Single Family Residence with small Casita. Site preparation inspection required prior to significant earth work. Silt fence perimeter to be installed along bottom of site at San Jose & San Felipe. Upper corner of san felipe has fiber wattles. Construction entrance to be installed at top of site off San Felipe. Additional slope interupting wattles may be required after grading and foundation installation.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final2/11/20202/11/20202/11/2020PPASS
DetailsAndy J. Long
Project canceled. Wattles are owned by parcel owner. Culpan & co no longer associated with project. No ESC requests.
General Inspection1/29/20201/29/20201/29/2020 PASS
DetailsMichael Zawacki
Project has been halted. No runoff or any issues at site.
General Inspection1/14/20201/14/20201/14/2020 PASS
DetailsMichael Zawacki
No longer building home
General Inspection12/30/201912/30/201912/30/2019 DEFR
DetailsMichael Zawacki
idle
General Inspection12/13/201912/13/201912/13/2019 PASS
DetailsMichael Zawacki
Idle.
RV was moved into neighbors driveway. Wattle pallet still on site, styrofoam not cleaned.
General Inspection11/28/201911/28/201911/29/2019 CANC
DetailsAndy J. Long
General Inspection11/13/201911/13/201911/14/2019 PEND
DetailsAndy J. Long
No material leaving site.

Inquuired with RP Doug as to fate of lot and permit. Construction has been halted.

Request to remove pile of discard styrofoam forms and notified that there is a large pallet of unused wattles on the site, and an RV with a Code Enforcement notice on it.
General Inspection10/29/201910/29/201910/29/2019 PASS
DetailsAndy J. Long
no activity, no request at this time.
General Inspection10/14/201910/14/201910/15/2019 CANC
DetailsAndy J. Long
General Inspection9/27/20199/27/20199/27/2019 CANC
DetailsAndy J. Long
General Inspection9/12/20199/12/20199/12/2019 PASS
DetailsMichael Zawacki
No runoff.
General Inspection8/28/20198/28/20198/29/2019 PASS
DetailsMichael Zawacki
Met with contractor, owner has backed out and looking for buyer.
General Inspection8/13/20198/13/20198/14/2019 PASS
DetailsMichael Zawacki
No new activity, areas that aren't vegetated have been sprayed with tackifier.
General Inspection7/25/20197/25/20197/25/2019PPASS
DetailsMichael Zawacki
No activity, site is clean. Disturbed area has been sprayed with tackifier.
General Inspection7/11/20197/11/20197/11/2019 CANC
DetailsAndy J. Long
General Inspection6/26/20196/26/20196/27/2019 FAIL
DetailsAndy J. Long
Need to sweep up along San Jose

Will send correction to RP
General Inspection6/7/20196/7/20196/10/2019 PASS
DetailsMichael Zawacki
No new activity. One section of wall that was being worked on completed. No workers on site.
General Inspection5/23/20195/23/20195/23/2019 PASS
DetailsAndy J. Long
No new activity. No trackout or discharges from site. Concrete washout pan still onsite.
General Inspection4/4/20194/4/20194/4/2019PPASS
DetailsMichael Zawacki
Working on concrete wall. Roll pan washout on site, stabalized access should be built for washout once in final position. Rock entrance installed for staging, form trailer in area. No major ESC issues, some tracking on apron by roll pan.
General Inspection3/27/20193/27/20193/27/2019PPASS
DetailsMichael Zawacki
Talked with builder on site. Some boot tracking they are cleaning up. BMPs installed in area where working.
BMP Violation3/20/20193/22/20193/22/2019APASS
DetailsMichael Zawacki
Met with contractors on site. Will put in temporary rock entrance and make sure to sweep at end of day. Starting retaining walls, will dig washout and line. Will eventually move entrance to top when sewer and gas work completed.
BMP Violation3/20/20193/20/20193/20/2019PFAIL
DetailsMichael Zawacki
No entrance installed, trackout and dirt into gutters. Pictures sent to RP with repair request, scheduled for 3/22
Random Inspection3/15/20193/15/20193/15/2019PFAIL
DetailsAndy J. Long
No construction entrance installed.

Phone call to RP to install next week. Will follow up
Site Preparation3/12/20193/12/20193/12/2019APASS
DetailsMichael Zawacki
Met with builders and RP and site prep. Work will start on retaining wall starting at curb. Wattle will be installed as they work and there is room. Site and road are supposed to be cleaned at end of work days.