INSP-Final | 10/15/2019 | 10/16/2019 | 10/16/2019 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled
Contact Noemi Carrero ###-#### 30 min prior to Final Insp Start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
DOC - Permit Finaled | | | 10/16/2019 | | DONE |
|
|
|
Per Troy C
|
INSP-Supply line flush | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | FAIL |
Troy Cobbley
|
|
|
Called contact and left message. Called office and spoke to person to pass on message I was on the way. Arrived and job site with the fire alarm contractor but he was unable to operate flow switch. I also noted missing sprinkler canopy on second floor. I did not continue to third floor tamper switches have not been installed on valves. Will need to check plan mods for clarification. Contact Ken Orahood ###-#### 30 min prior to Final Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Final | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | CANC |
Troy Cobbley
|
|
|
Contact ken Orahood ###-#### 30 Min Prior to Final Insp Start please.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Final | 10/14/2019 | 10/15/2019 | 10/14/2019 | P | CANC |
Troy Cobbley
|
|
|
Contact Andrew Larson ###-#### 30 min prior to Final Insp Start please.
Thank YOU, Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
Staff review | 9/6/2019 | 9/6/2019 | 9/6/2019 | | PASS |
Mark Stumbaugh
|
|
|
As Builts
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2019 | | DONE |
Mark Stumbaugh
|
|
|
As Builts - No Fee
|
Permit Ready to Issue | | | 9/6/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/6/2019 | | DONE |
|
|
|
emailed Shelley and put plans in outbox.
|
Plan assigned to (Stumbaugh) | 9/5/2019 | | 9/6/2019 | | DONE |
Mark Stumbaugh
|
|
|
As Builts
|
Miscellaneous action | | | 9/5/2019 | | DONE |
|
|
|
emailed Shelley I got the plans and started the plan mod.
|
Plan Modification Accepted | | | 9/5/2019 | | DONE |
|
|
|
This is a plan mod for lot number five only. An arm over in Calc area 1 on the fourth floor was shortened by about 13'6". Stamped and taken to plan reviewer.
|
INSP-Sprinkler Rough-in | 7/17/2019 | 7/17/2019 | 7/17/2019 | A | PASS |
Troy Cobbley
|
|
|
The 4th floor piping is ok for cover. No other items ready to be looked at from the previous inspection. I noted that plan mods have not been done yet.
Contact Andrew Larson ###-#### 30 min prior to Unit #5 RTC insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Final | 7/2/2019 | 7/3/2019 | 7/2/2019 | P | CANC |
Troy Cobbley
|
|
|
Contact Andrew Larson ###-#### 30 min prior to Final Insp start please
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Sprinkler Rough-in/Hydro | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Contact Andrew Larson ###-#### 30 min prior to OH Hydro Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | FAIL |
Jim Page
|
|
|
Tenting is still not correct on level 4, refer to diagram on city approved drawings for correct install of tenting. Exposed CPVC under stairs on level 1. Head is blocked in garage be garage door bracing, obstruction was mentioned on last inspection. Remote area on level 4 does not match city approved drawings, remote area needs to match or a plan mod needs to be completed showing changes in remote calc area.
Contact Andrew Larson ###-#### 30 min prior to RTC Insp Start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 6/20/2019 | 6/21/2019 | 6/21/2019 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Ken Orahood due to cover material not being removed, inspection will be rescheuled for a later date.
Contact Andrew Larson ###-#### 30 min prior to RTC Insp start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | CANC |
Jim Page
|
|
|
Spoke with point of contact in regards to piping being covered before cover inspection was performed. Levels 2 and 3 were approved for cover from the 08APR2019 inspection notes, level 1 had changes from the original city approved drawings that need to be inspected with mentioned drawings and the tenting on level 4 needs to be inspected, levels 1 and 4 were not approved for cover. Cover material will need to be removed for a code compliant inspection to be performed, this request is cancelled and a new inspection will need to be requested after cover material has been removed.
Contact Andrew Larson - ###-#### 30 min prior to RTC Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | CANC |
Troy Cobbley
|
|
|
Contact Andrew Larson - ###-#### 30 min prior to RTC Insp start please.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
Staff review | 4/17/2019 | 4/17/2019 | 4/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
plan mod
|
Plan assigned to (Stumbaugh) | 4/17/2019 | | 4/22/2019 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Permit Ready to Issue | | | 4/22/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/22/2019 | | DONE |
|
|
|
emailed Shelley that the plan mod was headed back her way in the innerr office mail-1 hr plan review time
|
Plan Modification Accepted | | | 4/17/2019 | | DONE |
|
|
|
plan mod accepted-received 4 sets of drawings and docs-took to MAS
|
INSP-Sprinkler Rough-in | 4/5/2019 | 4/8/2019 | 4/8/2019 | P | PART |
Jim Page
|
|
|
Levels 2 and 3 rough to cover inspection complete for overhead fire sprinkler piping, levels 2 and 3 approved for cover. Updated plans did not have city stamp, did not inspect level 1 due to pipe size changes from city approved drawings, tenting still needs to be installed on level 4.
Contact Andrew Larson ###-#### 30 min prior to RTC insp start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Troy Cobbley
|
|
|
The pendant head on the third floor has been moved and is passed. Piping can not be covered until a tenting inspection has been passed.
Contact Andrew Larson ###-#### 0 Min Prior to RTC Insp start please for Lot A5.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for the appartment that was inspected. The first and second floor piping can be covered but the third floor needs one pendant head adjusted to provide coverage and tenting approved prior to a cover approval. Andrew will reschedule a nother inspection for this afternoon to see tyhe head modified.
Contact Andrew Larson ###-#### 0 Min Prior to RTC Insp start please for Lot A5.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PART |
Troy Cobbley
|
|
|
No city approved plans/small documents on site. No inspection performed but we did talk about cover inspection procedure on the project.
|
INSP-Sprinkler Rough-in | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | CANC |
Troy Cobbley
|
|
|
Contact Andrew Larson - ###-#### 30 Min Prior to RTC Insp start please
Thank YOU, Teri Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
Sprinkler Plan Check | 9/25/2018 | | 9/25/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/25/2018 | | DONE |
|
|
|
|
Issue and Courier | | | 9/25/2018 | | DONE |
|
|
|
emailed Shelley
|
Plan resubmittals received | | | 9/19/2018 | | DONE |
|
|
|
Resubmittals recieved all app's, letter from Phoenex Fire, owners info cert, calcs, steel hanger info, sheets 1 of 3, 2 of 3, 3 of 3-took to Tim F
|
Sprinkler Plan Check | 9/11/2018 | | 9/11/2018 | | FAIL |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 9/11/2018 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/11/2018 | | 9/11/2018 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 9/11/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor failed review
|
Plan resubmittals received | | | 8/28/2018 | | DONE |
|
|
|
Resubmittals received 4 pkgs of each letter, hydraulic design pkgs, calcs & sheets FP1, 2 & 3-this set of plans is for 3544, 3552, 3560 & 3568 N Prospect Ln-per #'s NAF18-00086, 84, 83& 85-took to Adele
|
Sprinkler Plan Check | 6/27/2018 | | 6/27/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/21/2018 | | DONE |
|
|
|
emailed Shelley
|
Application received | | | 6/21/2018 | | |
|
|
|
|
Plan assigned to (Tim) | 6/21/2018 | | | | |
Tim Frost
|
|
|
|