BLD-Final | 12/10/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Jason - ###-####
|
FIRE-Conference | 12/6/2019 | 12/6/2019 | 12/6/2019 | P | DONE |
Troy Cobbley
|
|
|
Jason and I went over life safety requirements for the remaining phase of work for this project. Need verification that exit discharge lights will not be required out of the two remaining marked exits.
|
BLD-Ceiling Grid Inspection | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Brandon Shaw
|
|
|
Final phase...
|
BLD-Final | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | PART |
Mike Jordan
|
|
|
CAMERON Phone #: ###-####. ,Phase 2 ok to occupy.
|
BLD-Final | 8/14/2019 | 8/16/2019 | 8/16/2019 | P | CANC |
Mike Jordan
|
|
|
Cameron Phone #: ###-####
|
FIRE-Final Inspection | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | FAIL |
Troy Cobbley
|
|
|
This life safety inspection was for Phase 2. The phase 2 fire sprinkler and fire alarm work needs to be completed. I noted exit signs missing and one area that needs the exit sign repaired and emergency lighting provided.. Also Jason agreed that an old aluminum door with a deadbolt will be removed.
Jason Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/2/2019 | 7/3/2019 | 7/3/2019 | P | PART |
Mike Jordan
|
|
|
Cameron Phone #: ###-####-please call prior to meet. Ceiling grid in phase 2 ok pending MEP's rough in inspections.
|
BLD-Framing/Rough-in | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Interior steel stud framed walls only for phase 2 ok.
|
BLD-Framing/Rough-in | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | NR |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Needs plumbing and electrical rough in inspections first.
|
BLD-Final | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | PART |
Mike Jordan
|
|
|
jason Phone #: ###-####. Ok to occupy phase 1.
|
FIRE-Final Inspection | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | PART |
Troy Cobbley
|
|
|
Life safety passed for the phase 1 area of work.
jason Phone #: ###-####
|
BLD-Final | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | NR |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
FIRE-Final Inspection | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | FAIL |
Troy Cobbley
|
|
|
Need panic hardware as shown on the approved drawings, need occupant load signs, need addtional emergency lights/exit discharge lights as discussed.
Jason Phone #: ###-####
|
FIRE-Conference | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | DONE |
Troy Cobbley
|
|
|
Jason and I spoke about fire sprinkler and fire alarm isuues that need addressed prior to a phase 1 approval.
|
BLD-Ceiling Grid Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PART |
Mike Jordan
|
|
|
jason Phone #: ###-####..Ceiling grid for phase 1 ok pending MEP's.
|
BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Hardlids and soffits for phase 1 area A. Pending fire sprinkler rough in inspection.
|
BLD-Framing/Rough-in | 12/17/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####. INterior stel stud framed walls for phase 1. Grids 3 to 8.
|