General Inspection | 6/10/2020 | 6/10/2020 | 6/10/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 6/10/2020 | 6/10/2020 | 6/10/2020 | P | PASS |
Michael Zawacki
|
|
|
Homeowner responsible for lot
|
General Inspection | 5/26/2020 | 5/26/2020 | 5/26/2020 | | PASS |
Michael Zawacki
|
|
|
Home completed. DI bag in front full.
|
General Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 4/22/2020 | 4/24/2020 | 4/29/2020 | P | NR |
Andy J. Long
|
|
|
DI bag in front of home still installed.
Filled from multiple sites. May need to call in ACHD for service with winch
|
General Inspection | 4/22/2020 | 4/22/2020 | 4/22/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/7/2020 | 4/7/2020 | 4/8/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/23/2020 | 3/23/2020 | 3/23/2020 | | PASS |
Michael Zawacki
|
|
|
House is finished. Rear is a sand hill, lots of blanket installed, not stable.
|
General Inspection | 3/6/2020 | 3/6/2020 | 3/6/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/20/2020 | 2/20/2020 | 2/20/2020 | | PASS |
Andy J. Long
|
|
|
No sediment runoff or issues. Home complete and listed for sale. Backyard slope is
|
General Inspection | 2/5/2020 | 2/5/2020 | 2/6/2020 | | PASS |
Michael Zawacki
|
|
|
Will continue to monitor, blanket installed in back yard.
|
General Inspection | 1/21/2020 | 1/21/2020 | 1/21/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/6/2020 | 1/6/2020 | 1/8/2020 | | PASS |
Andy J. Long
|
|
|
Home complete. No sediment runoff or issues observed. Will continue to monitor ECB installation on slope behind home.
|
General Inspection | 12/20/2019 | 12/20/2019 | 12/20/2019 | | PASS |
Michael Zawacki
|
|
|
Home completed and landscaped. Lots of blanket used in back yard.
|
General Inspection | 12/5/2019 | 12/5/2019 | 12/5/2019 | | PASS |
Michael Zawacki
|
|
|
Landscapers on site, large pile of landscape rock on street.
|
General Inspection | 11/20/2019 | 11/20/2019 | 11/20/2019 | | PASS |
Michael Zawacki
|
|
|
Work has resumed, lot clean.
|
General Inspection | 11/5/2019 | 11/5/2019 | 11/6/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior crew on site. No runoff or trackout.
|
General Inspection | 10/21/2019 | 10/21/2019 | 10/21/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean, no new activity. Talked to neighbor who said buyer backed out and home is now low priority.
|
General Inspection | 10/4/2019 | 10/4/2019 | 10/4/2019 | | PASS |
Michael Zawacki
|
|
|
Lot is contained but dirty. Lots of debris from stucco work.
|
General Inspection | 9/18/2019 | 9/18/2019 | 9/18/2019 | | PART |
Andy J. Long
|
|
|
Perimeter controls installed. No material leaving site. No activity at site
Need to clean up trash bin and the stucco waste cleaned up.
|
General Inspection | 8/30/2019 | 8/30/2019 | 8/30/2019 | | FAIL |
Michael Zawacki
|
|
|
Big mess of stucco dumped on ground and around mixer.
|
General Inspection | 8/15/2019 | 8/15/2019 | 8/19/2019 | | PASS |
Andy J. Long
|
|
|
No activity. Perimeter sediment control wattle installed. Trash contained.
|
General Inspection | 7/31/2019 | 7/31/2019 | 8/1/2019 | | PASS |
Michael Zawacki
|
|
|
Perimeter surrounded by wattle, all trash in box. No ESC issues.
|
General Inspection | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Michael Zawacki
|
|
|
Large pile of drywall scraps in drive, will need to be cleaned up.
|
General Inspection | 7/9/2019 | 7/9/2019 | 7/12/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PEND |
Andy J. Long
|
|
|
James with Stock on site installig stakes into wattles as requested. Once complete, site will be back in compliance.
|
General Inspection | 6/20/2019 | 6/21/2019 | 6/21/2019 | P | FAIL |
Andy J. Long
|
|
|
follow up
wattle installed instead of silt fence. Not installed as discussed.
Wattle will be okay but needs to be staked in every 4-5 ft. It is only staked on the ends.
|
Complaint Inspection | 6/19/2019 | 6/19/2019 | 6/20/2019 | P | FAIL |
Andy J. Long
|
|
|
No sediment barrier or controls to direct flow of runoff away from adjacent property.
Met with James with Stock Construction.
Correction requiest to install silt fence to slow flow and capture sediment above the neighbors HVAC systema and then to line the property line with silt fence. Follow up inspeciton and compliance deadline is Friday 6/21 PM
|
General Inspection | 4/2/2019 | 4/9/2019 | 4/9/2019 | P | PASS |
Michael Zawacki
|
|
|
Trusses blocking sidewalk. No major ESC issues.
|
BMP Violation | 3/29/2019 | 4/2/2019 | 4/2/2019 | A | PART |
Andy J. Long
|
|
|
check for corrections
Site cleaned up. No sediment protection installed on storm drain.
Correction request to install sediment protection on storm drain in front of the house.
|
General Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed:
- clean up sidewalk and gutter in front of home - pick up all loose trash and placed in trash bin - pick up dumped concrete and dried slurry. - pick outpak washout left across the street - install coco mat sediment protection on the storm drain.
follow up scheduled
|
General Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | FAIL |
Michael Zawacki
|
|
|
Excavator on site, working on concrete forms. Lots of dirt on sidewalk and shoulder.
|
General Inspection | 11/29/2018 | 11/29/2018 | 11/30/2018 | P | PASS |
Andy J. Long
|
|
|
|
Conference | 11/30/2018 | 12/3/2018 | | A | |
Andy J. Long
|
|
|
|