INSP-Final Inspection | 1/21/2020 | 1/23/2020 | 1/23/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected. Final fire alarm inspection is complete.
We would like this inspection for 8:00 am per the tenant''s request. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
INSP-Final Inspection | 1/14/2020 | 1/21/2020 | 1/21/2020 | A | CANC |
Jim Page
|
|
|
We would like this inspection at 8:00 am per the tenant''s request. Please call Nate at ###-#### with inspection time. Phone #: ###-#### >> Inspection requested via web by Lori Brungardt Inspection cancelled from web by: Lori Brungardt
|
1st review completed | | | 1/13/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 1/13/2020 | | 1/13/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/13/2020 | | DONE |
|
|
|
As built - No Fee
|
Permit Ready to Issue | | | 1/13/2020 | | DONE |
|
|
|
as built met
|
CHANGE STATUS TO (ISS) | | | 1/13/2020 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 1/3/2020 | | 1/13/2020 | | DONE |
Lee G Meredith
|
|
|
as builts
|
Alarm Plan Check | 1/9/2020 | | 1/9/2020 | | CANC |
Joe Bruce
|
|
|
ePlan task sent back to Lori to upload corrections.
|
INSP-Final Inspection | 1/3/2020 | 1/6/2020 | 1/6/2020 | P | CANC |
Jim Page
|
|
|
We would like this inspection at 1:00 pm. This is when the elevator company will be there along with the elevator inspector. Please call Nate at ###-#### with inspection time. Phone #: ###-#### >> Inspection requested via web by Lori Brungardt Inspection cancelled from web by: Lori Brungardt
|
Fees Due Hold | 12/19/2019 | | 1/3/2020 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/3/2020 | | DONE |
|
|
|
lorie from Alarmco start as builts
|
INSP-Final Inspection | 12/12/2019 | 12/18/2019 | 12/18/2019 | A | FAIL |
Jim Page
|
|
|
Elevator pit has fire sprinkler installed, provide smoke and heat detection in for shunt and recall as discussed. Notated city approved drawings where audio visual notification was overspaced. Verified monitoring, tested basement initiating devices, tested fire sprinkler tampers and flow switch, items tested all worked as required.
We would like this inspection to be done at 9:00 am. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
Plan assigned to (Lee) | 12/10/2019 | | 12/12/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 12/12/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 12/12/2019 | | 12/12/2019 | | PASS |
Lee G Meredith
|
|
|
|
Plan Modification Accepted | | | 12/12/2019 | | DONE |
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/12/2019 | | DONE |
|
|
|
Plan mod passed. Minimum $65.00 review fee is due.
|
Permit Ready to Issue | | | 12/12/2019 | | DONE |
|
|
|
Plan Mod - Met
|
CHANGE STATUS TO (ISS) | | | 12/12/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/10/2019 | | DONE |
|
|
|
as built
|
INSP-Final Inspection | 11/19/2019 | 11/21/2019 | 11/21/2019 | P | FAIL |
Jim Page
|
|
|
Corridor spacing for smoke detection as well as audio visual notification for this project does not apply to most areas, numerous office walls shown on city approved drawings are half walls, smoke detection and audio visual notification will need to corrected, a plan mod will be required beofre next inspection. Notated city approved drawings with red ink areas where smoke detection is overspaced, a smoke detector is not installed that is city approved drawings as well as A/V notification that is overspaced, all areas of building fire alarm system were inspected. Inspection was stopped due to deficiencies noted. No initiating devices or A/V devices were tested.
We would like this inspection to be performed at 2:00 PM per the occupant''s request. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
INSP-Final Inspection | 11/7/2019 | 11/12/2019 | 11/12/2019 | P | CANC |
Jim Page
|
|
|
We would like this inspection performed after 1:30 pm per the occupant''s request. Please call Nate at ###-#### with inspection time. Phone #: ###-#### >> Inspection requested via web by Lori Brungardt Inspection cancelled from web by: Lori Brungardt
|
INSP-Final Inspection | 11/5/2019 | 11/7/2019 | 11/7/2019 | A | CANC |
Jim Page
|
|
|
We would like the inspection to be performed at 7:00 am per the request of the occupants. Please call Nate at ###-#### with inspection time. Phone #: ###-#### >> Inspection requested via web by Lori Brungardt Inspection cancelled from web by: Lori Brungardt
|
INSP-Final Inspection | 10/30/2019 | 11/1/2019 | 11/1/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Nate since I could not be there at 7:00am die to another fire alarm inspection.
We would like the inspection to be performed at 7:00 am per the request of the occupants. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
INSP-Final Inspection | 10/21/2019 | 10/23/2019 | 10/23/2019 | A | CANC |
Jim Page
|
|
|
Could not perform inspection, request was cancelled per point of contact, will be rescheduled for a later date.
Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
INSP-Final Inspection | 10/17/2019 | 10/18/2019 | 10/18/2019 | P | CANC |
Troy Cobbley
|
|
|
I'm unable to perform the inspection when the contractor was ready. The site requested that the inspection start at 2:00 pm if possible since they have several meetings during the day. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
Alarm Plan Check | 10/8/2019 | | 10/8/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/8/2019 | | DONE |
|
|
|
As built - No fee.
|
Permit Ready to Issue | | | 10/8/2019 | | DONE |
|
|
|
as built approved
|
CHANGE STATUS TO (ISS) | | | 10/8/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 10/2/2019 | | 10/3/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
1st review completed | | | 10/3/2019 | | FAIL |
|
|
|
Failed prescreen. Fl. 2 detector spacing is wrong. Returned to Lori.
|
Plan Modification Accepted | | | 10/2/2019 | | DONE |
|
|
|
as built to upload drawings request by Lori
|
INSP-Final Inspection | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | CANC |
Jim Page
|
|
|
Please call Nate at ###-#### with inspection time. Phone #: ###-#### >> Inspection requested via web by Lori Brungardt Inspection cancelled from web by: Lori Brungardt
|
Permit Ready to Issue | | | 8/29/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 8/29/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 8/28/2019 | | 8/28/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/28/2019 | | FAIL |
|
|
|
Provide shut trip power monitoring per 2016 NFPA 72 21.4.4.
|
Plan resubmittals received | | | 8/28/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 8/28/2019 | | 8/28/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/28/2019 | | DONE |
|
|
|
Passed with review comments. 8-28-19 pdf
|
Application received | | | 8/27/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 27 2019 10:58AM
|