Permit Information
Permit NumberESC19-00398
StatusFinaled
Name DYLAN SCHNEIDER
Site Address 3156 N LANCASTER PL
Project Name3156 N Lancaster Place
Customer Number 
ePlanReviewNo
Description
per attached conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/19/20205/29/20205/29/2020PPASS
DetailsMichael Zawacki
General Inspection5/19/20205/19/20205/19/2020 PASS
DetailsAndy J. Long
Revegetation looks like it establishing well. No dirty runoff leaving site, no erosion issues observed

Scheduled ESC site final for end of next week.
General Inspection5/1/20205/1/20205/1/2020 PASS
DetailsMichael Zawacki
No issues, no blowouts from rain event.
General Inspection4/16/20204/16/20204/16/2020 CANC
DetailsAndy J. Long
General Inspection4/1/20204/1/20204/1/2020 PASS
DetailsMichael Zawacki
Home completed.
Some gras starting to grow. Gravel installed along paved common drive, no rills or undercutting.
General Inspection3/17/20203/17/20203/17/2020 PASS
DetailsAndy J. Long
Site has been hydroseeded and home is occupied. Will monitor revegetation. No ESC requests to builder.

Note: Working with subdivsion CGP permit holder to address DI bag maintenance and erosion controls on open lots
Site Final2/26/20202/28/20203/5/2020PPEND
DetailsAndy J. Long
will monitor hydroseeding growth
Conference2/26/20202/26/20202/26/2020PDONE
DetailsAndy J. Long
Site is prepped for hydroseeding, which will be completed tomorrow.

After hydroseeding RP will do final sweep and clean up and I will check for site final on Friday.
General Inspection2/6/20202/6/20202/6/2020 PASS
DetailsMichael Zawacki
Perimeter BMPs installed. No runoff from site.
General Inspection1/22/20201/22/20201/23/2020 PASS
DetailsAndy J. Long
No muddy runoff or trackout. BMPS installed. RP on site daily
General Inspection12/24/201912/24/201912/24/2019 PASS
DetailsMichael Zawacki
New silt fence and wattle installed at bottom of driveway. Site clean, no issues.
General Inspection12/9/201912/9/201912/9/2019PPASS
DetailsMichael Zawacki
No blowouts or failures from rain event.
Complaint Inspection10/14/201910/14/201910/16/2019PPASS
DetailsAndy J. Long
trash?

Trash contained. WIP hauling off stockpile of unused backfill.
General Inspection9/17/20199/17/20199/17/2019PPASS
DetailsMichael Zawacki
No runoff. Talked to builder, Installed gator guard to keep water directed toward site and off road, snake bags on shared drive.
Conference8/29/20198/29/20198/29/2019PDONE
DetailsAndy J. Long
RP will continue to sweep up the common driveway each day of work. After concrete for planter boxes is placed and backfill complete, constructin entrance or driveway will be required.

NO loose trash, trackout, or discharges.

Correction to install additional concrete washout and cleanup old washout areas.
Complaint Inspection8/26/20198/26/20198/26/2019PPART
DetailsAndy J. Long
trash

Some loose trash arond site, but trash container is onsite and in location out of the wind.

Corrections needed:
- install construction entrance for lower area
- provide new concrete washout containment pit, clean up old washout
- install perimeter controls/stabilization on area where loose dirt has been put into existing drainage paths.
General Inspection8/16/20198/16/20198/16/2019PPART
DetailsMichael Zawacki
Lots of exposed area and soil is loose, should be watered or covered if not being worked. Road has been swept, just looks dirt stained.
General Inspection8/2/20198/5/20198/5/2019APASS
DetailsMichael Zawacki
WIP on installing trusses on poured walls. Gator guard has been installed where silt fence was destroyed on bottom of hill. No backfill has been removed, stockpiles still at top of lot.
General Inspection7/30/20197/30/20198/2/2019PCANC
DetailsAndy J. Long
General Inspection7/25/20197/25/20197/26/2019PPART
DetailsMichael Zawacki
Road has been swept.
Silt fence on bottom of lot has been destroyed, no lower perimeter controls.
Top of lot has backfill stockpiles, no perimeter protection below them, any runoff will go right onto road.
Conference7/12/20197/12/20197/12/2019PDONE
DetailsAndy J. Long
RP installed new lined washout at top of site and put a sign next to it. Portapot placed upright and secured with rebar. Common driveway swept. Stockpiles are onsite for backfill after foundation for garage level.
Conference7/1/20197/2/20197/2/2019APASS
DetailsAndy J. Long
930-10

Site common drive has been swept requested. Stockpile no longer on pavement. Installed gravel bag check dams to direct water behind the silt fence.

Crew laying forms for lower garage foundations. More excavation remains. After driveway access installed, will install perimeter silt fence in the two downslope drainages below excavation.

RP-GC stated he will have trucks rinse into pump and pumptruck will take it back to site. Alternatively a lined pit may be used.
Complaint Inspection7/1/20197/1/20197/1/2019PFAIL
DetailsAndy J. Long
Site is not yet contained due to large excavation required. Loose dirt and no sediment barrier along the common drive.

Correction request to sweep loose material off common drive. Meeting scheduled with RP to go over BMPs needed now that the intial footprint has been excavated.

General Inspection6/19/20196/21/20196/24/2019PPASS
DetailsAndy J. Long
No issues on 6/21
Site Preparation6/17/20196/17/20196/18/2019ADONE
DetailsMichael Zawacki
NO BMPs installed. Current limits of disturbance has large buffer. Perimeter BMPs will be needed on right side of lot as excavation size increases. Street will need to be swept after hauling out backfill.