General Inspection | 10/23/2019 | 10/23/2019 | 10/23/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/8/2019 | 10/8/2019 | 10/9/2019 | | PEND |
Andy J. Long
|
|
|
Bond for revegetation has expired and the front yard of home is a steep slope with no landscaping or stabilization measures. Will follow up with hillside bond. No offsite runoff issues observed, no temporary BMPs left onsite.
|
Site Final | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/4/2019 | 9/4/2019 | 9/4/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/20/2019 | 8/20/2019 | 8/20/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 | | PASS |
Michael Zawacki
|
|
|
Waiting on regrowth.
|
General Inspection | 7/18/2019 | 7/18/2019 | 7/19/2019 | | PASS |
Michael Zawacki
|
|
|
Revegetation in progress.
|
General Inspection | 7/3/2019 | 7/3/2019 | 7/3/2019 | | PASS |
Michael Zawacki
|
|
|
Hydroseeded and landscaped, waiting on growth.
|
General Inspection | 6/18/2019 | 6/18/2019 | 6/19/2019 | | PASS |
Michael Zawacki
|
|
|
Site has been hydroseeded, will watch for regrowth. Curbing on driveway to keep water flowing to drain scheduled for installation.
|
General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PASS |
Michael Zawacki
|
|
|
Sprinklers done, hasn't been hydroseeded.
|
General Inspection | 5/16/2019 | 5/16/2019 | 5/16/2019 | | PASS |
Michael Zawacki
|
|
|
Sprinklers completed, landscapers and hydroseeding supposed to be today.
|
General Inspection | 5/1/2019 | 5/1/2019 | 5/2/2019 | | PASS |
Michael Zawacki
|
|
|
Home and driveway completed. Site still needs landscaping.
|
General Inspection | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PASS |
Michael Zawacki
|
|
|
Crew on site installing heaters for future driveway. All water from home runs onto site retention.
|
General Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Michael Zawacki
|
|
|
No track out into cul-de-sac, workers parked on pavement. Trash box out front with permit displayed. Some small trash is around home.
|
General Inspection | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | FAIL |
Michael Zawacki
|
|
|
Road and sidewalk covered in trackout. Site needs a stabalized entrance. Message sent to RP.
|
General Inspection | 10/9/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Andy J. Long
|
|
|
rainfall inspection/correction follow up.
RP on duty maintaining storm drain sediment check . Dirt from sidewalk and tracked in culdesac was cleaned before rain, sheet flow is not turbid. Approved.
|
General Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | FAIL |
Michael Zawacki
|
|
|
Dirt tracked into road. Inlet has sandbag protecting one side, no witches hat. Lots of dirt and sediment running into drain, some has started to pile up along curb. Crane truck on site leaking onto street. Building materials stored on road.
|
General Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed:
- no construction entrance, trackout across sidewalk and in gutter of culdesac. Need to sweep up sidewalk and gutter. - forklift leaked oil in various spots of culdesac. Absorbent should be applied on any wet spots. - trash has either been blown or thrown down into vegetation below homesite. Needs to be picked up.
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | FAIL |
Michael Zawacki
|
|
|
Washout dumped and ran everywhere. Sent message to RP with pictures.
|
Site Preparation | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Michael Zawacki
|
|
|
Work began without site prep inspection. Permit displayed, natural buffer in place below home site. Western neighbors yard is protected by silt fence. No stabalized entrance, some dirt on sidewalk. Long exposed driveway, may cause issue if thunderstorm hits site.
|