Permit Information
Permit NumberBLD18-01027
StatusIssued
Name ST LUKES HEALTH SYSTEM LTD
Site Address 2619 W FAIRVIEW AVE
Project NameSt. Luke's - Hospital and MOB
Customer NumberBLD17-04285
ePlanReviewYes
Description
(ST. LUKE’S – 27TH STREET DEVELOPMENT – HOSPITAL AND MEDICAL OFFICE BUILDING – ENVELOPE AND TENANT IMPROVEMENT PACKAGE) (DRH17-00427) (CUP17-00057) The fire sprinkler system is used for occupancy. To complete the envelope and tenant improvement phase (Package II) for a new hospital and medical office building. This building has a total floor area of about 223,500 square feet (about 73,500 square feet 1st story, about 71,500 square feet 2nd story, about 53,500 square feet 3rd story, and about 25,000 square feet 4th story). The hospital portion (about 121,000 square feet total) is 3 stories tall with a penthouse and the medical office portion (about 102,500 square feet total) is 4 stories tall with a penthouse. The concrete and structural steel phase was done under permit BLD17-04285. Work is to include insulated metal stud exterior walls (masonry veneer, metal composite wall panels, metal wall panels, EIFS, etc.), exterior windows, exterior doors, roof insulation installed on top of the steel roof deck, membrane roof coverings, steel roofing, interior nonbearing walls, interior doors, interior windows, several multi-user toilet rooms accessible to the disabled, several single-user toilet rooms accessible to the disabled, 30 hospital sleeping rooms accessible to the disabled (except for toilets in bariatric toilet rooms), hospital operating rooms, storage rooms, exam rooms, 2-hr fire barrier walls to function as occupancy separations and to also comply as smoke barriers between the hospital and medical office (also required to function as a horizontal exit on the 2nd story so that the maximum travel distance will not exceed 200 feet long), 2-hr fire barrier walls to create 4 stairway enclosures, an open stairway between the 1st and 2nd stories within the B Occupancy, 1-hr smoke barrier walls within the hospital to create smoke compartments, 1-hr fire barrier walls to create incidental use separations within the hospital, smoke partitions to create hospital care suites, smoke partitions to create I-2 rated corridors within the hospital, three elevators to serve 4 stories (one of the elevators extends to the roof), three elevators within the hospital to serve 3 stories, a mechanical penthouse above the hospital portion, a mechanical penthouse above the medical office portion, a full service kitchen within the hospital portion on the 1st story (Type I grease hood and duct system, Type II dishwasher hood and duct system, walk-in cooler, walk-in freezer, etc.), a dining area on the 1st story of the hospital, structural support for medical equipment (MRI, CT, X-ray, patient lifts, exam lights, etc.), structural support for folding partitions and air plenums, suspended acoustical ceilings, suspended gypsum board ceilings, millwork, and finishes. Three exterior canopies, a fenced rehab yard, and a fenced utility yard (generator, transformers, cooling tower, trash compactors, etc.) will also be constructed under this permit. Special Inspection is required for concrete, masonry, steel (including welding and bolting), fire-resistance coatings, fire stopping, and anchors post-installed in hardened concrete. This permit is intended to establish a Certificate of Occupancy for the entire building. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72, including the smoke detection system, as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in6/24/20208/5/20208/5/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in6/24/20207/29/20207/29/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in6/24/20207/22/20207/22/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in6/24/20207/15/20207/15/2020ACANC
DetailsMike Jordan
BLD-Conference7/15/20207/15/20207/15/2020ADONE
DetailsMike Jordan
On site to meet new general contractor.
BLD-Framing/Rough-in6/24/20207/8/20207/8/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in6/24/20207/1/20207/1/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in5/27/20206/24/20206/24/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in5/27/20206/17/20206/17/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in5/27/20206/10/20206/10/2020ADONE
DetailsMike Jordan
Walk through on work in progress on MOB side of building.
BLD-Framing/Rough-in5/27/20206/3/20206/3/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in4/29/20205/27/20205/27/2020APEND
DetailsMike Jordan
1st. floor walk thru only on MOB side. Work is in progress.
BLD-Framing/Rough-in4/29/20205/20/20205/20/2020ADONE
DetailsMike Jordan
Reviewed submittal for T ratings from YMC. Awaiting approval from architect.
BLD-Framing/Rough-in4/29/20205/13/20205/13/2020APASS
DetailsMike Jordan
3rd level MOB interior steel stud framed walls at hand therapy room ok to cover only.
BLD-Framing/Rough-in4/29/20205/6/20205/7/2020ACANC
DetailsDave Hannah
BLD-Framing/Rough-in4/9/20204/29/20204/29/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in4/9/20204/22/20204/22/2020APASS
DetailsMike Jordan
3rd. floor line set through pentrations have been repaired and ok to cover. observed in progress work on 3rd and 4th floors, MOB side.
BLD-Framing/Rough-in4/9/20204/15/20204/15/2020ACANC
DetailsMike Jordan
BLD-Framing/Rough-in4/3/20204/3/20204/3/2020AFAIL
DetailsMike Jordan
Through penetrations for line sets on level 3 and 4 MOB area is not installed per the supplied UL listing.
BLD-Framing/Rough-in4/2/20204/2/20204/3/2020ACANC
DetailsMike Jordan
BLD-Conference3/6/20204/1/20204/1/2020ADONE
DetailsMike Jordan
Level 3 MOB side. Noted that linesets have been firecaulked. No listing from sub contractor has been provided. Linesets to remain uncovered until listing has been provided and completed work is approved.
BLD-Conference3/6/20203/25/20203/25/2020ADONE
DetailsMike Jordan
BLD-Framing/Rough-in3/25/20203/25/20203/25/2020APART
DetailsMike Jordan
One siding in progressing on level 3 MOB framing. Still needs to firestop and provide UL listing for line sets in RM.3W235 and noted the plumbing pipes in Rm 3W228 not firestopped yet, will require a T rating.
BLD-Other3/20/20203/23/20203/23/2020APASS
DetailsMike Jordan
through floor and monicot.. level 3 // Rocky Phone #: ###-####. 3rd. level MOB interior steel stud framed walls and rated floor penetrations. grids 4W to 11W. See plans for marked locatons.
BLD-Conference3/6/20203/18/20203/18/2020ADONE
DetailsMike Jordan
BLD-Wall cover3/11/20203/12/20203/12/2020APASS
DetailsMike Jordan
Ken Phone #: ###-####. Issues resolved on level 2 MOB side, grids 3W to 8W. All fire proofing patch backs ok. Ok to cover. Plumbing penetrations to be firestopped from underneath.
BLD-Conference3/6/20203/11/20203/11/2020ANR
DetailsMike Jordan
Walk through to visualy inspect MOB level 2 areas for patch backs on fireproofing and fire rated penetrations. Will reinspect tomorrow.
BLD-Conference3/5/20203/6/20203/6/2020AFAIL
DetailsMike Jordan
Ken Phone #: ###-####. Level 2 framing from grid 8W going west has been covered. Contractor to remove sheetrock around columns and at 10 random locations were there are floor penetrations to ensure firestopping has been completed.
BLD-Wall cover2/12/20202/14/20202/14/2020APASS
DetailsMike Jordan
Ken Phone #: ###-####. Interior steel stud non rated walls at level 2 MOB at grids 8W.5 to 10W.5 and grids B.6 to grids D.8. Also grids B.5 to B.4 and grids 7W to 10W.5. Noted that non combustible plumbing pie to be fire stop from underneath due to pipe clamp interfierance. Also noted select areas were fire proofing on columns will need to be hand patched, these ares will be left uncovered for reinspection.
BLD-Conference2/4/20202/5/20202/5/2020ADONE
DetailsMike Jordan
Ken Phone #: ###-####. Walk through on 1st and 2nd. floors.
BLD-Wall cover1/23/20201/24/20201/24/2020ACANC
DetailsMike Jordan
Ken Phone #: ###-####
BLD-Other1/24/20201/24/20201/24/2020PDONE
DetailsMike Jordan
3rd floor MOB walk through.
BLD-Framing/Rough-in1/13/20201/13/20201/14/2020PDONE
DetailsDave Hannah
Ken Phone #: ###-####
BLD-Framing/Rough-in1/6/20201/7/20201/13/2020PPEND
DetailsDave Hannah
Ken Phone #: ###-####
BLD-Framing/Rough-in1/8/20201/8/20201/13/2020PPEND
DetailsDave Hannah
Ken Phone #: ###-####
BLD-Framing/Rough-in1/2/20201/2/20201/7/2020PPEND
DetailsDave Hannah
BLD-Framing/Rough-in11/21/201911/22/201911/22/2019APASS
DetailsMike Jordan
Ken Phone #: ###-####. Interior steel stud framed walls, 1hr. fire barrier walls, 1hr. smoke barrier walls and smoke partitions at level 2 area D at grids 9E to 12E and grids FF to JJ. Also 1hr. smoke barrier corridor wall grid 7E to 12E, south side.
BLD-Other8/22/20198/23/20198/23/2019APART
DetailsDave Hannah
fire culking // tim Phone #: ###-####
BLD-Other8/23/20198/23/20198/23/2019PCANC
DetailsDave Hannah
fire culking // tim Phone #: ###-####
BLD-Framing/Rough-in8/8/20198/8/20198/8/2019PPART
DetailsDave Hannah
ken Phone #: ###-#### walked project with super and framing contractor looked at both int and ext walls all looking good they will add some more shots to bottom track on ext and get me some details for int track
BLD-Conference4/1/20204/8/2020 A 
DetailsMike Jordan