Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberESC18-01289
StatusFinaled
Name CORY OVERLIN
Site Address 5944 S FEDERAL WAY
Project NameFalcon One Storage Condos
Customer Number 
ePlanReviewNo
Description
The project is located at the NE corner of Federal Way and E Summersweet Dr. The client purchased 4 parcels of land with the purpose of building Storage Units. There will be sewer and water delivered to the site as well as storm drain piping and one large seepage bed to store storm water runoff.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/26/20206/1/20206/1/2020APASS
DetailsMichael Zawacki
Site Final5/22/20205/26/20205/26/2020PNR
DetailsMichael Zawacki
Talked to foreman on site. Will get crew to pull DI bags on fed way, remove silt fence, and do trash walk.
Still steel building to be erected, no more dirt or concrete work.
Rescheduled final for next week.
General Inspection4/17/20204/17/20204/17/2020PPASS
DetailsMichael Zawacki
Site is clean and contained. Entrance is off federal way, no tracking. No trash has blown out.
General Inspection4/6/20204/6/20204/7/2020 PASS
DetailsMichael Zawacki
Building up and acting as perimeter. No issues.
General Inspection2/20/20202/20/20202/20/2020PPASS
DetailsMichael Zawacki
WIP on west side of project. Only entrance on Fed Way. No tras blown into fields, work area is all contained.
General Inspection2/14/20202/14/20202/14/2020PPASS
DetailsMichael Zawacki
Work has begun on new shell. Entrance of Fed way onto paved lot then rock, no trackout. All materials stored within site. Trash is being cleaned when it blows away.
General Inspection1/6/20201/6/20201/6/2020 PASS
DetailsMichael Zawacki
Entrance is off fed way. Apron is paved to rock. Site recently swept. Working on pads, no ointention to pour until weather is better, next buildings aren't scheduled to arrive for 2 months. No blown trash behind site.
General Inspection11/19/201911/19/201911/19/2019PPASS
DetailsMichael Zawacki
Around site is now paved, no one should need to drive in dirt.
Material for next phase of buildings delivered, pads have been poured.
May start pads for next phase depending on weather.
Trash has been cleaned from neighboring lot.
General Inspection11/7/201911/7/201911/7/2019PPASS
DetailsMichael Zawacki
Some of area paved and units sold. Entrance to Fed Way has been closed, concrete crew opened it.
Planning on getting rest of area paved on the 15th so they don't have mud issues. Concrete washout on sites, some small trash like drinks and labels around site.
General Inspection10/7/201910/7/201910/7/2019PPASS
DetailsAndy J. Long
BMP Violation9/25/20199/25/20199/25/2019PPASS
DetailsMichael Zawacki
New entrance was installed, currently closed for concrete work. Sidewalks and apron being installed, washout on site. Trash has been picked up, still some in field, will do walkthrough and clean up.
Plan is to pave main drive and finish pads before winter.
BMP Violation9/23/20199/24/20199/25/2019ACANC
DetailsAndy J. Long
BMP Violation9/17/20199/19/20199/23/2019PPEND
DetailsAndy J. Long
follow up
Tracking Control9/17/20199/17/20199/17/2019PFAIL
DetailsAndy J. Long
Construction entrance not maintained, trackount on Summersweet leading Federal Way. Concrete cutting slurry not properly contained within work area. High pH water flowing toward storm drain.

Lot of windblown trash east of site.

Corrections required:
- maintain/re-install construction entrance
- install sandbag/gutter barriers to contain and suck up concrete cutting slurry.
- pick up windblown trash east of site
General Inspection7/31/20197/30/20197/31/2019PPASS
DetailsMichael Zawacki
WIP on foundations and steel frames. Water truck and washouts on site. No ESC issues.
General Inspection7/2/20197/2/20197/2/2019PPASS
DetailsMichael Zawacki
Steel frame construction has begun. No blowing dust or other ESC issues.
General Inspection6/17/20196/17/20196/17/2019PPASS
DetailsMichael Zawacki
Lots of regrowth creating a natural buffer. Retaining walls and building pads poured. Water wagon on site, no dust. Dumpster on site, no loose trash.
General Inspection5/30/20195/30/20195/30/2019PPASS
DetailsMichael Zawacki
Met with foreman on site. Exit needs new rocks and to be cleaned up. Not much work with weather, some concrete poured. Ecopan on site, perimeter BMPs ok. No major ESC issues.
General Inspection4/30/20194/30/20194/30/2019PPASS
DetailsMichael Zawacki
Shotcrete wall completed, perimeter wall for first building completed. Getting ready to start with floors, will bring back eco pans. Roads are clean, not much activity.
General Inspection3/29/20193/29/20194/1/2019PPASS
DetailsAndy J. Long
WIP. No trackout from either entrance. No corrections at this time.
General Inspection1/24/20191/24/20191/25/2019PPASS
DetailsMichael Zawacki
Some grading activity, no new excavation. Shotcrete wall lokks complete, no workers on it. Street looks like it has just been swept, no trackout.
General Inspection1/8/20191/15/20191/15/2019APASS
DetailsMichael Zawacki
Not much activity, were changes in building plans and are still in review. Probably two weeks before Dasco starts disturbances for utilitie work. Shotcrete wall is being installed, two eco pans on site.
Sweepers are being used as needed.
General Inspection1/7/20191/8/20191/8/2019PPASS
DetailsAndy J. Long
No trackout to Federal Way or Summersweet. Construction entrances and storm drains sediment protection are installed.
General Inspection11/20/201811/20/201811/20/2018PPASS
DetailsMichael Zawacki
Grading in progress. All BMPs have been installed. Entrance on Federal Wat, exit onto still water, no trackout. Some large stockpiles on site.
Site Preparation11/5/201811/6/201811/9/2018APASS
DetailsMichael Zawacki
pre con already conducted. This is main site ESC permit. No duplicate permits required.
Stop Work Order10/24/201810/24/201810/24/2018ADONE
DetailsAndy J. Long
WBTBC working without with issued GRD and ESC permits. No site preparation inspection conducted. Double fee on ESC permit. Stop Work Order includes re-inspection fee and walk through inspection before proceeding.