Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD18-01027
StatusIssued
Name ST LUKES HEALTH SYSTEM LTD
Site Address 2619 W FAIRVIEW AVE
Project NameSt. Luke's - Hospital and MOB
Customer NumberBLD17-04285
ePlanReviewYes
Description
(ST. LUKE’S – 27TH STREET DEVELOPMENT – HOSPITAL AND MEDICAL OFFICE BUILDING – ENVELOPE AND TENANT IMPROVEMENT PACKAGE) (DRH17-00427) (CUP17-00057) The fire sprinkler system is used for occupancy. To complete the envelope and tenant improvement phase (Package II) for a new hospital and medical office building. This building has a total floor area of about 223,500 square feet (about 73,500 square feet 1st story, about 71,500 square feet 2nd story, about 53,500 square feet 3rd story, and about 25,000 square feet 4th story). The hospital portion (about 121,000 square feet total) is 3 stories tall with a penthouse and the medical office portion (about 102,500 square feet total) is 4 stories tall with a penthouse. The concrete and structural steel phase was done under permit BLD17-04285. Work is to include insulated metal stud exterior walls (masonry veneer, metal composite wall panels, metal wall panels, EIFS, etc.), exterior windows, exterior doors, roof insulation installed on top of the steel roof deck, membrane roof coverings, steel roofing, interior nonbearing walls, interior doors, interior windows, several multi-user toilet rooms accessible to the disabled, several single-user toilet rooms accessible to the disabled, 30 hospital sleeping rooms accessible to the disabled (except for toilets in bariatric toilet rooms), hospital operating rooms, storage rooms, exam rooms, 2-hr fire barrier walls to function as occupancy separations and to also comply as smoke barriers between the hospital and medical office (also required to function as a horizontal exit on the 2nd story so that the maximum travel distance will not exceed 200 feet long), 2-hr fire barrier walls to create 4 stairway enclosures, an open stairway between the 1st and 2nd stories within the B Occupancy, 1-hr smoke barrier walls within the hospital to create smoke compartments, 1-hr fire barrier walls to create incidental use separations within the hospital, smoke partitions to create hospital care suites, smoke partitions to create I-2 rated corridors within the hospital, three elevators to serve 4 stories (one of the elevators extends to the roof), three elevators within the hospital to serve 3 stories, a mechanical penthouse above the hospital portion, a mechanical penthouse above the medical office portion, a full service kitchen within the hospital portion on the 1st story (Type I grease hood and duct system, Type II dishwasher hood and duct system, walk-in cooler, walk-in freezer, etc.), a dining area on the 1st story of the hospital, structural support for medical equipment (MRI, CT, X-ray, patient lifts, exam lights, etc.), structural support for folding partitions and air plenums, suspended acoustical ceilings, suspended gypsum board ceilings, millwork, and finishes. Three exterior canopies, a fenced rehab yard, and a fenced utility yard (generator, transformers, cooling tower, trash compactors, etc.) will also be constructed under this permit. Special Inspection is required for concrete, masonry, steel (including welding and bolting), fire-resistance coatings, fire stopping, and anchors post-installed in hardened concrete. This permit is intended to establish a Certificate of Occupancy for the entire building. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72, including the smoke detection system, as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in6/24/20208/5/20208/5/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in6/24/20207/29/20207/29/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in6/24/20207/22/20207/22/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in6/24/20207/15/20207/15/2020ACANC
DetailsMike Jordan
BLD-Conference7/15/20207/15/20207/15/2020ADONE
DetailsMike Jordan
On site to meet new general contractor.
BLD-Framing/Rough-in6/24/20207/8/20207/8/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in6/24/20207/1/20207/1/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in5/27/20206/24/20206/24/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in5/27/20206/17/20206/17/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in5/27/20206/10/20206/10/2020ADONE
DetailsMike Jordan
Walk through on work in progress on MOB side of building.
BLD-Framing/Rough-in5/27/20206/3/20206/3/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in4/29/20205/27/20205/27/2020APEND
DetailsMike Jordan
1st. floor walk thru only on MOB side. Work is in progress.
BLD-Framing/Rough-in4/29/20205/20/20205/20/2020ADONE
DetailsMike Jordan
Reviewed submittal for T ratings from YMC. Awaiting approval from architect.
BLD-Framing/Rough-in4/29/20205/13/20205/13/2020APASS
DetailsMike Jordan
3rd level MOB interior steel stud framed walls at hand therapy room ok to cover only.
BLD-Framing/Rough-in4/29/20205/6/20205/7/2020ACANC
DetailsDave Hannah
BLD-Framing/Rough-in4/9/20204/29/20204/29/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in4/9/20204/22/20204/22/2020APASS
DetailsMike Jordan
3rd. floor line set through pentrations have been repaired and ok to cover. observed in progress work on 3rd and 4th floors, MOB side.
BLD-Framing/Rough-in4/9/20204/15/20204/15/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in4/3/20204/3/20204/3/2020AFAIL
DetailsMike Jordan
Through penetrations for line sets on level 3 and 4 MOB area is not installed per the supplied UL listing.
BLD-Framing/Rough-in4/2/20204/2/20204/3/2020ACANC
DetailsMike Jordan
BLD-Conference3/6/20204/1/20204/1/2020ADONE
DetailsMike Jordan
Level 3 MOB side. Noted that linesets have been firecaulked. No listing from sub contractor has been provided. Linesets to remain uncovered until listing has been provided and completed work is approved.
BLD-Conference3/6/20203/25/20203/25/2020ADONE
DetailsMike Jordan
BLD-Framing/Rough-in3/25/20203/25/20203/25/2020APART
DetailsMike Jordan
One siding in progressing on level 3 MOB framing. Still needs to firestop and provide UL listing for line sets in RM.3W235 and noted the plumbing pipes in Rm 3W228 not firestopped yet, will require a T rating.
BLD-Other3/20/20203/23/20203/23/2020APASS
DetailsMike Jordan
through floor and monicot.. level 3 // Rocky Phone #: ###-####. 3rd. level MOB interior steel stud framed walls and rated floor penetrations. grids 4W to 11W. See plans for marked locatons.
BLD-Conference3/6/20203/18/20203/18/2020ADONE
DetailsMike Jordan
BLD-Wall cover3/11/20203/12/20203/12/2020APASS
DetailsMike Jordan
Ken Phone #: ###-####. Issues resolved on level 2 MOB side, grids 3W to 8W. All fire proofing patch backs ok. Ok to cover. Plumbing penetrations to be firestopped from underneath.
BLD-Conference3/6/20203/11/20203/11/2020ANR
DetailsMike Jordan
Walk through to visualy inspect MOB level 2 areas for patch backs on fireproofing and fire rated penetrations. Will reinspect tomorrow.
BLD-Conference3/5/20203/6/20203/6/2020AFAIL
DetailsMike Jordan
Ken Phone #: ###-####. Level 2 framing from grid 8W going west has been covered. Contractor to remove sheetrock around columns and at 10 random locations were there are floor penetrations to ensure firestopping has been completed.
BLD-Wall cover2/12/20202/14/20202/14/2020APASS
DetailsMike Jordan
Ken Phone #: ###-####. Interior steel stud non rated walls at level 2 MOB at grids 8W.5 to 10W.5 and grids B.6 to grids D.8. Also grids B.5 to B.4 and grids 7W to 10W.5. Noted that non combustible plumbing pie to be fire stop from underneath due to pipe clamp interfierance. Also noted select areas were fire proofing on columns will need to be hand patched, these ares will be left uncovered for reinspection.
BLD-Conference2/4/20202/5/20202/5/2020ADONE
DetailsMike Jordan
Ken Phone #: ###-####. Walk through on 1st and 2nd. floors.
BLD-Wall cover1/23/20201/24/20201/24/2020ACANC
DetailsMike Jordan
Ken Phone #: ###-####
BLD-Other1/24/20201/24/20201/24/2020PDONE
DetailsMike Jordan
3rd floor MOB walk through.
BLD-Framing/Rough-in1/13/20201/13/20201/14/2020PDONE
DetailsDave Hannah
Ken Phone #: ###-####
BLD-Framing/Rough-in1/6/20201/7/20201/13/2020PPEND
DetailsDave Hannah
Ken Phone #: ###-####
BLD-Framing/Rough-in1/8/20201/8/20201/13/2020PPEND
DetailsDave Hannah
Ken Phone #: ###-####
BLD-Framing/Rough-in1/2/20201/2/20201/7/2020PPEND
DetailsDave Hannah
BLD-Framing/Rough-in11/21/201911/22/201911/22/2019APASS
DetailsMike Jordan
Ken Phone #: ###-####. Interior steel stud framed walls, 1hr. fire barrier walls, 1hr. smoke barrier walls and smoke partitions at level 2 area D at grids 9E to 12E and grids FF to JJ. Also 1hr. smoke barrier corridor wall grid 7E to 12E, south side.
BLD-Other8/22/20198/23/20198/23/2019APART
DetailsDave Hannah
fire culking // tim Phone #: ###-####
BLD-Other8/23/20198/23/20198/23/2019PCANC
DetailsDave Hannah
fire culking // tim Phone #: ###-####
BLD-Framing/Rough-in8/8/20198/8/20198/8/2019PPART
DetailsDave Hannah
ken Phone #: ###-#### walked project with super and framing contractor looked at both int and ext walls all looking good they will add some more shots to bottom track on ext and get me some details for int track
Issue PAID IN FULL permit  6/27/2019 DONE
Print Occupancy Form  6/27/2019 DONE
OVERRIDE  4/9/2019  
Plan assigned to (CJW)5/23/20185/23/20184/9/2019 PASS
DetailsCarl Westfall
(4th done) 06/26/18 (new - 25 days) (ePlan - 693 sheets) St. Lukes Orthopedic (routed to staff)
PLANS/APPL TAKEN TO FRONT DESK  4/9/2019 DONE
Extend Review Timeline  4/9/2019 DONE
1st extention approved, see attached document. New exp. date is 3/19/19
Extend Review Timeline  4/9/2019 DONE
2nd extention approved, see attached document. New exp. date is 9/15/19
Permit Ready to Issue  4/9/2019 DONE
all met: dahlberm@slhs.org

Need GC and Revised Value
Routing - PLAN CHECK4/5/2019 4/8/2019 PASS
DetailsCarl Westfall
check changemarks. delete all that are unresolved and all that are on final versions.
Routing PW Street Lights4/8/2019 4/8/2019 PASS
DetailsTom Marshall
Plan resubmittals received  4/5/2019 DONE
Plan resubmittals received  2/20/2019 DONE
Routing PW Street Lights2/20/2019 2/20/2019 FAIL
DetailsTom Marshall
Routing - PLAN CHECK2/20/2019 2/20/2019 PASS
DetailsCarl Westfall
Plan resubmittals requested  2/20/2019 DONE
Plan resubmittals requested  2/15/2019 DONE
Routing - PLUMBING2/11/2019 2/13/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing PW Street Lights2/11/2019 2/13/2019 FAIL
DetailsTom Marshall
Conduit for city street lights is 2". The reference to D2A is a 1" conduit not acceptable.
Routing - Design Review2/11/2019 2/11/2019 PASS
DetailsAndrea Tuning
Routing PW Sewer Design2/11/2019 2/11/2019 PASS
DetailsDeAnn Brown
Routing - PLAN CHECK2/6/2019 2/11/2019 PASS
DetailsCarl Westfall
Plan resubmittals received  2/6/2019 DONE
The resubmittal came in at 11:09 PM on a Wednesday. The Plans Examiner was gone on vacation Thursday and Friday. The drawings were routed on Monday (2-11-19).
Plan resubmittals requested  1/4/2019 DONE
Routing - FIRE12/14/2018 1/4/2019 PASS
DetailsErika Akin
Attached comments to case
Routing - PLUMBING12/14/2018 12/20/2018 FAIL
DetailsDaryl Spivey
See markups and redlines on plans.
Routing Off Site - STRUCTURAL12/14/2018 12/20/2018 PASS
DetailsCarl Westfall
Jared Bauder (CH2MHill)
Routing - Design Review12/19/2018 12/19/2018 PASS
DetailsAndrea Tuning
Routing PW Sewer Design12/14/2018 12/19/2018 FAIL
DetailsDeAnn Brown
Add sewer tap permit language to sheet C4.10
Routing PW Street Lights12/14/2018 12/17/2018 FAIL
DetailsTom Marshall
Sheets ES101, C4.00, El700 are unreadable. Sheet L2.1 needs some changes to be made.
Routing - Design Review12/14/2018 12/17/2018 FAIL
DetailsAndrea Tuning
Provide additional transparency for the rehabilitation wall located at Fairview and 27th. The openings should provide a consistent 1'4" CMU base from grade with horizontal fencing above that. Add one additional metal fence panel in the north elevation as well.

Please provide a detail of teh fencing material to ensure it is transparent and open as opposed to being more of a louver type system.
Routing - MECHANICAL12/14/2018 12/17/2018 PASS
DetailsTroy James
Routing - PLAN CHECK12/9/2018 12/15/2018 PASS
DetailsCarl Westfall
Pending structural. Structural approved December 20, 2018.
Plan resubmittals received  12/9/2018 DONE
Several sheets were not given the exact name as the sheet they were intended to replace. This was corrected. Routing was delayed because the review of another project had to be completed.
Route to Impact Fee Review7/18/20187/21/20187/19/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  7/18/2018 DONE
Plan resubmittals requested  7/18/2018 DONE
Routing - PLAN CHECK5/23/2018 7/18/2018 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - FIRE5/23/20185/23/20187/6/2018 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
Routing Off Site - STRUCTURAL5/23/2018 6/11/2018 FAIL
DetailsCarl Westfall
Jared Bauder (CH2MHill)
Routing PW Environmental5/23/2018 6/7/2018 PASS
DetailsRick Christenson
Routing - MECHANICAL5/23/2018 6/5/2018 FAIL
DetailsTroy James
Routing - PLUMBING5/23/2018 6/1/2018 FAIL
DetailsBill VanDegrift
see change marks in e-plan
med gas calculations
size misc waste and vent
etc.
Routing - PUBLIC WORKS5/23/2018 5/31/2018 PASS
DetailsMorgan Webb
Routing PW Sewer Design5/23/2018 5/31/2018 FAIL
DetailsDeAnn Brown
Please submit site civil plans that are referred to in plumbing plans.
Routing PW Solid Waste5/23/2018 5/30/2018 PASS
DetailsEvan Carpenter
Routing PW Drainage5/23/2018 5/29/2018  
DetailsBrian Murphy
no review required
Routing Off Site - C.D.H5/23/2018 5/24/2018 PASS
DetailsCarl Westfall
Scott Paradis
Routing - PLANNING5/23/2018 5/24/2018 PASS
DetailsCody Riddle
CUP17-00057
Routing - Addressing5/23/2018 5/23/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  5/23/2018 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  5/23/2018 DONE
DetailsChristina Prado
Routing - Design Review5/23/2018 5/23/2018 FAIL
DetailsAndrea Tuning
DRH17-00427
Prior to issuance of building permits, a record of survey for a parcel consolidation shall be completed to demonstrate compliance with building code requirements for any construction over or adjacent to property lines.

Stripe the parking stall adjacent to 27th Street to be 20-feet in depth or identify these spaces as compact spaces.

Reduce the proposed screen wall located around the loading area to meet the 10-foot building setback.

Install a minimum of 41 accessible parking stalls on the site.

Provide a minimum of 47 bicycle parking spaces with a minimum of 24 of the bicycle spaces being covered.
for the parking structure.

Obtain a license agreement for landscaping located within the public right-of-way.

Construct the screen wall adjacent to the loading area as a 4-foot tall CMU base with the metal railing extending between the 6-foot columns the additional 2-feet.

Provide additional transparency within the fencing along Fairview Avenue.

Locate all pole lights to be outside of the required setbacks and outside of any required landscape planters.
Routing - Erosion and Sediment5/23/2018 5/23/2018 PASS
DetailsMichael Zawacki
SWPPP approved under site development plan ESC17-01632.
Dewatering stated in SWPPP. Plan will need to be reviewed and approved before any dewatering activity begins.
Routing PW Street Lights5/23/2018 5/23/2018 FAIL
DetailsTom Marshall
Street light plan incomplete and sometimes incorrect.
Intake Approval  5/23/2018 PASS
Intake Approval  3/27/2018 FAIL
DetailsJulie Romig
1. Verification of Legal Lot or Parcel form signed by PDS Subdivision Staff. Contact Todd Tucker at TTucker@cityofboise.org.
2. The City of Boise adopted the 2015 codes Jan. 1, 2018. Please submit a letter requesting a review under the 2012 IBC and associated codes in effect in 2017. Include in the letter the reason for request - that the concrete and steel package was already submitted and approved under the 2012 codes.
3. Provide PDF of CDHD signed approved plan, or provide Food Establishment License application and Food Establishment Plan Review/Approval Form.
Application received  3/24/2018 DONE
Application submitted via PDS Online on Mar 24 2018 2:14PM
BLD-Conference4/1/20204/8/2020 A 
DetailsMike Jordan