1301 S. Bird St. Boise, Id 83709. ESC: Stabilized construction entrance on south bird st. concrete washout near south bird, Silt fence along North and West perimeter of project, Rock check dam on the West side of site to protect erosion after irrigation season, barrow ditch on east side of roadway along bird, DI protection. SWPPP/narrative provided. RP TBD
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/1/201810/1/201810/1/2018 CANC
DetailsMichael Zawacki
DOC - Permit Finaled10/1/201810/1/201810/1/2018PPASS
DetailsMichael Zawacki
All landscaping complete, storage removed from north side of property.
General Inspection8/14/20188/14/20188/14/2018PPASS
DetailsAndy J. Long
Apartments are complete, common areas landscaped, and many are occupied.

Permit is open for removal of temporary BMPs on west side of Bird Street and project construction signage. DI bags can stay until Humane Society project is active.
General Inspection7/9/20187/9/20187/9/2018PPASS
DetailsMichael Zawacki
Landscapers on site finishing area. Few small disturbed areas in courtyard remain. Some dirt in parking lot from landscape activity. Site is free from trash. Bird St still has inlet protection. Lot on south of projects still has stockpiles.
Site Final5/29/20185/30/20185/30/2018ANR
DetailsAndy J. Long
Landscape crews finishing up placing rock and planting. Some units are already occupied. Many are having appliances delivered.

Storm drain sediment protection is installed on Bird and within site. No trackout, loose trash issues, or other violations observed. Notified RP-GC Dave to schedule site final once all is complete and storm drain sediment bags removed and Bird Street and interior are swept clean.

Site Final5/30/20185/30/20185/30/2018ACANC
DetailsAndy J. Long
Random Inspection5/7/20185/7/20185/7/2018PPASS
DetailsMichael Zawacki
WIP on landscaping and finish work of interiors. First half will have move ins beginning 5-11.
Talked to RP on site, only ESC issues is to have landscapers clean sidewalk when work in area completed and clean debris from top and around inlets on north end of Bird St.
General Inspection4/26/20184/26/20184/26/2018PPASS
DetailsMichael Zawacki
Landscapers on site doing sprinklers and sod & rocks. Lots of dust on site and also along area where cars are parked on Bird. Road will need to be swept when no vehicles on site.
General Inspection3/26/20183/28/20183/30/2018PPART
DetailsAndy J. Long
Site condiitions have not gotten worse.

WIP on pouring sidewalks. Still significant amout of loose dirt and dirt piles on perimeter of Bird STreet. All DIs have sediment bags installed.

Correction request:
- pick up trash next to ESC permit sign board
- sweep north end of Bird STreet and push dirt back towards site. Clean around sediment bags in storm drain.
Site Preparation3/26/20183/26/20183/26/2018PPEND
DetailsAndy J. Long
Dave Phone #: ###-####

Corrections still in progress:
- Re-inspection fee has been paid; parcel hold for inspections lifted.
-Loose trash has been thoroughly picked up. Pointed out some areas that need additional pick up this week (south east corner of site, open field across Bird Street has some wind blown trash)
- WIP on removing stockpiles.

- Sidewalk along Bird still needs cleaning and removal of mud off top of gutter curbing.

RP stated road is to be swept daily this. Follow up inspection scheduled.
General Inspection3/20/20183/20/20183/23/2018PPEND
DetailsAndy J. Long
WIP on corrections. RP/GC to pay re-inspection fee and schedule compliance inspection Monday AM.
Stop Work Order3/20/20183/20/20183/20/2018PDONE
DetailsAndy J. Long
Parcel hold/Stop Work Order for all City Inspection requests at Cimarron Apartments until site can show compliance with ESC permit conditions
Violations include:
.

- trackout to Bird and all along sidewalk and gutter
- inside of site extremely dirty
- need to remove all stockpiles off hard surfaces, store in area with perimeter sediement control


- pick up all loose trash, cover trash containers when not in use
General Inspection3/20/20183/20/20183/20/2018PFAIL
DetailsMike Jordan
Needs to sweep all silts from hard surfaces. Appeares no maintenace has been taken place. Noted excessive trackout. All Either no BMP's in place, or the ones in place are in non functioning state.
General Inspection3/19/20183/19/20183/19/2018PFAIL
DetailsMichael Zawacki
Excessive trackout and dirt in gutters on Bird St. Road inside site is covered in dirt. Trash containers are full, two front end loaders were cleaning garbage pile on ground during inspection. Washout is full. Granite is on site hauling away back fill.
General Inspection3/6/20183/6/20183/6/2018PFAIL
DetailsMichael Zawacki
Lots of dirt and trackout onto Bird street, also talked to Petra across street about it. Dumpsters on site but lots of trash laying on site, saw one worker throw away garbage. Bird street needs to be cleaned, lots of dust being kicked up as vehicles drive through. Curbing is being installed on site.
General Inspection2/9/20182/16/20182/16/2018APEND
DetailsMichael Zawacki
Spoke with owner on site. Curb should be going in within a few days. Site is cleaner than it has been. Workers all parked on Bird. Sweepers scheduled for end of day. Trash pickup also scheduled for today.
BMP Violation2/7/20182/8/20182/9/2018PPEND
DetailsAndy J. Long
Some corrections completed:

- DI bags that were full on Bird were maintained and reinstalled.
- Dirt and gravel was cleaned out of gutters on south section of Bird along the project. Will work on north section next week.
- Perimeter trash picked up, piles outside units mostly picked up. Still alot of trash to gathered, but condition is much improved, especially along perimeter.

Site still on warning to conduct daily housekeeping.
BMP Violation2/5/20182/6/20182/7/2018PCANC
DetailsAndy J. Long
BMP Violation2/7/20182/7/20182/7/2018PFAIL
DetailsAndy J. Long
Multiple violations at site:

- 1-3 inches of loose dirt in the gutter has not been swept
- several DI bags over 75% full need to be changed.
- loose trash, smash wall board, washouts all around site

Immediate correctcions needed:
- scoop and sweep dirt out of gutter on entire site
- relocate sweeper machine to site
- have crews pick up trash around work areas
- Summit needs to dedicate man hours every week to trash pick up around the perimter.

Verbal correction issued to Rhett with Granite (permit holder) and VM left with owner Dave with Summit.

24 hour followup scheduled.
Random Inspection2/5/20182/5/20182/5/2018PFAIL
DetailsAndy J. Long
Lots of dirt on sidewalk, gutter, and west side of Bird. Stockpiles stored throughout site with no perimeter controls leading to increased trackou.

Site needs to do thorough sweeping of Bird this week.
General Inspection1/25/20181/25/20181/26/2018PPEND
DetailsAndy J. Long
Inspected by MPZ 1/25 PM

Interior site is still muddy. Wet conditions prohibiting full removal. Backfill stockpiles being temporarily stored on project next door. Will continue to monitor progress and regular sweeping of Bird Street.

Site still needs further corrections for compliance.
General Inspection1/17/20181/18/20181/19/2018PFAIL
DetailsAndy J. Long
Inspection conducted Thursday 1/18 AM found continued non-compliance with ESC ordinance:

- trackout to Bird Street
- mud on sidewalks and gutters
- uncontained trash piles and losse litter around site

Notice of Violation pending

Note: Some DI bags on Bird were changed out last week.
General Inspection1/2/20181/11/20181/11/2018PFAIL
DetailsAndy J. Long
corrections not complete

- trash uncontained in many areas
- muddy water all over interior parking lot due to multiple stockpiles and stagings areas not having perimeter control. Need to haul off dirt not being used.
- lots of mud in gutter and sidewalk along Bird


Corrections:
- pick up trash along the west perimeter of site, in particular the NW corner
- make plan to consolidate stockpiles or designate a material staging and dropoff area
- provide board walks for workers who park on Bird
- clean out all DI bags on Bird once water drains

Note, no trackout or discharges to Overland or Hackamore

Working with Dave with Summit and Rhett with Granite on improving site
BMP Violation1/9/20181/11/20181/11/2018AFAIL
DetailsAndy J. Long
corrections not complete

- trash uncontained in many areas
- muddy water all over interior parking lot due to multiple stockpiles and stagings areas not having perimeter control. Need to haul off dirt not being used.
- lots of mud in gutter and sidewalk along Bird


Corrections:
- pick up trash along the west perimeter of site, in particular the NW corner
- make plan to consolidate stockpiles or designate a material staging and dropoff area
- provide board walks for workers who park on Bird
- clean out all DI bags on Bird once water drains

Note, no trackout or discharges to Overland or Hackamore

Working with Dave with Summit and Rhett with Granite on improving site
BMP Violation1/8/20181/9/20181/9/2018PPEND
DetailsAndy J. Long
Summit Development and Granite working on corrections issued 1/8. Follow up to check on trash and road cleaning for 1/11 AM
BMP Violation1/8/20181/8/20181/8/2018PFAIL
DetailsAndy J. Long
Numerous violations at Cimarron:

- mud and dirt stockpiles placed throughout site, creating lots of mud within apartments and trackout to Bird.
- DIs on west side of Bird need maintenance
- gutter and sidewalk on Bird needs sweeping and cleaning
-pick up loose trash in plywood piles and put in the two large site dumpster

Rhett with Granite will start working on corrections, says Granite is still managing ESC and site work for the project. Correction notice also given to developer Dave Skaggs.
General Inspection1/2/20181/2/20181/2/2018 PASS
DetailsAndy J. Long
WIP on framing apartment 4-plexes. Bird Street is now paved between Hackamore and Overland, some sections of sidewalk along east side of street are in progress. No trackout or discharges to Bird. Will follow up next week during above freezing temperature.
General Inspection11/14/201711/14/201711/14/2017PPEND
DetailsMichael Zawacki
Cimaron Apartments.
Shares parking lot with adjacent project. Will need to help clean trackout. Concrete washout is full and on verge of over flowing.
General Inspection10/16/201710/16/201710/16/2017PPASS
DetailsMichael Zawacki
Large site with other big projects adjacent. Entire area is being prepped for curb and gutter, roads also look ready to be laid out. Entire area has been watered and free from fugitive dust. Dirt is not on neighboring properties. Free of trash and trackout.
Complaint Inspection8/10/20178/10/20178/14/2017PPEND
DetailsAndy J. Long
No construction activity at site. No windblown dust observed.

Site needs to begin implementing temporary or permanent stabilization on disturbed area.
General Inspection8/2/20178/4/20178/4/2017APEND
DetailsAndy J. Long
No activitiy at site. RP on permit is no longer onsite per Granite Excavation.

Notified developer that site appears to not have a CGP 2017 NOI in "active" status.
General Inspection6/27/20176/28/20176/28/2017APASS
DetailsAndy J. Long
No activity at site. Water truck on site for dust control. No dust complaints received. City of Boise ESC Permit sign posted. No trackout or discharges.

No eNOI for CGP 2017 listed or found. Will notify Granite construction.

General Inspection6/21/20176/23/20176/27/2017ACANC
DetailsAndy J. Long
need to post ESC sign and check for SWPPP onsite.

rescheduled for 6/28 AM
Site Preparation6/21/20176/21/20176/21/2017PPART
DetailsAndy J. Long
WIP.

No site preparation inspection requested by contractor. No ESC permit sign or SWPPP info on site.

Silt fence perimeter is installed and construcction entrance at the north access point. RP Jerry is on site and water truck is in service to control dust during the grubbing & grading.

Note:
- seperate contractor working on Suez waterline under future section of Bird Street.

Will follow up Friday 6/23 to post sign. No trackout or dust plumes leaving site at time of inspeciton.