General Inspection | 7/31/2020 | 7/31/2020 | 8/3/2020 | | PASS |
Michael Zawacki
|
|
|
Needs landscaping.
|
General Inspection | 7/16/2020 | 7/16/2020 | 7/16/2020 | | PASS |
Michael Zawacki
|
|
|
Site still needs landscaping.
|
General Inspection | 7/1/2020 | 7/1/2020 | 7/1/2020 | | PASS |
Michael Zawacki
|
|
|
Needs landscaping
|
General Inspection | 6/15/2020 | 6/15/2020 | 6/15/2020 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 5/29/2020 | 5/29/2020 | 5/29/2020 | | PASS |
Michael Zawacki
|
|
|
Home is completed. Landscapers on site.
|
General Inspection | 5/14/2020 | 5/14/2020 | 5/14/2020 | | PASS |
Michael Zawacki
|
|
|
Exterior looks completed. Worker on site setting forms for driveway and sidewalk, washout on site. No esc issues.
|
General Inspection | 4/28/2020 | 4/28/2020 | 4/29/2020 | | PASS |
Andy J. Long
|
|
|
WIP. NO trackout or discharges. Permit sign posted. Approved
|
General Inspection | 4/9/2020 | 4/9/2020 | 4/9/2020 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained.
|
General Inspection | 3/25/2020 | 3/25/2020 | 3/25/2020 | | PASS |
Michael Zawacki
|
|
|
Exterior work looks completed. Lot is clean and contained. Silt fence still along road, is in bad shape and not needed anymore. Some marking paint going up road, may get torn up.
|
General Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 | | PASS |
Michael Zawacki
|
|
|
Home exterior about completed. Washout was used for stucco. Silt fence needs to be repaired. Nothing leaving site.
|
General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Andy J. Long
|
|
|
No trackout or loose trash. Home is framed. No corrections requested
|
General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Home is framed and roofed. Site clean.
|
General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Michael Zawacki
|
|
|
Site clean and contained.
|
BMP Violation | 10/4/2019 | 10/9/2019 | 10/8/2019 | A | PASS |
Michael Zawacki
|
|
|
Met with owner on site. Area is clean.
|
General Inspection | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | FAIL |
Michael Zawacki
|
|
|
Washout dumped in front of garage pad. Message sent to RP and follow up scheduled.
|
General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Michael Zawacki
|
|
|
Framing has begun. Site is clean, looks like washout was hauled off. Will need trash container for wood scraps.
|
Site Preparation | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted on temp. power pole. Rock construction entrance installed. No trackout or discharges.
RP Clayton stated that an outpak conrcrete washout will be used for foundation work.
After backfill, the perimeter silt fence along constructiion entrance should be re-installed.
|