Rough-in | 6/24/2020 | 7/8/2020 | 7/8/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 6/24/2020 | 7/1/2020 | 7/1/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/27/2020 | 6/24/2020 | 6/24/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/27/2020 | 6/17/2020 | 6/17/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/27/2020 | 6/10/2020 | 6/10/2020 | A | DONE |
Mike Jordan
|
|
|
Walk through on work in progress on MOB side of building.
|
BLD-Framing/Rough-in | 5/27/2020 | 6/3/2020 | 6/3/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 4/29/2020 | 5/27/2020 | 5/27/2020 | A | PEND |
Mike Jordan
|
|
|
1st. floor walk thru only on MOB side. Work is in progress.
|
BLD-Framing/Rough-in | 4/29/2020 | 5/20/2020 | 5/20/2020 | A | DONE |
Mike Jordan
|
|
|
Reviewed submittal for T ratings from YMC. Awaiting approval from architect.
|
BLD-Framing/Rough-in | 4/29/2020 | 5/13/2020 | 5/13/2020 | A | PASS |
Mike Jordan
|
|
|
3rd level MOB interior steel stud framed walls at hand therapy room ok to cover only.
|
BLD-Framing/Rough-in | 4/29/2020 | 5/6/2020 | 5/7/2020 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 4/9/2020 | 4/29/2020 | 4/29/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 4/9/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Mike Jordan
|
|
|
3rd. floor line set through pentrations have been repaired and ok to cover. observed in progress work on 3rd and 4th floors, MOB side.
|
BLD-Framing/Rough-in | 4/9/2020 | 4/15/2020 | 4/15/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 4/3/2020 | 4/3/2020 | 4/3/2020 | A | FAIL |
Mike Jordan
|
|
|
Through penetrations for line sets on level 3 and 4 MOB area is not installed per the supplied UL listing.
|
BLD-Framing/Rough-in | 4/2/2020 | 4/2/2020 | 4/3/2020 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 3/6/2020 | 4/1/2020 | 4/1/2020 | A | DONE |
Mike Jordan
|
|
|
Level 3 MOB side. Noted that linesets have been firecaulked. No listing from sub contractor has been provided. Linesets to remain uncovered until listing has been provided and completed work is approved.
|
BLD-Conference | 3/6/2020 | 3/25/2020 | 3/25/2020 | A | DONE |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 3/25/2020 | 3/25/2020 | 3/25/2020 | A | PART |
Mike Jordan
|
|
|
One siding in progressing on level 3 MOB framing. Still needs to firestop and provide UL listing for line sets in RM.3W235 and noted the plumbing pipes in Rm 3W228 not firestopped yet, will require a T rating.
|
BLD-Other | 3/20/2020 | 3/23/2020 | 3/23/2020 | A | PASS |
Mike Jordan
|
|
|
through floor and monicot.. level 3 // Rocky Phone #: ###-####. 3rd. level MOB interior steel stud framed walls and rated floor penetrations. grids 4W to 11W. See plans for marked locatons.
|
BLD-Conference | 3/6/2020 | 3/18/2020 | 3/18/2020 | A | DONE |
Mike Jordan
|
|
|
|
BLD-Wall cover | 3/11/2020 | 3/12/2020 | 3/12/2020 | A | PASS |
Mike Jordan
|
|
|
Ken Phone #: ###-####. Issues resolved on level 2 MOB side, grids 3W to 8W. All fire proofing patch backs ok. Ok to cover. Plumbing penetrations to be firestopped from underneath.
|
BLD-Conference | 3/6/2020 | 3/11/2020 | 3/11/2020 | A | NR |
Mike Jordan
|
|
|
Walk through to visualy inspect MOB level 2 areas for patch backs on fireproofing and fire rated penetrations. Will reinspect tomorrow.
|
BLD-Conference | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | FAIL |
Mike Jordan
|
|
|
Ken Phone #: ###-####. Level 2 framing from grid 8W going west has been covered. Contractor to remove sheetrock around columns and at 10 random locations were there are floor penetrations to ensure firestopping has been completed.
|
BLD-Wall cover | 2/12/2020 | 2/14/2020 | 2/14/2020 | A | PASS |
Mike Jordan
|
|
|
Ken Phone #: ###-####. Interior steel stud non rated walls at level 2 MOB at grids 8W.5 to 10W.5 and grids B.6 to grids D.8. Also grids B.5 to B.4 and grids 7W to 10W.5. Noted that non combustible plumbing pie to be fire stop from underneath due to pipe clamp interfierance. Also noted select areas were fire proofing on columns will need to be hand patched, these ares will be left uncovered for reinspection.
|
BLD-Conference | 2/4/2020 | 2/5/2020 | 2/5/2020 | A | DONE |
Mike Jordan
|
|
|
Ken Phone #: ###-####. Walk through on 1st and 2nd. floors.
|
BLD-Wall cover | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | CANC |
Mike Jordan
|
|
|
Ken Phone #: ###-####
|
BLD-Other | 1/24/2020 | 1/24/2020 | 1/24/2020 | P | DONE |
Mike Jordan
|
|
|
3rd floor MOB walk through.
|
BLD-Framing/Rough-in | 1/13/2020 | 1/13/2020 | 1/14/2020 | P | DONE |
Dave Hannah
|
|
|
Ken Phone #: ###-####
|
BLD-Framing/Rough-in | 1/6/2020 | 1/7/2020 | 1/13/2020 | P | PEND |
Dave Hannah
|
|
|
Ken Phone #: ###-####
|
BLD-Framing/Rough-in | 1/8/2020 | 1/8/2020 | 1/13/2020 | P | PEND |
Dave Hannah
|
|
|
Ken Phone #: ###-####
|
BLD-Framing/Rough-in | 1/2/2020 | 1/2/2020 | 1/7/2020 | P | PEND |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | PASS |
Mike Jordan
|
|
|
Ken Phone #: ###-####. Interior steel stud framed walls, 1hr. fire barrier walls, 1hr. smoke barrier walls and smoke partitions at level 2 area D at grids 9E to 12E and grids FF to JJ. Also 1hr. smoke barrier corridor wall grid 7E to 12E, south side.
|
BLD-Other | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PART |
Dave Hannah
|
|
|
fire culking // tim Phone #: ###-####
|
BLD-Other | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | CANC |
Dave Hannah
|
|
|
fire culking // tim Phone #: ###-####
|
BLD-Framing/Rough-in | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | PART |
Dave Hannah
|
|
|
ken Phone #: ###-#### walked project with super and framing contractor looked at both int and ext walls all looking good they will add some more shots to bottom track on ext and get me some details for int track
|
Issue PAID IN FULL permit | | | 6/27/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/27/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 4/9/2019 | | |
|
|
|
|
Plan assigned to (CJW) | 5/23/2018 | 5/23/2018 | 4/9/2019 | | PASS |
Carl Westfall
|
|
|
(4th done) 06/26/18 (new - 25 days) (ePlan - 693 sheets) St. Lukes Orthopedic (routed to staff)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2019 | | DONE |
|
|
|
|
Extend Review Timeline | | | 4/9/2019 | | DONE |
|
|
|
1st extention approved, see attached document. New exp. date is 3/19/19
|
Extend Review Timeline | | | 4/9/2019 | | DONE |
|
|
|
2nd extention approved, see attached document. New exp. date is 9/15/19
|
Permit Ready to Issue | | | 4/9/2019 | | DONE |
|
|
|
all met: dahlberm@slhs.org
Need GC and Revised Value
|
Routing - PLAN CHECK | 4/5/2019 | | 4/8/2019 | | PASS |
Carl Westfall
|
|
|
check changemarks. delete all that are unresolved and all that are on final versions.
|
Routing PW Street Lights | 4/8/2019 | | 4/8/2019 | | PASS |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 4/5/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/20/2019 | | DONE |
|
|
|
|
Routing PW Street Lights | 2/20/2019 | | 2/20/2019 | | FAIL |
Tom Marshall
|
|
|
|
Routing - PLAN CHECK | 2/20/2019 | | 2/20/2019 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals requested | | | 2/20/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/15/2019 | | DONE |
|
|
|
|
Routing - PLUMBING | 2/11/2019 | | 2/13/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Street Lights | 2/11/2019 | | 2/13/2019 | | FAIL |
Tom Marshall
|
|
|
Conduit for city street lights is 2". The reference to D2A is a 1" conduit not acceptable.
|
Routing - Design Review | 2/11/2019 | | 2/11/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Sewer Design | 2/11/2019 | | 2/11/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - PLAN CHECK | 2/6/2019 | | 2/11/2019 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 2/6/2019 | | DONE |
|
|
|
The resubmittal came in at 11:09 PM on a Wednesday. The Plans Examiner was gone on vacation Thursday and Friday. The drawings were routed on Monday (2-11-19).
|
Plan resubmittals requested | | | 1/4/2019 | | DONE |
|
|
|
|
Routing - FIRE | 12/14/2018 | | 1/4/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLUMBING | 12/14/2018 | | 12/20/2018 | | FAIL |
Daryl Spivey
|
|
|
See markups and redlines on plans.
|
Routing Off Site - STRUCTURAL | 12/14/2018 | | 12/20/2018 | | PASS |
Carl Westfall
|
|
|
Jared Bauder (CH2MHill)
|
Routing - Design Review | 12/19/2018 | | 12/19/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Sewer Design | 12/14/2018 | | 12/19/2018 | | FAIL |
DeAnn Brown
|
|
|
Add sewer tap permit language to sheet C4.10
|
Routing PW Street Lights | 12/14/2018 | | 12/17/2018 | | FAIL |
Tom Marshall
|
|
|
Sheets ES101, C4.00, El700 are unreadable. Sheet L2.1 needs some changes to be made.
|
Routing - Design Review | 12/14/2018 | | 12/17/2018 | | FAIL |
Andrea Tuning
|
|
|
Provide additional transparency for the rehabilitation wall located at Fairview and 27th. The openings should provide a consistent 1'4" CMU base from grade with horizontal fencing above that. Add one additional metal fence panel in the north elevation as well.
Please provide a detail of teh fencing material to ensure it is transparent and open as opposed to being more of a louver type system.
|
Routing - MECHANICAL | 12/14/2018 | | 12/17/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 12/9/2018 | | 12/15/2018 | | PASS |
Carl Westfall
|
|
|
Pending structural. Structural approved December 20, 2018.
|
Plan resubmittals received | | | 12/9/2018 | | DONE |
|
|
|
Several sheets were not given the exact name as the sheet they were intended to replace. This was corrected. Routing was delayed because the review of another project had to be completed.
|
Route to Impact Fee Review | 7/18/2018 | 7/21/2018 | 7/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/18/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 7/18/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/23/2018 | | 7/18/2018 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - FIRE | 5/23/2018 | 5/23/2018 | 7/6/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing Off Site - STRUCTURAL | 5/23/2018 | | 6/11/2018 | | FAIL |
Carl Westfall
|
|
|
Jared Bauder (CH2MHill)
|
Routing PW Environmental | 5/23/2018 | | 6/7/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 5/23/2018 | | 6/5/2018 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 5/23/2018 | | 6/1/2018 | | FAIL |
Bill VanDegrift
|
|
|
see change marks in e-plan
med gas calculations
size misc waste and vent
etc.
|
Routing - PUBLIC WORKS | 5/23/2018 | | 5/31/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Sewer Design | 5/23/2018 | | 5/31/2018 | | FAIL |
DeAnn Brown
|
|
|
Please submit site civil plans that are referred to in plumbing plans.
|
Routing PW Solid Waste | 5/23/2018 | | 5/30/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 5/23/2018 | | 5/29/2018 | | |
Brian Murphy
|
|
|
no review required
|
Routing Off Site - C.D.H | 5/23/2018 | | 5/24/2018 | | PASS |
Carl Westfall
|
|
|
Scott Paradis
|
Routing - PLANNING | 5/23/2018 | | 5/24/2018 | | PASS |
Cody Riddle
|
|
|
CUP17-00057
|
Routing - Addressing | 5/23/2018 | | 5/23/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/23/2018 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/23/2018 | | DONE |
Christina Prado
|
|
|
|
Routing - Design Review | 5/23/2018 | | 5/23/2018 | | FAIL |
Andrea Tuning
|
|
|
DRH17-00427
Prior to issuance of building permits, a record of survey for a parcel consolidation shall be completed to demonstrate compliance with building code requirements for any construction over or adjacent to property lines.
Stripe the parking stall adjacent to 27th Street to be 20-feet in depth or identify these spaces as compact spaces.
Reduce the proposed screen wall located around the loading area to meet the 10-foot building setback.
Install a minimum of 41 accessible parking stalls on the site.
Provide a minimum of 47 bicycle parking spaces with a minimum of 24 of the bicycle spaces being covered.
for the parking structure.
Obtain a license agreement for landscaping located within the public right-of-way.
Construct the screen wall adjacent to the loading area as a 4-foot tall CMU base with the metal railing extending between the 6-foot columns the additional 2-feet.
Provide additional transparency within the fencing along Fairview Avenue.
Locate all pole lights to be outside of the required setbacks and outside of any required landscape planters.
|
Routing - Erosion and Sediment | 5/23/2018 | | 5/23/2018 | | PASS |
Michael Zawacki
|
|
|
SWPPP approved under site development plan ESC17-01632.
Dewatering stated in SWPPP. Plan will need to be reviewed and approved before any dewatering activity begins.
|
Routing PW Street Lights | 5/23/2018 | | 5/23/2018 | | FAIL |
Tom Marshall
|
|
|
Street light plan incomplete and sometimes incorrect.
|
Intake Approval | | | 5/23/2018 | | PASS |
|
|
|
|
Intake Approval | | | 3/27/2018 | | FAIL |
Julie Romig
|
|
|
1. Verification of Legal Lot or Parcel form signed by PDS Subdivision Staff. Contact Todd Tucker at TTucker@cityofboise.org.
2. The City of Boise adopted the 2015 codes Jan. 1, 2018. Please submit a letter requesting a review under the 2012 IBC and associated codes in effect in 2017. Include in the letter the reason for request - that the concrete and steel package was already submitted and approved under the 2012 codes.
3. Provide PDF of CDHD signed approved plan, or provide Food Establishment License application and Food Establishment Plan Review/Approval Form.
|
Application received | | | 3/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 24 2018 2:14PM
|
BLD-Conference | 4/1/2020 | 4/8/2020 | | A | |
Mike Jordan
|
|
|
|