Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberESC18-01053
StatusFinaled
Name MATTHEW B SCHULTZ
Site Address 4900 N FARROW ST
Project NameSpicebark Subdivision
Customer Number 
ePlanReviewNo
Description
Current home demo and prep for 14 home sub
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final1/27/20201/30/20202/3/2020PPASS
DetailsMichael Zawacki
All homes completed and stable, all individual esc permits closed.
Still some workers coming and going at site.
General Inspection1/27/20201/27/20201/27/2020 CANC
DetailsAndy J. Long
General Inspection12/26/201912/26/201912/26/2019 CANC
DetailsAndy J. Long
General Inspection11/25/201911/25/201911/26/2019 PASS
DetailsAndy J. Long
All homes on Cranberry are near completion. No corrections requested.
General Inspection10/25/201910/25/201910/28/2019 PART
DetailsMichael Zawacki
All homes completed exteriors, landscapers on site. Pallets of sod on sidewalk, lots of tracked topsoil on street.
Need to sweep when landscapers done.
General Inspection9/24/20199/24/20199/24/2019 PASS
DetailsMichael Zawacki
All homes framed and in different stages of completion. Some homes still need driveways, washout still on site. Every home has its own trash box. Most homes landscaped. Street looks like it has been recently swept. No issues at site.
General Inspection8/23/20198/23/20198/23/2019PFAIL
DetailsMichael Zawacki
Landscapers have topsoil and rocks stored on road, lots of tracking everywhere.
Rollpan on site and being used. Some builders better at keeping clean site.
General Inspection8/8/20198/12/20198/12/2019PPART
DetailsMichael Zawacki
Individual building lots have trash containment and are no bad. All workers parked on street, some dirt street needs to be swept when everyone is off site.
General Inspection8/8/20198/8/20198/8/2019 CANC
DetailsAndy J. Long
General Inspection7/8/20197/8/20197/8/2019PPASS
DetailsAndy J. Long
Subdivision development/infrastucture complete. New SFHs now in progress on Cranberry. BMPs installed. No corrections requested.
General Inspection7/4/20197/4/20197/5/2019 CANC
DetailsAndy J. Long
General Inspection5/31/20196/3/20196/3/2019PPART
DetailsMichael Zawacki
Work on foundations and homes has begun. Roll pan washout on site.
Some dirt on street and sidewalks from filling of backfill.
General Inspection4/18/20194/18/20194/18/2019PFAIL
DetailsMichael Zawacki
New Owner
Site is being used as dump, sent message and pictures to new owner.
General Inspection3/28/20193/28/20193/28/2019PPASS
DetailsMichael Zawacki
Site prep work completed. Road paved, curb gutter and sidewalk installed. No home building has begun.
General Inspection10/10/201810/10/201810/10/2018PPASS
DetailsMichael Zawacki
Curbing finished, sidewalk about half complete. Grader on site getting road bed prepped for paving. Road will need to be swept when equipment removed.
General Inspection9/11/20189/11/20189/11/2018PPASS
DetailsMichael Zawacki
No current activity. Site will need a proper construction entrance before building.
General Inspection8/22/20188/27/20188/27/2018APASS
DetailsMichael Zawacki
Sidewalk has been swept, area of sidewalk across street has been removed, area marked for utilities. Yards with flood irragation have been bermed off to prevent water from flowing onto and through job site. Permits are posted on telephone pole inside site.
General Inspection8/21/20188/22/20188/22/2018APART
DetailsAndy J. Long
follow up to complaint response

Street sweeper has visited site as requested, but there is still additional corrections.

- sweep sidewalks with push brooms across street
- install sediment protection on storm drain on McMillan
- continue improvements to prevent irrigation water from flowing into site from adjacent yard to the south of entrance
- relocate an ESC permit sign or SWPPP at entrance to site.

Talked to RP who said he will get it done. Follow up inspection on Monday.
Complaint Inspection8/21/20188/21/20188/21/2018PPEND
DetailsAndy J. Long
Flood irrigation flowed onto site causing muddy discharge and trackout to Farrow.

RP is working with homeowner to fix/contain the flood irrigation. Street sweeper scheduled for tomorrow AM. Rock construction entrance is reportedly installed.

Follow up scheduled.