First Notice | | 7/12/2020 | 8/11/2020 | | DONE |
|
|
|
MAILED 8-14-2020
|
Permanent Occupancy | | | 7/2/2020 | | DONE |
|
|
|
|
BLD-Final | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Tell Riley
|
|
|
Call Wes Phone #: ###-#### Inspection requested via web by Wes palm//CDHD signature was confirmed via photo from Wes//final is now complete for occupancy//
|
BLD-Final | 6/23/2020 | 6/23/2020 | 6/23/2020 | P | PART |
Tell Riley
|
|
|
Please Call Wes Palm Phone #: ###-#### Inspection requested via web by Wes palm//architect provided clarification on handrails and guard//need CDHD approval for final//Temp ok until CDHD complete//
|
BLD-Final | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | NR |
Tell Riley
|
|
|
Please call Wes Palm at ###-#### Phone #: ###-#### Inspection requested via web by Wes palm/used as conference/walk through//need information from architect regard the guardrail at the back of building and one side of handrail at stairs 34" and other side 36"//
|
PubWorks Occupancy Approval | 6/22/2020 | 6/22/2020 | 6/22/2020 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Please Call Wes @ ###-#### Phone #: ###-#### Inspection requested via web by Wes palm
|
PubWorks Occupancy Approval | 6/18/2020 | 6/18/2020 | 6/18/2020 | | DONE |
Mike Sheppard
|
|
|
|
Zoning Approval | 6/16/2020 | 6/16/2020 | 6/16/2020 | | PASS |
Katelyn Menuge
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/8/2020 | | DONE |
|
|
|
|
Meeting | | | 5/29/2020 | | DONE |
|
|
|
ACHD inspection approval see DOC
|
Plan assigned to (Joe) | 5/12/2020 | 5/12/2020 | 5/26/2020 | | DONE |
Joe Bruce
|
|
|
this activity was missed therefor it was added on 5/26/2020- Joe has already passed plan mod- JCA
|
CHANGE STATUS TO (RDY) | | | 5/26/2020 | | DONE |
|
|
|
the plan mod activity was missed when the plan mod was received. This was added on 5/26/20 per Brittany and added by Judith
|
OVERRIDE | | | 5/21/2020 | | |
|
|
|
|
Plan assigned to (Joe) | 5/12/2020 | 5/12/2020 | 5/21/2020 | | PASS |
Joe Bruce
|
|
|
(Andrade's - Plan Mod) Change dorr 101F hardware so it is an oprable decorative window
|
Routing - PLAN CHECK | 5/20/2020 | | 5/21/2020 | | PASS |
Joe Bruce
|
|
|
Plan Mod Passed. Modification to door 101F with no operable hardware. Not an exit.
|
Permit Ready to Issue | | | 5/21/2020 | | DONE |
|
|
|
DO NOT Iss- plan mod
|
Plan Reviewer's activity | | | 5/13/2020 | | FAIL |
Joe Bruce
|
|
|
Plan Modificaton Prescreen sent back to architect. The Architect's License for Patrick McKeegan has expired and is no longer valid (AR - 1177) as of 5/8/2020. Please have your license re-instated.
|
Intake Approval | | | 5/12/2020 | | PASS |
|
|
|
plan mod #1
|
BLD-Energy code compliance | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | PART |
Tell Riley
|
|
|
Insulation / Cover Inspection at Fire Riser Room Phone #: ###-#### Inspection requested via web by Wes palm//add insulation as discussed//architect provided 1hr detail//light needs to surface mount//door needs to be 1hr per plans, current door is not rated//
|
BLD-Energy code compliance | 3/25/2020 | 3/26/2020 | 3/26/2020 | P | PART |
Tell Riley
|
|
|
Final insulation inspection for cover at attic area. Phone #: ###-#### Inspection requested via web by Wes palm//ok in attic area//
|
BLD-Energy code compliance | 3/23/2020 | 3/24/2020 | 3/24/2020 | A | PART |
Tell Riley
|
|
|
Insulation inspection for cover at tower and bar locations. Phone #: ###-#### Inspection requested via web by Wes palm//tower and bar area ok//
|
BLD-Energy code compliance | 3/19/2020 | 3/20/2020 | 3/20/2020 | P | CANC |
Tell Riley
|
|
|
Partial inspection of insulation for cover at tower and bar area lid. Please call Wes P with any concerns Phone #: ###-#### Inspection requested via web by Wes palm
|
BLD-Wall cover | 3/12/2020 | 3/13/2020 | 3/13/2020 | P | PART |
Tell Riley
|
|
|
Inspection for cover at main floor exterior walls and seating area lid. Phone #: ###-#### Inspection requested via web by Wes palm//ok to cover walls--do not cover fire riser room--need rated assembly documents//ok to cover lid in dining area pending fire sprinkler approval//
|
BLD-Framing/Rough-in | 3/4/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Tell Riley
|
|
|
Please Call Wes with any questions at the number listed above. Phone #: ###-#### call 30 minutes//ok to insulate//a few corrections and interior shear needs verified//
|
BLD-Framing/Rough-in | 3/3/2020 | 3/4/2020 | 3/4/2020 | P | NR |
Tell Riley
|
|
|
Please Call Wes with any questions at the number listed above. Phone #: ###-#### Inspection requested via web by Wes palm//multiple framing corrections, Wes has notes and plans have been marked//will come back 3/4//
|
BLD-Wall Bracing | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | PART |
Tell Riley
|
|
|
RE-INSPECTION for completed Items including noted strapping at windows per details on plans ; noted truss blocking per truss details and plans at strapping required on roof decking. Phone #: ###-#### Inspection requested via web by Wes Harrison//truss blocking installed//strapping installed and nailed per plans// exterior nailing and shear ok//
|
BLD-Wall Bracing | 2/10/2020 | 2/11/2020 | 2/11/2020 | P | CANC |
Tell Riley
|
|
|
RE-INSPECTION for completed Items including noted strapping at windows per details on plans & noted truss blocking per truss details and plans at strapping required on roof decking. Phone #: ###-#### >> Inspection requested via web by Wes Harrison Inspection cancelled from web by: Wes Harrison
|
BLD-Wall Bracing | 2/6/2020 | 2/7/2020 | 2/7/2020 | P | PART |
Tell Riley
|
|
|
Hoping to also have you look at small insulated areas before cover at TPO areas. Phone #: ###-#### Inspection requested via web by Wes palm//flat roof and floor decking ok//ok to insulate upper wall areas to finish exterior sheathing//need to add strapping at windows per details on plans// add truss blocking per truss details and plans at strapping required on roof decking//
|
Print Occupancy Form | | | 2/6/2020 | | DONE |
|
|
|
|
BLD-Concrete | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | PART |
Tell Riley
|
|
|
rebar - slab // Shane Phone #: ###-####//need to add transverse bars//WIP// pending specials//
|
BLD-Energy code compliance | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PART |
Tell Riley
|
|
|
Foundation insulation, late PM if possible. Phone #: ###-#### Inspection requested via web by Michael McHargue//ok per plan//will need to add 2' return under slab per drawings//
|
BLD-Foundation | 11/8/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Tell Riley
|
|
|
Dane Phone #: ###-####//ok pending specials//
|
BLD-Footing | 11/6/2019 | 11/7/2019 | 11/7/2019 | P | PART |
Tell Riley
|
|
|
Dane Phone #: ###-####//ok pending special inspections//
|
OVERRIDE | | | 10/23/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/23/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/23/2019 | | DONE |
|
|
|
|
Telephone call | | | 10/22/2019 | | DONE |
|
|
|
Emailed fees to - mike@prusikbuilt.com
|
OVERRIDE | | | 10/21/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 10/21/2019 | | DONE |
|
|
|
ALL MET- NEED
ACHD
RP
GC FORM
REVISED VALUE
|
Plan assigned to (JHB) | 7/16/2019 | 7/18/2019 | 10/18/2019 | | PASS |
Joe Bruce
|
|
|
10/25 (3rd Rev) 08/26 - 502 Andrade's Restaurant
|
Routing PW Street Lights | 10/18/2019 | | 10/18/2019 | | PASS |
Tom Marshall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2019 | | DONE |
|
|
|
|
Routing PW Street Lights | 10/11/2019 | | 10/14/2019 | | FAIL |
Tom Marshall
|
|
|
|
Plan resubmittals requested | | | 10/14/2019 | | DONE |
Joe Bruce
|
|
|
Still waiting for PW Streetlights approval
|
Routing Off Site - STRUCTURAL | 10/4/2019 | | 10/11/2019 | | PASS |
Joe Bruce
|
|
|
kpff
|
Routing - FIRE | 10/4/2019 | 10/4/2019 | 10/10/2019 | | PASS |
Mark Stumbaugh
|
|
|
10/11 (resub) Andrade's Restaurant, ePlan
|
Routing - PLANNING | 10/4/2019 | | 10/9/2019 | | PASS |
David Moser
|
|
|
See DRH19-00057
|
Routing - PLAN CHECK | 10/4/2019 | | 10/8/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing PW Solid Waste | 10/4/2019 | | 10/8/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Street Lights | 10/4/2019 | | 10/7/2019 | | FAIL |
Tom Marshall
|
|
|
|
Routing - Erosion and Sediment | 10/4/2019 | | 10/7/2019 | | PASS |
Michael Zawacki
|
|
|
ESC narrative provided.
RP needed, commercial project requires site prep inspection.
|
Routing PW Drainage | 10/4/2019 | | 10/4/2019 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 10/4/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - Design Review | 10/4/2019 | | 10/4/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Route to Impact Fee Review | 8/27/2019 | 8/30/2019 | 8/28/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 8/27/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 8/27/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 7/16/2019 | | 8/27/2019 | | FAIL |
Joe Bruce
|
|
|
See Plan Review Report in the "Agency Comments" folder for corrections requiring a resubmittal. **JHB**
|
Routing - FIRE | 7/16/2019 | 7/18/2019 | 8/26/2019 | | FAIL |
Mark Scharfen
|
|
|
08/26 - 502 Andrade's Restaurant fire review complete. Uploaded and emailed to architecht rev_fire 08.26.2019.pdf.
|
Routing Off Site - STRUCTURAL | 7/16/2019 | | 8/1/2019 | | FAIL |
Joe Bruce
|
|
|
KPFF - Corrections Required
|
Routing Off Site - C.D.H | 7/18/2019 | | 7/25/2019 | | PASS |
Joe Bruce
|
|
|
CDHD
|
Routing - MECHANICAL | 7/16/2019 | | 7/24/2019 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 7/16/2019 | | 7/22/2019 | | FAIL |
Katelyn Menuge
|
|
|
Need to complete ROS to create legal parcel prior to building permit issuance.
|
Routing PW Environmental | 7/18/2019 | | 7/22/2019 | | PASS |
Rick Christenson
|
|
|
Exterior Grease Interceptor 1500 gallon.
|
Routing PW Solid Waste | 7/18/2019 | | 7/19/2019 | | FAIL |
Evan Carpenter
|
|
|
The solid waste enclosure must have at least 12 feet of unobstructed clearance between gate posts, as measured from the innermost points (not the exterior dimensions), and a depth of at least 12 feet. The current effective gate clearance is approximately 9 feet.
|
Routing - PLANNING | 7/16/2019 | | 7/19/2019 | | FAIL |
Karla Nelson
|
|
|
The applicant needs to provide proof of legal parcel and cross access agreements.
|
Routing - Addressing | 7/16/2019 | | 7/19/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/16/2019 | | 7/18/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 7/16/2019 | | 7/18/2019 | | FAIL |
Michael Zawacki
|
|
|
Please provide ESC narrative.
|
Routing - PLUMBING | 7/16/2019 | | 7/18/2019 | | PASS |
Daryl Spivey
|
|
|
See redline remarks and per plan and ISPC
|
Routing PW Street Lights | 7/18/2019 | | 7/18/2019 | | FAIL |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 7/18/2019 | | 7/18/2019 | | PASS |
DeAnn Brown
|
|
|
Sewer connection shown in corresponding grading permit GRD19-00047.
|
Intake Approval | | | 7/16/2019 | | PASS |
Julie Romig
|
|
|
|
Plan Reviewer's activity | | | 7/12/2019 | | DONE |
|
|
|
Prescreen approved without Legal Lot and Parcel approval (need record of survey to establish legal parcels), per ANT/JGW and Jason Blais. Hold Harmless letter attached in ePlan.
|
Intake Approval | | | 6/28/2019 | | FAIL |
Julie Romig
|
|
|
1. Form 211 approved and signed by subdivision planner.
|
Application received | | | 6/27/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2019 8:52AM
|
Second Notice | | 8/21/2020 | | | |
|
|
|
|
Routing PW Drainage | 7/18/2019 | | | | FAIL |
Brian Murphy
|
|
|
NEED DRAINAGE APPROVAL
|