Permit Information
Permit NumberFIR18-00886
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 707 N ARMSTRONG PL
Project NameCDHD Renovations
Customer Number 
ePlanReviewYes
Description
[Central District Health Department (CDHD) - Interior Remodel]
The fire sprinkler scope of work consists of renovations to 42,606 ft² Single Level Building to be sprinklered per NFPA 13 Occupancy class S-1, B, A3, Construction Type VB. Modification to existing system point of connection to be at existing fire sprinkler riser underground. ALL sprinklers to be changed to quick response type.

[BLD18-02644]
The fire sprinkler system is used for building area increase and for code trade-offs. To remodel about 20,000 square feet of area within an existing 42,606 square foot building for the existing whole building tenant. A large portion of this building is used as an outpatient medical clinic where no one is rendered incapable of self-preservation. Work includes interior nonbearing walls, interior doors, interior windows, five (5) single-user toilet rooms accessible to the disabled, a new exterior door, suspended acoustical ceilings, gypsum board ceilings and soffits, millwork, and finishes. Structural work includes reinforced concrete footings, enlarged existing reinforced concrete footings, steel columns with steel base plates and anchor bolts, and wood beams. Special Inspection is required for soils, concrete, post-installed anchors in hardened concrete, and for steel fabrication including welding. The proposed work will be done in phases. A compliant means of egress is required to be maintained from each occupied portion of this building for the duration of the construction project. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit is intended to establish a new Certificate of Occupancy for the entire building. The fire sprinkler system is required to comply with NFPA 13, including changing all fire sprinkler heads to quick-response, and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/11/201912/11/201912/11/2019PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection12/2/201912/3/201912/3/2019AFAIL
DetailsTroy Cobbley
Not ready for a final yet. This inspection is for a sprinkler rough-in. See the city approved plans additional heads where piping is ok for cover. I noted on pendant that still needs changed to quick responce and verification that the extended coverage heads can be used in a Storage Room.

Contact Hunter Anderson ###-#### 30 min prior to TCO/Final Insp start please Hunter prefers an early AM inspection if possible

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in11/19/201911/20/201911/20/2019PPASS
DetailsTroy Cobbley
See the city approved plans for areas marked "ok" where the piping is ok for cover.

Contact Hunter Anderson ###-#### 30 min prior to RTC insp Start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in11/18/201911/19/201911/19/2019PCANC
DetailsTroy Cobbley
Contact Hunter Anderson ###-#### 30 min prior to RTC Insp start please

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Final Inspection8/15/20198/16/20198/16/2019PPART
DetailsJim Page
Previously noted items for phase 2 complete, final fire sprinkler inspewction for phase 2 complete.

Contact hunter Anderson ###-#### 30 Min prior to Final Insp Phase 2 start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Final Inspection8/14/20198/15/20198/15/2019AFAIL
DetailsTroy Cobbley
Inspection was for completion of the phase 2 work. I noted one pendant overspaced in an office, one pendant too close to a wall in another office and one exam room where a standard esponce pendant had been left with a new quick responce pendant. HC Company is going to remove a door that is causing an obstruction in a corridor.

Contact Hunter Anderson ###-#### 30 min prior to Final Insp of Phase 2 start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in7/18/20197/19/20197/19/2019APASS
DetailsTroy Cobbley
The piping at the two heads in the west side corridor is ok for cover.

Contact Noemi Carrero ###-#### 30 min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in7/18/20197/18/20197/18/2019PPASS
DetailsTroy Cobbley
See the city approved plans for areas marked ok where piping is ok for cover.

Contact Taigen Hines ###-#### 30 min prior to RTC insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in7/17/20197/17/20197/17/2019PPASS
DetailsTroy Cobbley
See the city approved plans for additional rooms marked "ok" where piping is ok for cover.

Contact Noemi Carrero - ###-#### 30 Min prior to RTC Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in7/16/20197/17/20197/17/2019APASS
DetailsTroy Cobbley
See the city approved plans with areas marked "ok" where piping is ok for cover.

Contact Noemi Carrero - ###-#### 30 Min prior to RTC Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in7/15/20197/16/20197/16/2019PCANC
DetailsTroy Cobbley
Contact Noemi Carrero ###-#### 30 min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in7/10/20197/11/20197/11/2019APASS
DetailsTroy Cobbley
See the city approved plans for rooms marked "ok" where piping can be covered.

Contact Noemi Carrero ###-#### 30 min prior to RTC Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in6/26/20196/26/20196/26/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlids in rooms 109 and 256 complete, hardlids approved for cover.

Contact Noemi Carrero - ###-#### 30 min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in6/26/20196/26/20196/26/2019PCANC
DetailsJim Page
Contact Noemi Carrero ###-#### 30 min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Final Inspection3/25/20193/26/20193/26/2019APART
DetailsTroy Cobbley
Phase 1 work complete.

Contact Hunter Anderson ###-#### - Fire Final per Troy Cobbley

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Final Inspection2/27/20193/1/20193/1/2019APART
DetailsTroy Cobbley
Phase 1 area work is complete except one existing pendant needs deleted as discussed and plan review needs to approve leaving the existing pendnat supplied from the dry system as previously discussed.

Please call Hunter 30 minutes before inspection.
Thank you, Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in1/29/20191/30/20191/30/2019APASS
DetailsTroy Cobbley
The pendant heads in the corridor have been modifed and the piping can be covered. See the city approved plans for these additional heads marked "ok"


Contact Tanner Loomis - ###-#### 30 min prior to RTC iInsp Start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in1/29/20191/29/20191/29/2019PPASS
DetailsTroy Cobbley
See the city approved plans for pendant heads marked "ok" where piping can be covered. I noted several pendants that are overspaced and will need adjusted. I defered the existing pendants fed from the dry system being removed or left installed to plan review.
INSP-Sprinkler Rough-in1/28/20191/29/20191/29/2019ACANC
DetailsTroy Cobbley
Contact Tanner Loomis ###-#### 30 min prior to RTC Insp start please

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in1/28/20191/29/20191/28/2019ACANC
DetailsTroy Cobbley
Contact Tanner Loomis ###-#### 30 min prior to RT Insp start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in1/28/20191/28/20191/28/2019PCANC
DetailsTroy Cobbley
Contact Tanner Loomis ###-#### - 30 min prior to RTC Insp Start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in1/11/20191/14/20191/14/2019PPASS
DetailsTroy Cobbley
See the city approved plans for locations marked "ok" where sprinkler piping is ok for cover.

Contact Hunter Anderson ###-#### 30 Min prior to RTC Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank