Site Final | 10/18/2019 | 11/4/2019 | 11/6/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 11/1/2019 | 11/1/2019 | 11/6/2019 | P | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 10/18/2019 | 10/18/2019 | 10/18/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/16/2019 | 9/16/2019 | 9/17/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/15/2019 | 8/15/2019 | 8/16/2019 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout from site. Will need to clean up parking lot before ESC site final
|
General Inspection | 7/15/2019 | 7/15/2019 | 7/15/2019 | | PASS |
Michael Zawacki
|
|
|
Site still needs landscaping. Rear is being prepped for paving, forms being placed for ped ramps.
|
General Inspection | 6/7/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Michael Zawacki
|
|
|
Building exterior and playground completed. Crew starting to clean extra fill around building. Nothing leaving site, kind of dirty. Only contractors on site are electrical.
|
General Inspection | 6/7/2019 | 6/7/2019 | 6/7/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/6/2019 | 5/6/2019 | 5/8/2019 | | PASS |
Michael Zawacki
|
|
|
Building exteriors completed. Area is still bare. Some dirt in rear lot by building, none leaving or tracking out.
|
General Inspection | 4/5/2019 | 4/5/2019 | 4/8/2019 | | PART |
Michael Zawacki
|
|
|
Lots of mud in parking lot that has been closed to public and being used for workers, no trackout leaving site. Dumpster on site, some wind blown trash. Roof drains go onto bare dirt. Inlet in lot has witches hat.
|
General Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 | | PART |
Michael Zawacki
|
|
|
Lots of mud in contractor parking lot from genie lift. No dirt is leaving site.
|
General Inspection | 1/29/2019 | 1/29/2019 | 1/29/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. Some dirt in parking lot, none going past the work site that is blocked.
|
General Inspection | 12/12/2018 | 12/12/2018 | 12/14/2018 | | PART |
Michael Zawacki
|
|
|
Met with foreman on site. Suez & Titanium trenched and ran new water line around perimeter, have swept but needs another pass. Concrete washout nearly full, done with pours until sidewalks in March. Some mud in parking area, will have it cleaned when crews return on Monday.
|
Permit Ready to Issue | | | 7/31/2018 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 7/31/2018 | | DONE |
|
|
|
|
Application received | | | 3/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 7 2018 7:47AM
|