Permit Information
Permit NumberFIR19-00718
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 2723 S SIMSBURY LN
Project NameGRAYWOODS LOT 10
Customer Number 
ePlanReviewYes
Description
TFSS TO INSTALL A NEW 13D FIRE SPRINKLER SYSTEM IN THIS NEW SINGLE FAMILY DWELLING.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/15/20201/15/20201/15/2020PPASS
DetailsTroy Cobbley
Permit finaled.

James will reach out on panel patching. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Final Inspection1/14/20201/14/20201/14/2020PCANC
DetailsTroy Cobbley
Not ready.

Call James about repair work around access panel Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Final Inspection1/10/20201/13/20201/13/2020PFAIL
DetailsTroy Cobbley
Waiting for the builder to repair the wall at the riser/access panel. Per contractor the irrigation system is not a shared system with the fire sprinklers.

Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Final Inspection1/9/20201/10/20201/10/2020PFAIL
DetailsTroy Cobbley
**Failed* Ceilings need patching around escutcheons, irrigation needs to tied into flow switch, required signage needs to mounted on riser.**MAS**
Call James before heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello
INSP-Final Inspection1/9/20201/9/20201/9/2020PCANC
DetailsTroy Cobbley
Call James when heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Final Inspection1/7/20201/8/20201/8/2020ACANC
DetailsTroy Cobbley
Call James before heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro11/7/201911/7/201911/7/2019PPASS
DetailsTroy Cobbley
Overhead hydro witnessed with no loss on guage.

Hydro only - ready any time. Call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro10/16/201910/17/201910/17/2019PFAIL
DetailsTroy Cobbley
Overhead hydro failed due to sheetrock workers opening valve

Call James before heading out, hydro only while it is warm enough. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in10/8/201910/9/201910/9/2019APASS
DetailsTroy Cobbley
Tenting inspection passed. Piping can be covered. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in10/3/201910/4/201910/4/2019AFAIL
DetailsTroy Cobbley
Tenting inspection failed due to modifications needed to block out cold air from entering the area under the second floor. I met with the builder and discussed it. As Built plan is already in progress and will be submitted to Mark within the next few days. Call James if there are any issues, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro9/30/201910/2/201910/2/2019APART
DetailsTroy Cobbley
Rough-in passed but as-builts need to be submitted showing changes. No piping to be covered until as-builts are provided and a tenting inspection has been passed. The supply piping to the riser has not been provided yet. Please call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello