Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD18-02644
StatusFinaled
Name HC COMPANY INC
Site Address 707 N ARMSTRONG PL
Project NameCDHD Interior Remodel
Customer Number 
ePlanReviewYes
Description
(CENTRAL DISTRICT HEALTH DEPARTMENT (CDHD) – INTERIOR REMODEL) (10-14-19 PLAN MODIFICATION TO CONSTRUCT AN INTERIOR NONBEARING WALL TO SEPARATE OFFICE 357 FROM A STORAGE AND HALLWAY AREA.) (10-7-19 PLAN MODIFICATION TO ENCLOSE ELECTRICAL EQUIPMENT IN A ROOM (I.E. ELECTRICAL ROOM 150) AND TO ADD A LIGHT FIXTURE AND SWITCH. WORK IS TO INCLUDE A WALL AND A DOOR.) (5-29-19 PLAN MODIFICATION TO CONVERT HALF OF AN EXISTING STORAGE ROOM INTO A JANITOR’S CLOSET. WORK INCLUDES AN INTERIOR NONBEARING WALL, MOP SINK, PLUMBING, AND AN EXHAUST FAN.) The fire sprinkler system is used for building area increase and for code trade-offs. To remodel about 20,000 square feet of area within an existing 42,606 square foot building for the existing whole building tenant. A large portion of this building is used as an outpatient medical clinic where no one is rendered incapable of self-preservation. Work includes interior nonbearing walls, interior doors, interior windows, five (5) single-user toilet rooms accessible to the disabled, a new exterior door, suspended acoustical ceilings, gypsum board ceilings and soffits, millwork, and finishes. Structural work includes reinforced concrete footings, enlarged existing reinforced concrete footings, steel columns with steel base plates and anchor bolts, and wood beams. Special Inspection is required for soils, concrete, post-installed anchors in hardened concrete, and for steel fabrication including welding. The proposed work will be done in phases. A compliant means of egress is required to be maintained from each occupied portion of this building for the duration of the construction project. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit is intended to establish a new Certificate of Occupancy for the entire building. The fire sprinkler system is required to comply with NFPA 13, including changing all fire sprinkler heads to quick-response, and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/11/20202/14/2020 DONE
This permit finaled on the web by Jeremy Barber
Second Notice 1/9/20202/6/2020 DONE
MAILED 2-7-20
First Notice12/11/201912/11/201912/30/2019 DONE
DetailsMike Jordan
mailed 1-1-20
BLD-Final12/10/201912/11/201912/11/2019PPASS
DetailsMike Jordan
Jason Phone #: ###-####
DOC - Permit Finaled12/11/201912/11/201912/11/2019PPASS
DetailsMike Jordan
FIRE-Final Inspection12/10/201912/11/201912/11/2019APASS
DetailsTroy Cobbley
Life safety passed.

Jason - ###-####
FIRE-Conference12/6/201912/6/201912/6/2019PDONE
DetailsTroy Cobbley
Jason and I went over life safety requirements for the remaining phase of work for this project. Need verification that exit discharge lights will not be required out of the two remaining marked exits.
BLD-Ceiling Grid Inspection11/20/201911/20/201911/20/2019PPASS
DetailsMike Jordan
Jason Phone #: ###-####
CHANGE STATUS TO (ISS)  10/15/2019 DONE
plan mod fee paid change to ISS status
Routing - PLAN CHECK10/10/2019 10/14/2019 PASS
DetailsCarl Westfall
Plan mod review approved
Plan Reviewer's activity  10/14/2019 PASS
Plan mod review approved
Permit Ready to Issue  10/14/2019 DONE
plan mod
Plan assigned to (CJW)10/8/2019 10/14/2019 PASS
DetailsGemma Flores
3rd plan mod CDHC (at permits desk after plan intake review)
BLD-Framing/Rough-in10/11/201910/11/201910/11/2019PPASS
DetailsBrandon Shaw
Final phase...
Routing - PLAN CHECK10/8/2019 10/10/2019 PASS
DetailsCarl Westfall
3rd plan mod plan intake review approved
Plan Modification Accepted  10/8/2019 DONE
3rd plan mod submitted by Richard Carlos. Adding a wall between Office - PWS Brent 357 and Hallway 361. Sheet A2.01, A2.11b, A9.01 and D2.02
Plan assigned to (CJW)10/3/201910/3/201910/7/2019 PASS
DetailsCarl Westfall
plan mod - Central District Health Department (plan intake approved)
Plan Reviewer's activity  10/7/2019 PASS
2nd plan mod approved
Permit Ready to Issue  10/7/2019 DONE
PLAN MOD
Print Occupancy Form  10/7/2019 DONE
Routing - PLAN CHECK10/3/2019 10/3/2019 PASS
DetailsCarl Westfall
Plan intake review
Plan Modification Accepted  10/3/2019 DONE
Plan mod-CURRENTLY ELECTRICAL ROOM 150 IS OPEN TO HALLWAY 156. WE ARE MODIFYING THIS SPACE BY ENCLOSING IT WITH A WALL AND DOOR. WE ARE ALSO ADDING A LIGHT FIXTURE AND SWITCH TO ELECTRICAL ROOM 150-sheets A2.01, A2.11a, A7.01, A9.01, E0.02, AND E1.11A-no valuation fees will change-assigned to Carl W
BLD-Final8/16/20198/19/20198/19/2019APART
DetailsMike Jordan
CAMERON Phone #: ###-####. ,Phase 2 ok to occupy.
BLD-Final8/14/20198/16/20198/16/2019PCANC
DetailsMike Jordan
Cameron Phone #: ###-####
FIRE-Final Inspection8/14/20198/15/20198/15/2019AFAIL
DetailsTroy Cobbley
This life safety inspection was for Phase 2. The phase 2 fire sprinkler and fire alarm work needs to be completed. I noted exit signs missing and one area that needs the exit sign repaired and emergency lighting provided.. Also Jason agreed that an old aluminum door with a deadbolt will be removed.

Jason Phone #: ###-####
BLD-Ceiling Grid Inspection7/16/20197/17/20197/17/2019APASS
DetailsMike Jordan
Jason Phone #: ###-####
BLD-Ceiling Grid Inspection7/2/20197/3/20197/3/2019PPART
DetailsMike Jordan
Cameron Phone #: ###-####-please call prior to meet. Ceiling grid in phase 2 ok pending MEP's rough in inspections.
CHANGE STATUS TO (ISS)  7/2/2019 DONE
Print Occupancy Form  7/2/2019 DONE
plan mod
Plan assigned to (CJW)5/21/20195/21/20195/29/2019 PASS
DetailsCarl Westfall
Plan mod - CDHD new mop sink (routed to staff)
Plan Reviewer's activity  5/29/2019 PASS
Plan mod approved
Permit Ready to Issue  5/29/2019 DONE
plan mod so please do not re-issue
5-30-19 Plan mod fees paid **SEWER FEES STILL DUE**
Routing - MECHANICAL5/22/2019 5/28/2019 PASS
DetailsTroy James
Exhaust fan
Routing PW Sewer Rating5/22/2019 5/23/2019 PASS
DetailsMorgan Webb
Added mop sink
Routing - PLUMBING5/22/2019 5/23/2019 PASS
DetailsDaryl Spivey
new mop sink-install per ISPC
Routing - PLAN CHECK5/21/2019 5/22/2019 PASS
DetailsCarl Westfall
Plan mod plan intake review approved. Sent to permits desk.
Routing - PLAN CHECK5/22/2019 5/22/2019 PASS
DetailsCarl Westfall
Plan mod review approved
Plan resubmittals received  5/21/2019 DONE
convert half of existing storage room 130 into a janitor's closet
BLD-Framing/Rough-in5/16/20195/16/20195/16/2019PPASS
DetailsMike Jordan
Jason Phone #: ###-####. Interior steel stud framed walls only for phase 2 ok.
BLD-Framing/Rough-in5/14/20195/14/20195/14/2019PNR
DetailsMike Jordan
Jason Phone #: ###-####. Needs plumbing and electrical rough in inspections first.
BLD-Final3/27/20193/27/20193/27/2019PPART
DetailsMike Jordan
jason Phone #: ###-####. Ok to occupy phase 1.
FIRE-Final Inspection3/27/20193/27/20193/27/2019PPART
DetailsTroy Cobbley
Life safety passed for the phase 1 area of work.

jason Phone #: ###-####
BLD-Final3/26/20193/26/20193/26/2019PNR
DetailsMike Jordan
Jason Phone #: ###-####
FIRE-Final Inspection3/25/20193/26/20193/26/2019AFAIL
DetailsTroy Cobbley
Need panic hardware as shown on the approved drawings, need occupant load signs, need addtional emergency lights/exit discharge lights as discussed.

Jason Phone #: ###-####
FIRE-Conference3/18/20193/18/20193/18/2019PDONE
DetailsTroy Cobbley
Jason and I spoke about fire sprinkler and fire alarm isuues that need addressed prior to a phase 1 approval.
BLD-Ceiling Grid Inspection1/28/20191/28/20191/28/2019PPART
DetailsMike Jordan
jason Phone #: ###-####..Ceiling grid for phase 1 ok pending MEP's.
BLD-Framing/Rough-in1/10/20191/11/20191/11/2019APASS
DetailsMike Jordan
Jason Phone #: ###-####. Hardlids and soffits for phase 1 area A. Pending fire sprinkler rough in inspection.
BLD-Framing/Rough-in12/17/201812/18/201812/18/2018PPASS
DetailsMike Jordan
Jason Phone #: ###-####. INterior stel stud framed walls for phase 1. Grids 3 to 8.
Issue PAID IN FULL permit  11/14/2018 DONE
Print Occupancy Form  11/14/2018 DONE
Routing - FIRE10/11/201810/15/201810/15/2018 PASS
DetailsErika Akin
Attached comments to case
Plan assigned to (CJW)8/15/20188/15/201810/15/2018 PASS
DetailsCarl Westfall
(2nd done) 08/30/18 (L3 - 15 days) (ePlan - 76 sheet) CDHD Office
PLANS/APPL TAKEN TO FRONT DESK  10/15/2018 DONE
Permit Ready to Issue  10/15/2018 DONE
NEED- all met
GC FORM-met
REVISED VALUE
Routing - PLAN CHECK10/10/2018 10/11/2018 PASS
DetailsCarl Westfall
Plan resubmittals received  10/10/2018 DONE
Route to Impact Fee Review9/24/20189/27/20189/25/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK8/15/2018 9/24/2018 FAIL
DetailsCarl Westfall
Revised drawings required
1st review completed  9/24/2018 DONE
Plan resubmittals requested  9/24/2018 DONE
Routing - FIRE8/15/20188/15/20189/10/2018 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
Routing Off Site - STRUCTURAL8/15/2018 8/27/2018 PASS
DetailsCarl Westfall
Chris Holladay (AHJ)
Routing - MECHANICAL8/15/2018 8/20/2018 PASS
DetailsTroy James
Routing - PLUMBING8/15/2018 8/20/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - PUBLIC WORKS8/15/2018 8/17/2018 PASS
DetailsMorgan Webb
Routing - Addressing8/15/2018 8/16/2018 PASS
DetailsDoug Chausow
Intake Approval  8/10/2018 PASS
Application received  7/25/2018 DONE
Application submitted via PDS Online on Jul 25 2018 7:37AM