Information based on query as of Wednesday, May 1, 2024.
Permit Information
Permit NumberFIR18-00583
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 8000 S FEDERAL WAY
Project NameMICRON BUILDING 37
Customer Number 
ePlanReviewYes
Description
[Micron Building 37 - Office Building - C30616] PLAN MODIFICATION 12/6/2018 Pedestrian Link **MAS**
The fire sprinkler scope of work consists of Level 2 fire sprinkler system. Shall connect to the existing 6" standpipe from previously approved FIR18-00428, and extend throughout the entire level 2 area of building 37. The system is utilizing upright and pendant sprinklers supplied by the wet system with 4" mains, 1½" branch lines and 1" arm-overs and drops, for light and ordinary hazards.

• The underground piping is under permit FIR18-00308.
• Standpipes and Level 3 are under permit FIR18-00428.
• Calculations were performed FIR18-00428. See reference drawing FP-10

[BLD18-01064]
Permit for the build out of a new three story office building to include exterior wall infill and finishes, general site work and the completion of the interior of the building. This building is fully fire sprinklered for area increase. The structural frame and foundation were permitted under BLD18-00157.

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/26/201812/28/201812/28/2018APASS
DetailsJim Page
Final fire sprinkler inspection for level 2 complete.

Mike Martin is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro12/14/201812/17/201812/17/2018PDONE
DetailsJim Page
Hydrostatic test for level 2 witnessed, no pressure loss observed.

Tony Phone #: ###-####
INSP-Sprinkler Rough-in12/12/201812/13/201812/13/2018APASS
DetailsTroy Cobbley
This inspection was for the Area "C" Fitness Center. Piping can be covered. Per contractor the limited use of wood is fire rated.

Tony Phone #: ###-####
INSP-Sprinkler Rough-in12/11/201812/12/201812/12/2018AFAIL
DetailsTroy Cobbley
This inspection was for the Area "C" Fitness Center. Piping could not be viewed due to insulation blocking it. Could not perform inspection. No piping to be covered prior to a rough-in inspection.

Tony Cetani is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/11/201812/11/201812/11/2018PCANC
DetailsJim Page
Rescheduled for 12DEC18 per conversation with POC, this request is cancelled.

Tony Cetani is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/7/201812/7/201812/7/2018PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in sky-bridge link complete, approved for cover.

Tony Cetani is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/29/201811/30/201811/30/2018PPART
DetailsJim Page
Tamper switches in riser room and level 2 are now being monitored, flow switches in riser room and level 2 are monitored, both report to micron central station, system on level 2 can be made active.

Flow switch test per Tony Cetani ###-#### Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/27/201811/28/201811/28/2018ADONE
DetailsJim Page
Conference complete

Tony Cetani is the contact and he would like a 2nd floor consultation. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/26/201811/26/201811/26/2018PPART
DetailsJim Page
Previously noted issue for fire sprinkler in exterior canopy corrected, area inspected approved for ocver.

Tony Cetani is the contact for this rough to cover inspection. He needs one head on the first floor looked at. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/21/201811/26/201811/26/2018APART
DetailsTroy Cobbley
The pendant head piping on the second floor marked "ok" in red is ok for cover. The first floor head in the exterior canopy is not ok for cover due to wet piping being installed in a cold area.
INSP-Sprinkler Rough-in11/19/201811/20/201811/20/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in lobby and hardlid on level 2 complete, areas inspected approved for cover.

Tony Cetani is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/14/201811/15/201811/15/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in various areas complete, areas inspected approved for cover.

Tony Cetani is the Shilo Foreman. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/13/201811/13/201811/13/2018PFAIL
DetailsTroy Cobbley
No city approved plans for the areas requested for inspection

Tony Cetani is the contact. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro11/13/201811/13/201811/13/2018PFAIL
DetailsTroy Cobbley
Not ready for hydro since all heads have not been cut in.

Tony Cetani is the contact. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush8/24/20188/27/20188/27/2018ADONE
DetailsJim Page
Underground main line flush complete.

Phone #: ###-#### Inspection requested via web by Stan Beus