Permit Information
Permit NumberESC19-00160
StatusIssued
Name TIM NIEHOFF
Site Address 11389 W GABRIELLE DR
Project NameGalahad Sub No 2
Customer Number 
ePlanReviewNo
Description
This project consists of 5 residential townhouse buildings, landscaping, parking, and underground utilities.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/7/20208/7/20208/7/2020 PASS
DetailsMichael Zawacki
WIP on framing on all buildings, no current concrete work.
All areas have trash bins, still some small stuff on ground. A few workers parked on empty lot across street.
No dust, trackout, or anything leaving site.
General Inspection7/7/20207/7/20207/7/2020PPASS
DetailsMichael Zawacki
WIP on vertical and framing on three units, all foundations completed. Site has multiple trash and wood boxes. Trash crew scheduled for pickup. Road and sidewalks being swept.
General Inspection7/3/20207/3/20207/6/2020 CANC
DetailsAndy J. Long
General Inspection5/29/20206/1/20206/2/2020PPASS
DetailsMichael Zawacki
Two of the new pads are completed, building materials on site, no framing has begun.
Crew working on one pad freshly poured, lined washout used. Two remaining pads being prepped, not yet poured.
Site has trash box in south east. Some old wattles line disturbed areas. Some mud in gutters, no major issues.
General Inspection6/2/20206/2/20206/2/2020PCANC
DetailsAndy J. Long
General Inspection5/28/20205/28/20205/29/2020 CANC
DetailsAndy J. Long
rescheduled
General Inspection4/27/20204/27/20204/27/2020 PASS
DetailsMichael Zawacki
Met with superintendant at site.
Some areas of joint trench need to be repaired.
Concrete work completed until flat work.
Plan is to get roads in before verticle construction.
BMP Violation3/24/20203/25/20203/26/2020PPEND
DetailsAndy J. Long
NOV follow up compliance inspection

Most corrections requested have been completed:

- storm drain sediment bags on south side of Gabrielle have been cleaned
- Entrance to phase has been swep and gravel placed for stabilized entrance
- Piles of trash have been picked up and consolidated
- ESC permit sign posted


Work is scheduled to resume next week. At that time remaining corrections will be complete:

- provide trash box or dumpster as soon as workers arrive for grading and excavation duties
- finish picking up all loose trash and litter within site and stuck in vegetation around perimeter.

No escalation of enforcement necessary, will follow up on site at end of next week to check on trash and housekeeping at site.
BMP Violation3/6/20203/9/20203/10/2020AFAIL
DetailsAndy J. Long
NO activity at site. West phase is disturbed, unstabilized and vacant.

Multiple Violations:

- no maintained BMPs onsite
- dirty/full storm drain inlet bags on Gabrielle
- loose trash strewn all around phase 2 perimeter and on north side of Gabrielle.
- no construction entrance
- no ESC permit sign posted
- no stabilization of disturbed areas and stockpiles

Preparing Notice of Violation to send to RP Tim Neihoff and Sterling Homes.
General Inspection3/6/20203/6/20203/6/2020PFAIL
DetailsMichael Zawacki
phase 2
No foundation work has begun. Lots of loose trash on site and blown onto lot across street, cans, wrappers, etc.
No construction entrance to site from road or existing apartments.
Bunch of random trash and materials along fence on southern perimeter.
General Inspection2/14/20202/19/20202/19/2020APASS
DetailsAndy J. Long
No new activity. No trackout or other issues currently. Will need to add BMPs for next phase.
General Inspection2/14/20202/14/20202/14/2020 CANC
DetailsAndy J. Long
General Inspection1/9/20201/14/20201/14/2020APASS
DetailsMichael Zawacki
Site is snow covered, no workers on site. Piles still along fence, unable to see blown trash due to conditions.
General Inspection1/6/20201/7/20201/9/2020PCANC
DetailsAndy J. Long
General Inspection12/24/20191/2/20201/6/2020PCANC
DetailsAndy J. Long
BMP Violation12/17/201912/20/201912/24/2019AFAIL
DetailsAndy J. Long
Some corrections complete. Road appears to have been swept and some trash piles removed.

Remaining corrections:
- Lots of trash across Gabrielle and around perimeter.
- Did not change/maintain DI bags as requested.
- no improvement to construction entrance.

No activity at site, will follow up after holidays
BMP Violation12/17/201912/18/201912/17/2019APEND
DetailsAndy J. Long
notified Kenny with Sterling homes about corrections needed. Rescheduled for Friday
General Inspection12/13/201912/13/201912/17/2019 FAIL
DetailsAndy J. Long
Violations:

- big pile of uncontained trash
- noncompliant construction entrane
- loose dirt and trackout on road
- trash from project blown across street
- DI bags need to be removed. Full of dirt and cigaretted butts
General Inspection11/12/201911/12/201911/12/2019 PART
DetailsMichael Zawacki
First pahse exterior work completed. Parking lot done on east side. Lots of loose trash and trash piles. Garbage trailer is overflowing.
Complaint Inspection5/15/20195/16/20195/16/2019APART
DetailsMichael Zawacki
No dust, water truck on site.
Concrete crews working on sidewalks. Roads will need to be swept at end of day.