Permit Information
Permit NumberESC18-00392
StatusFinaled
Name STEVE BRUNEEL
Site Address 3511 E VIA ESTANCIA LN
Project NameBaxley Residence
Customer Number 
ePlanReviewNo
Description
Single Family home w/basement. 3290sqft living; Garage 1048
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection5/13/20195/13/20195/13/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled5/13/20195/13/20195/13/2019PPASS
DetailsMichael Zawacki
General Inspection4/26/20194/26/20194/26/2019 PEND
DetailsAndy J. Long
General Inspection4/11/20194/11/20194/12/2019 CANC
DetailsAndy J. Long
home occupied. revegetation phase
General Inspection3/26/20193/27/20193/28/2019APASS
DetailsAndy J. Long
follow up on landscapers...

Trackout cleaned up as requested. No new new issues. Approved.
General Inspection3/20/20193/20/20193/20/2019 PART
DetailsAndy J. Long
WIP on pool and landscaping. Front yard and driveway complete. Home is now occupied.

Corrections:

- pool shotcrete washout is not allowed to be dumped, potential that this site dumped on another site. Investigation in progress.

- rake out and compact area of erosion in the subdivsion flood drainage channel.
General Inspection3/5/20193/5/20193/5/2019 PASS
DetailsMichael Zawacki
Needs final stabalization.
General Inspection2/14/20192/14/20192/15/2019 PASS
DetailsMichael Zawacki
Home complete and sold. Backyard and pool not yet finished.
General Inspection1/29/20191/29/20192/6/2019 PASS
DetailsMichael Zawacki
Home completed, backyard still needs to be landscaped.
General Inspection12/20/201812/20/201812/20/2018 FAIL
DetailsMichael Zawacki
Lots of loose trash and wind blow trash starting to leave lot. Sent message to RP.
General Inspection11/6/201811/6/201811/6/2018PPASS
DetailsMichael Zawacki
WIP, perimeter BMPs in place. Permit displayed on board out front. Site is clean.
General Inspection10/10/201810/16/201810/17/2018APASS
DetailsAndy J. Long
follow up inspection on correction requests.

Corrections requested completed. Perimter wattles installed. Run on diversion berm installed to prevent extra runoff from disturbed site. RP-GC onsite.

No new corrections requested.
Conference10/10/201810/10/201810/10/2018ADONE
DetailsAndy J. Long
10 AM site inspection and conference with GC and homeowner.

Correction requests:
- clean up washout. provide new washout for any further concrete or rinsing required.
- install perimeter sediment control wattles on the west side of home and have J- hooks. Reviewed installation guidelines.
- install earthen berm diversion to prevent run on to lot from upper lot that has been disturbed.
- prevent trackout
- maintain DI bags once water has drained through

Follow inspection on Tuesday 10/16

Follow up scheduled

General Inspection10/9/201810/9/201810/9/2018PFAIL
DetailsAndy J. Long
Site is not compliance.

- No concerete washout on site, concrete washout on open area of lot
- No perimeter sediment controls.
- No ESC permit sign posted.
- Consruction entrance needs maintenence, some minor trackout occuring, any vehicel entering site will cause trackout
General Inspection9/21/20189/21/20189/21/2018PPASS
DetailsMichael Zawacki
Two homes being done under same inspection.
All foundation work complete, concrete washout on site and clean. Homes are being framed, sites are clean. Excavator on site, loading into dump truck, some dirt on sidewalk. Rock channels along perimeter need better protection.
General Inspection7/30/20187/30/20187/30/2018PPASS
DetailsMichael Zawacki
Two homes being built next to eachother. Each lot has construction entrance, workers are parked on street. Water truck on site. Piece of gator guard not trenched in protectiong drainage on sout side. Large dirt stockpile close to drainage, only a small natural buffer.
Sites are clean and free from trash. No fugitive dust.
General Inspection6/25/20186/28/20186/28/2018APASS
DetailsMichael Zawacki
Two neighboring lots. Still large piles of backfill. Perimeter controls are old and will need repair. Some dirt goes right onto slope drainage channel. Pump truck onsite, was using washout.
Site Preparation6/25/20186/25/20186/25/2018PPART
DetailsAndy J. Long
No site preparation inspection requested. Lots excavated and foundations in progress.

Two adjacent sites by same contractor. Permit sign posted, lined concrete washout and construction entrance installed. Subdivsion stormdrains have sediment bags.

No trackout, discharge, or fugitive dust at sites.
After backfill is conducted, will need to re-install perimter controls on the west lot. Follow up inspeciton scheduled.

Will remind GC and excavator of site preparation requirement.