General Inspection | 6/30/2020 | 6/30/2020 | 7/2/2020 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 7/2/2020 | 7/2/2020 | 7/2/2020 | P | PASS |
Andy J. Long
|
|
|
Scope of project complete. No active construction or new erosion or issues have occured. River bank and greenbelt repairs monitored maintained by Parks n Rec and river system management.
No ESC requests.
|
General Inspection | 6/8/2020 | 6/8/2020 | 6/11/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/22/2020 | 5/22/2020 | 5/29/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/7/2020 | 5/7/2020 | 5/8/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/22/2020 | 4/22/2020 | 4/23/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 4/7/2020 | 4/7/2020 | 4/9/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/23/2020 | 3/23/2020 | 3/23/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 3/6/2020 | 3/6/2020 | 3/6/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 2/20/2020 | 2/20/2020 | 2/20/2020 | | PASS |
Andy J. Long
|
|
|
No issues at installation. No much vegetation growth through the mat. As noted, the section of greenbelt and bank damage just up river has not been repaired.
|
General Inspection | 2/5/2020 | 2/5/2020 | 2/11/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/21/2020 | 1/21/2020 | 1/24/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/6/2020 | 1/6/2020 | 1/6/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 12/20/2019 | 12/20/2019 | 12/24/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/5/2019 | 12/5/2019 | 12/5/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/20/2019 | 11/20/2019 | 11/21/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/5/2019 | 11/5/2019 | 11/6/2019 | | PASS |
Michael Zawacki
|
|
|
Rock area stable, still exposed jute at top. Collapsed area of greenbelt not repaired.
|
Site Final | 4/4/2019 | 4/5/2019 | 4/8/2019 | P | CANC |
Andy J. Long
|
|
|
will keep permit open for monitoring revegetation. No current correction requests.
|
General Inspection | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PASS |
Andy J. Long
|
|
|
No issues observed, no corrections requested. Jute matting has stayed in place. Grass starting to grow. Will keep ESC permit open to monitor revegetation and performance in higher river flows.
|
General Inspection | 3/11/2019 | 3/11/2019 | 3/14/2019 | P | PART |
Michael Zawacki
|
|
|
Jute is not trenched at top, shingled properly.
|
Site Final | 2/13/2019 | 2/13/2019 | 2/13/2019 | A | NR |
Andy J. Long
|
|
|
9:45 AM
Need to confirm proper installation of jute matting on between rip rap and greenbelt.
|
Site Preparation | 1/31/2019 | 1/31/2019 | 2/1/2019 | P | CANC |
Andy J. Long
|
|
|
to be rescheduled
|
Site Final | 6/11/2020 | 6/12/2020 | | P | |
Andy J. Long
|
|
|
|