Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberESC17-00111
StatusFinaled
Name SCOTT NORIYUKI
Site Address 6263 N BOGART LN
Project NameColson Place Subdivision
Customer Number 
ePlanReviewNo
Description
SWPPP with narrative and site map provided. Site preparation inspection required. Construction entrance should not installed where utilities will need to be trenched. Protect MS4 on Bogart and any new storm drainaige feature installed on site. Silt fence to be installed on north edge of site to protect irrigation ditch.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final1/17/20191/17/20191/17/2019PPASS
DetailsAndy J. Long
All units and landcaping at Colson Place are complete. Temporary sediment controls in storm drains onsite and MS4 on Bogart have been removed. No disturbed area or loose stockpiles. Some minor interior work on going. Parking lot is clean and free of sediment and debris.

ESC permit finaled.
General Inspection12/12/201812/12/201812/12/2018PPASS
DetailsMichael Zawacki
Site is clean and landscaped. Carports will not be installed until mid January.
General Inspection11/13/201811/16/201811/19/2018PPASS
DetailsAndy J. Long
check to see if SFHs on Pocono are ready for final. Note: the carports will be covered under this permit.

WIP on interior. Need to finish the final cleaning of the parking lot and permeable pavers.
General Inspection11/14/201811/14/201811/14/2018PPASS
DetailsMichael Zawacki
Carports not built yet. Most units are all completed, still need address numbers. No ESC issues.
General Inspection10/19/201810/19/201810/19/2018PPASS
DetailsAndy J. Long
No trackout or discharges. Parking lot paved and permeable paver system installed. Landscaping in progress.
General Inspection9/18/20189/18/20189/19/2018 PASS
DetailsMichael Zawacki
Site clean, all trash in boxes. Still needs to be landscaped.
General Inspection8/3/20188/3/20188/3/2018 PASS
DetailsMichael Zawacki
Site is cleaner than it has been, trash in boxes, no dirt leaving site.
General Inspection6/18/20186/18/20186/18/2018 FAIL
DetailsMichael Zawacki
Site needs trash pickup, garbage is everywhere.
General Inspection5/1/20185/1/20185/1/2018PFAIL
DetailsMichael Zawacki
Entire site is a mess and needs to be cleaned. Lots of scraps of lumber and drywall laying around, trash boxes are filled. Loose dirt all over site parking area and sidewalks. SOme plastic bags on ground in northwest corner.
Lumber is being store on drivw and is ok.
Random Inspection3/22/20183/22/20183/22/2018PPART
DetailsMichael Zawacki
No dirt or trackout leaving site.
Lots of dirt on pavement around site. Plywood and building materials stacked around site.
General Inspection3/1/20183/1/20183/1/2018PPASS
DetailsAndy J. Long
Interior of site is paved, permeable pavers already installed for drainage. No loose dirt or stockpiles on pavement. Trash contained. DIs on Bogart have sediment protection. SWPPP posted.
General Inspection2/22/20182/26/20182/26/2018PPASS
DetailsAndy J. Long
No trackout to Bogart, no discharges offsite observed. No corrections requested
General Inspection2/21/20182/21/20182/22/2018 CANC
DetailsAndy J. Long
rescheduled
General Inspection1/5/20181/5/20181/5/2018PPASS
DetailsMichael Zawacki
Talked to Gary on site. Site is self contained. Washout is across the street, has permission to use one at apartments being built. Crushed concrete to make an entrance. Will keep sweeper on call to clean trackout when needed. Doesn't plan to work if rainy and muddy out.
Tracking Control11/20/201711/20/201711/20/2017PPASS
DetailsMichael Zawacki
No dewatering going on. In process of installing CMP & precast into ditch.
Random Inspection11/16/201711/16/201711/16/2017PFAIL
DetailsMichael Zawacki
Small dewatering operation in progress. Tested 85.9 NTU below settling pond, 12.0 NTU above operation. Called SWPPP designer to see if they knew of dewatering. No dewatering plan on site.
General Inspection10/19/201710/19/201710/19/2017APASS
DetailsMichael Zawacki
WIP on sidewalks, concrete washouts in use. Talke to RP, said they will pave soon and Syman is doing inspections, verified completed inspection in SWPPP. Perimeter control intact along canal and no sign of dust.
General Inspection8/23/20178/28/20178/31/2017ACANC
DetailsAndy J. Long
General Inspection8/23/20178/23/20178/23/2017PPASS
DetailsAndy J. Long
Working in ROW to connect to utilities. No discharges or fugitive dust observed.

General Inspection6/2/20176/2/20176/2/2017PPASS
DetailsMelissa Jannusch
Dewatering is ongoing. The dewatering operation is set up to plan and appears somewhat effective. The check dam is nearly getting overtopped. If the check dam gets overtopped, make sure to add more washed rocked.