INSP-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Troy Cobbley
|
|
|
The FDC piping has been changed to galvanized. Permit finaled. Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | CANC |
Troy Cobbley
|
|
|
Could not make it to this inspection due to work load and time constriants. Will need to be rescheduled.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | FAIL |
Troy Cobbley
|
|
|
**Failed FDC piping that is exposed needs to be galvanzied. Location approved.*MAS**
Gabe Garduno is the contact for this final inspection. Thank you for your help. Have a nice day. Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PART |
Troy Cobbley
|
|
|
The fire sprinkler work in the six north end apartments is complete. 1st - 3rd floors. The fire alarm interconnect is complete. FDC nees relocated from the air conditioner condenser.
Gabe Garduno is the contact for this final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | FAIL |
Troy Cobbley
|
|
|
Today's inspection had it passed would be only for the six north most apartments. However two of the three flow switches did not function. Still need to test the crawl space tamper switches.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro tests witnessed.
Gabe Garduno is the contact for this overhead Hydro test. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, leak was found, hydrostatic test to be rescheduled for a later date.
Gabe Garduno is the contact. This inspection is to be done in connection with an underground flush/hydro for 11792 W. Fairview at 10:00 AM, as well as an underground flush/hydro for this building. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Troy Cobbley
|
|
|
Tenting inspection passed. Piping can be covered.
Gabe Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | FAIL |
Troy Cobbley
|
|
|
Tenting inspection failed. To be repaired as discussed in the breeze ways
|
INSP-Sprinkler Rough-in | 5/17/2019 | 5/20/2019 | 5/20/2019 | P | PART |
Troy Cobbley
|
|
|
Tenting is not complete for the third floor. Rough-in for the first and third floors is complete except for acouple of tie-ins at the Breezeway. Riser room tenting is not complete.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/10/2019 | 5/13/2019 | 5/13/2019 | P | PASS |
Troy Cobbley
|
|
|
Todays inspection was for the second floor only. Piping can be covered but a second cover inspection will be needed when the soffits are installed.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/6/2019 | 5/7/2019 | 5/7/2019 | A | FAIL |
Troy Cobbley
|
|
|
Numerous corrections needed. Wil need to be rescheduled when tenting, pipe sizes addressed and install is complete. Gabe Garduno is the contact for this partial RTC. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|