INSP-Final Inspection | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PART |
Troy Cobbley
|
|
|
Fire alarm work complete for phase 4. See the city approved plans for the clouded area in red for the specific devices witnessed.
Brian Phone #: ###-####
|
INSP-Final Inspection | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PART |
Troy Cobbley
|
|
|
Phase 4 fire alarm complete. See the city approved plans for the area clouded in red that was inspected for phase 4. Brian Phone #: ###-####
|
INSP-Final Inspection | 10/9/2019 | 10/10/2019 | 10/10/2019 | A | FAIL |
Troy Cobbley
|
|
|
Placement and function tested. for phase 4 but tech could not provide verification for the candella settings for the strobes in the scope of work. Brian Phone #: ###-####
|
INSP-Final Inspection | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | FAIL |
Troy Cobbley
|
|
|
On site fire man asked us to reschedule since they are using the phase 4 area. Brian Phone #: ###-####
|
INSP-Alarm Testing | 2/15/2019 | 2/15/2019 | 2/15/2019 | P | PART |
Jim Page
|
|
|
Fire alarm testing for phase 3 complete, LF sound bases in rooms were a steady tone when alarms are active, LF bases need to be temporal 3 with the rest of the system, temporal sound fo LF bases will need to be verified at final inspection.
After 1PM if possible. Phone #: ###-#### Inspection requested via web by Gary Gambino
|
INSP-Final Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PART |
Troy Cobbley
|
|
|
Todays inspection was to verify that the fiber optic interconnection is functional which it was.
ARFF added to all devices descriptions going to the main panel. Phone #: ###-#### Inspection requested via web by Gary Gambino
|
INSP-Alarm Testing | 1/30/2019 | 2/1/2019 | 2/1/2019 | A | FAIL |
Troy Cobbley
|
|
|
The signals did go to the airport control as device and room number but the airport did not have an actual description of the location on site for the alarm. Gary is going to add description and reschedule.
Re-inspect after placing ARFF building on airport network - verification testing that new building reports to the Airport operations center. Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
INSP-Final Inspection | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PART |
Troy Cobbley
|
|
|
Phase 2 work is complete, cellular dialer is being used temporary for 90 days
Phone #: ###-#### Inspection requested via web by Gary Gambino
|
INSP-Final Inspection | 10/24/2018 | 10/25/2018 | 10/25/2018 | P | CANC |
Troy Cobbley
|
|
|
Please call ahead Phone #: ###-#### >> Inspection requested via web by Gary Gambino Inspection cancelled from web by: Gary Gambino
|
INSP-Final Inspection | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | CANC |
Troy Cobbley
|
|
|
Please call ahead Phone #: ###-#### >> Inspection requested via web by Gary Gambino Inspection cancelled from web by: Gary Gambino
|
Meeting | | | 10/24/2018 | | DONE |
|
|
|
Discussed with Ron Johnson JCI's temporary interface to new fire alarm panel via new fiber optic line. If they are unable to provide this, Ron has allowed them to provide a temporary cellular communicator until the fiber connection is ready. He informed them that they will not be required to get an additional permit to provide the temporary cellular communicator.
|
INSP-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | FAIL |
Troy Cobbley
|
|
|
Need to pretest interconnection with the fire sprinkler devices, one 15cd strobe is mounted too high, another 15cd strobe is overspaced, missing two weather proof back boxes, drawings show networking with the airport fire alarm system but networking has not been set up so there is no off site or on site communiction. No actual testing performed.
Please call to schedule exact time. Phone #: ###-#### Inspection requested via web by Gary Gambino
|
Plan resubmittals received | | | 7/25/2018 | | DONE |
|
|
|
Resubmittal includes modifications to the floor plan.
|
Alarm Plan Check | 7/25/2018 | | 7/25/2018 | | PASS |
Lee G Meredith
|
|
|
Plans approved as noted on drawings.
|
PLANS TAKEN FRONT DESK ALARM | | | 7/25/2018 | | DONE |
|
|
|
Plans approved as noted, with review comments.
|
Override - Parcel Holds | | | 7/25/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 7/25/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/25/2018 | | |
|
|
|
|
Issue and Print Permit | | | 7/25/2018 | | DONE |
|
|
|
|
1st review completed | | | 10/25/2017 | | FAIL |
|
|
|
Notification inadequate in several areas. Documentation of engineer of record approval not provided. Returned to applicant for corrections.
|
Application received | | | 10/24/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 24 2017 11:47AM
|
Plan assigned to (Lee) | 10/24/2017 | | 10/24/2017 | | DONE |
Lee G Meredith
|
|
|
|