Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberFIR18-00592
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 12311 W BRADDOCK DR
Project NameSpalding STEM Addition
Customer Number 
ePlanReviewYes
Description
Point of connection to be at existing riser Phoenix to tap into existing system for new 1 Level 8,709 Sq Ft Addition, Occupancy Class E, Construction type V-B
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/27/201812/28/201812/28/2018APASS
DetailsTroy Cobbley
permit finaled

Ken Phone #: ###-####
INSP-Final Inspection12/20/201812/26/201812/26/2018ACANC
DetailsTroy Cobbley
Contact Ken Orahood ###-#### 30 min prior to Fire Final start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank
INSP-Final Inspection12/14/201812/17/201812/17/2018PCANC
DetailsTroy Cobbley
Contact Ken Orahood ###-#### 30 min prior to Fire Final Insp start please

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Final Inspection12/13/201812/14/201812/14/2018ACANC
DetailsTroy Cobbley
Contact Ken Orahood - ###-#### 30 min prior to Fire Final Insp start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro12/11/201812/11/201812/11/2018PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

Contact Ken Orahood ###-#### 30 min prior to Hydro Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in12/5/201812/6/201812/6/2018PPASS
DetailsTroy Cobbley
The remaining sprinkler piping is ok for cover.

Contact Ken Orahood ###-#### 30 Min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in11/19/201811/20/201811/20/2018APASS
DetailsTroy Cobbley
See the city approved plans for locations where piping can be covered that are marked "ok"

Contact Ken Orahood ###-#### 30 Min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in11/9/201811/13/201811/13/2018APASS
DetailsTroy Cobbley
The sprinkler piping above the hardlids in the Restrooms is ok for cover.
INSP-Sprinkler Rough-in11/6/201811/7/201811/7/2018APASS
DetailsTroy Cobbley
See the city approved plans for locations for four heads/piping that the hardlids are ok for cover.


Contact Ken Orahood ###-#### 30 Min prior to RTC Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in10/1/201810/2/201810/2/2018APASS
DetailsTroy Cobbley
The branchline restraints have been installed so they can be covered.


Contact Ken Orahood - ###-#### 30 Min prior to RTC Insp start please.

Thanks Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in9/25/20189/26/20189/26/2018APART
DetailsTroy Cobbley
Todays inspection was just for the hangers attachment points prior to being covered by sheetrock. What is installed appears ok but the siesmic bracing for the branchlines has not been addressed. So attachments can be covered where the rod is less than 6" from pipe to attachment point but the longer hangers can't be covered until the siesmic bracing is addressed.


Contact Ken Orahood ###-#### 20 min prior to RTC Insp start please and THANK YOU. Phone #: ###-#### Inspection requested via web by Teri Cruickshank
Plan resubmittals received  9/25/2018 DONE
DetailsTim Frost
Plan assigned to (Tim)9/25/2018 9/25/2018 DONE
DetailsTim Frost
Sprinkler Plan Check9/25/2018 9/25/2018 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  9/25/2018 DONE
DetailsTim Frost
Permit Ready to Issue  9/25/2018 DONE
all requirements met
Issue and Print Permit  9/25/2018 DONE
(F) Reprint permit  9/25/2018 DONE
(F) Reprint permit  9/25/2018 DONE
(F) Reprint permit  9/25/2018 DONE
Intake Approval  7/27/2018 PASS
Sprinkler Plan Check7/27/2018 7/27/2018 FAIL
DetailsTim Frost
Plan assigned to (Tim)7/27/2018 7/27/2018 DONE
DetailsTim Frost
1st review completed  7/27/2018 FAIL
DetailsTim Frost
Miscellaneous action  7/27/2018 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  7/25/2018 DONE
Application submitted via PDS Online on Jul 25 2018 10:08AM