Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberFIR18-00701
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 711 N CURTIS RD
Project NameST. AL'S ENCOMPASS REHAB
Customer Number 
ePlanReviewYes
Description
[St. Alphonsus Rehabilitation Hospital]
The fire sprinkler scope of work consists of two new wet systems supplied by 6” underground, 4” backflow preventer and 4” header. Both systems are designed as grids. Extended coverage sprinklers are being utilized for corridor protection. The building has steel structural members therefore only pendent protection is required.

• The underground piping is under permit FIR18-00607

[BLD18-01425]
(ST. ALPHONSUS REHABILITATION HOSPITAL – NEW BUILDING) (DRH17-00423 and DRH18-000138) (CAR17-00017 and CUP17-00060) (Project Management-Ron Hill) The fire sprinkler system is used for occupancy and building area increase. To construct a 49,821 square foot one story rehabilitation hospital with 40 sleeping units located near the Southwest corner of the intersection of Emerald Street and Curtis Road. Every sleeping unit including the associated toilet/shower room, except for the bariatric toilet/shower rooms, is required to comply as an “accessible unit” for the disabled. Work is to include reinforced concrete footings (continuous and spot), reinforced concrete monolithic stem walls and slabs on grade, protected exterior slab edge insulation, reinforced concrete piers, steel columns with steel base plates, steel braced frames, steel beams, open web steel bar joists, steel roof deck, steel roof top mechanical screen walls, membrane roof covering over rigid insulation, primary and secondary roof drains, steel stud exterior nonbearing walls, sandstone exterior veneer, EIFS, exterior metal panels, exterior windows, exterior doors, metal sun shade awnings, interior nonbearing walls, interior doors, interior windows, a 2-hr fire barrier wall to function as a horizontal exit, 1-hr smoke barrier walls to create smoke compartments, I-2 rated corridors, a Type I grease hood and duct system, a grease trap, millwork, and interior finishes. Activities that require Special Inspection include soils, concrete, masonry, steel (including welding and bolting), and anchors post-installed in hardened concrete. The concrete floor slab will be recessed at the walk-in cooler and freezer and at floor tile areas. In addition, a 7-foot-tall masonry trash enclosure with plaster finish and tube steel gates, a 17-foot-tall masonry emergency generator enclosure with plaster finish and steel louvers, a 17-foot-tall masonry bulk oxygen enclosure with plaster finish and steel louvers, and a therapy garden with an elevated pavilion structure will be constructed. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any installation work on such systems. **CJW**

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/16/20197/17/20197/17/2019APASS
DetailsTroy Cobbley
Permit finaled.

MIKE Phone #: ###-####
INSP-Final Inspection7/2/20197/3/20197/3/2019APART
DetailsTroy Cobbley
Todays inspection was just for interconnections with the facp so that furniture could be moved in. Forward flush passed. The riser interconnections with the FACP function. Need a map at the risers showing the sprinkler zones and the risers marked with the zones. For a final remaining tile and canopies need to be installed.

MIKE OSWALD IS OUR FOREMAN AND CONTACT Phone #: ###-#### Inspection requested via web by Brad Bettencourt
INSP-Sprinkler Rough-in/Hydro6/3/20196/3/20196/3/2019PPASS
DetailsTroy Cobbley
System A rough-in passed and piping can be covered. System A overhead hydro test witnessed with no pressure loss.

Mike Phone #: ###-####
INSP-Sprinkler Rough-in5/30/20195/30/20195/30/2019PPASS
DetailsTroy Cobbley
The single sprinkler pendant in the west entry lobby ceiling is ok for cover. Rick Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro5/15/20195/16/20195/16/2019APASS
DetailsTroy Cobbley
Rough-in complete for area B. All piping in area B can be covered. Overhead hydro test for area B witnessed with no pressure loss. Mike Phone #: ###-####
INSP-Sprinkler Rough-in5/7/20195/7/20195/7/2019PPASS
DetailsTroy Cobbley
See the city approved plans for areas where piping above the hardlids is ok for cover.


rough to cover // Mike Phone #: ###-####
INSP-Sprinkler Rough-in4/26/20194/26/20194/26/2019PPASS
DetailsTroy Cobbley
See the city approved plans for areas marked where piping is ok for cover.

Mike Phone #: ###-####
INSP-Sprinkler Rough-in4/10/20194/10/20194/10/2019PPASS
DetailsTroy Cobbley
See the city approved plans for additional locations whee piping can be covered as marked "ok"


Mike Phone #: ###-####
INSP-Sprinkler Rough-in4/4/20194/5/20194/5/2019PPART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with green highlighter/red ink areas approved for cover.

Javier Phone #: ###-####
INSP-Sprinkler Rough-in3/29/20193/29/20193/29/2019PPASS
DetailsTroy Cobbley
See the city approved plans for piping above hardlids that can be covered.

Mike Phone #: ###-####
INSP-Sprinkler Rough-in3/18/20193/19/20193/19/2019APASS
DetailsTroy Cobbley
See the city approved plans for piping that is ok for cover above hardlids. Mike Phone #: ###-####
INSP-Sprinkler Rough-in3/11/20193/11/20193/11/2019PPASS
DetailsTroy Cobbley
See the city approved plans for the hard lids marked "ok" where piping can be covered. and other areas dated and marked where the overhead rough-in is passed.

Mike Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro3/7/20193/7/20193/7/2019APASS
DetailsTroy Cobbley
See the city approved plans for areas marked that I inspected today. A re-inspection for this area will be needed when the sprinkler drops have been cut in.

MIKE IS OUR FORMAN Phone #: ###-#### Inspection requested via web by Brad Bettencourt