Site Final | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Andy J. Long
|
|
|
Home is now landscaped. No ESC corrections.
|
General Inspection | 6/12/2018 | 6/12/2018 | 6/12/2018 | | PASS |
Michael Zawacki
|
|
|
Still no landscaping, nothing leavin site.
|
General Inspection | 5/28/2018 | 5/28/2018 | 5/29/2018 | | PASS |
Andy J. Long
|
|
|
Home complete and occupied. Bond issued for site revegetation, no landscaping completed yet.
No sediment runoff or erosion onsite in front yard observed.
|
General Inspection | 5/11/2018 | 5/11/2018 | 5/11/2018 | | PASS |
Michael Zawacki
|
|
|
External home construction looks complete. Yard still needs landscaping.
|
General Inspection | 4/26/2018 | 4/26/2018 | 4/27/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/11/2018 | 4/11/2018 | 4/11/2018 | | PASS |
Michael Zawacki
|
|
|
Exterior work mostly completed, still some work on back of home. Lot is contained, no runoff.
|
General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 | | PASS |
Andy J. Long
|
|
|
No trackout, no sediment runoff from site. Site is clean.
|
General Inspection | 3/12/2018 | 3/12/2018 | 3/12/2018 | | PASS |
Michael Zawacki
|
|
|
Owner on site cleaning up front yard. No dirt on street. Lot still needs landscaping.
|
General Inspection | 2/23/2018 | 2/23/2018 | 2/26/2018 | | PASS |
Michael Zawacki
|
|
|
No workers on site at time of inspection. No issues, working on framing.
|
General Inspection | 2/8/2018 | 2/8/2018 | 2/8/2018 | | FAIL |
Michael Zawacki
|
|
|
Stucco mixer cleaned and dumped in front lawn. Painting or stucco tools cleaned in backyard.
|
General Inspection | 1/24/2018 | 1/24/2018 | 1/24/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. House is wrapped and takes up entire lot. No way to get around, scaffolding is blocking side.
|
General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. House wrapped in poly. No dirt leaving site.
|
General Inspection | 12/25/2017 | 12/25/2017 | 12/26/2017 | | PASS |
Michael Zawacki
|
|
|
House takes up majority of yard. No waste out front. Unable to check rear, house wrapped in plastic ans scaffolding on side.
|
Random Inspection | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/8/2017 | 12/8/2017 | 12/8/2017 | | PASS |
Michael Zawacki
|
|
|
Not much exposed area. House is majority of lot.
|
General Inspection | 11/22/2017 | 11/22/2017 | 11/22/2017 | | PASS |
Michael Zawacki
|
|
|
All work currently inside of house. Yard is torn up but secure on lot.
|
General Inspection | 11/7/2017 | 11/7/2017 | 11/7/2017 | | PASS |
Michael Zawacki
|
|
|
|
Random Inspection | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | CANC |
Michael Zawacki
|
|
|
clean
|
Site Preparation | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | CANC |
Michael Zawacki
|
|
|
|
BMP Violation | 9/13/2017 | 9/14/2017 | 9/19/2017 | A | PASS |
Andy J. Long
|
|
|
Oil spill on street has had spill clean up absorbent and sweeping performent. No muddy runoff or trackout. No new corrections.
|
BMP Violation | 9/6/2017 | 9/6/2017 | 9/13/2017 | P | PEND |
Andy J. Long
|
|
|
RP stated crew returned to clean up spill. Investigation/follow up on-going
|
BMP Violation | 9/6/2017 | 9/6/2017 | 9/6/2017 | A | FAIL |
Andy J. Long
|
|
|
Uncontained concrete washout conducted at site.
Oil spill left on roadway with no spill control measures implemented.
Verbal request for immediate cleanup.
|
General Inspection | 6/19/2017 | 6/19/2017 | 6/19/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP no corrections.
|
General Inspection | 5/17/2017 | 5/17/2017 | 5/17/2017 | A | PASS |
Andy J. Long
|
|
|
Excavation is complete. No trackout or sediment runoff observed, wattle re-installed at edge of pavement. Permit posted on power pole. No corrections.
|