Information based on query as of Tuesday, May 7, 2024.
Permit Information
Permit NumberESC18-00358
StatusFinaled
Name NICK BULLEN
Site Address 2800 S MAPLE GROVE RD
Project NameMaple Grove Elem Addition
Customer Number 
ePlanReviewNo
Description
Project consists of adding onto an existing public elementary school. The addition includes a gymnasium and support spaces, 5 new classrooms, minor site upgrades, and minor utility work.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/18/201911/4/201911/6/2019PPASS
DetailsMichael Zawacki
General Inspection11/1/201911/1/201911/6/2019PCANC
DetailsMichael Zawacki
General Inspection10/18/201910/18/201910/18/2019 CANC
DetailsAndy J. Long
General Inspection9/16/20199/16/20199/17/2019 CANC
DetailsAndy J. Long
General Inspection8/15/20198/15/20198/16/2019 PASS
DetailsAndy J. Long
WIP. No trackout from site. Will need to clean up parking lot before ESC site final
General Inspection7/15/20197/15/20197/15/2019 PASS
DetailsMichael Zawacki
Site still needs landscaping. Rear is being prepped for paving, forms being placed for ped ramps.
General Inspection6/7/20196/13/20196/13/2019PPASS
DetailsMichael Zawacki
Building exterior and playground completed. Crew starting to clean extra fill around building. Nothing leaving site, kind of dirty. Only contractors on site are electrical.
General Inspection6/7/20196/7/20196/7/2019 CANC
DetailsAndy J. Long
General Inspection5/6/20195/6/20195/8/2019 PASS
DetailsMichael Zawacki
Building exteriors completed. Area is still bare. Some dirt in rear lot by building, none leaving or tracking out.
General Inspection4/5/20194/5/20194/8/2019 PART
DetailsMichael Zawacki
Lots of mud in parking lot that has been closed to public and being used for workers, no trackout leaving site. Dumpster on site, some wind blown trash. Roof drains go onto bare dirt. Inlet in lot has witches hat.
General Inspection3/5/20193/5/20193/5/2019 PART
DetailsMichael Zawacki
Lots of mud in contractor parking lot from genie lift. No dirt is leaving site.
General Inspection1/29/20191/29/20191/29/2019 PASS
DetailsMichael Zawacki
Site is clean and contained. Some dirt in parking lot, none going past the work site that is blocked.
General Inspection12/12/201812/12/201812/14/2018 PART
DetailsMichael Zawacki
Met with foreman on site.
Suez & Titanium trenched and ran new water line around perimeter, have swept but needs another pass.
Concrete washout nearly full, done with pours until sidewalks in March.
Some mud in parking area, will have it cleaned when crews return on Monday.