General Inspection | 7/30/2020 | 7/30/2020 | 7/30/2020 | | PEND |
Andy J. Long
|
|
|
work on other project still in progress. No changes at this site. No complaints or issues at this time
|
General Inspection | 6/29/2020 | 6/29/2020 | 6/29/2020 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/28/2020 | 5/28/2020 | 5/28/2020 | | PASS |
Andy J. Long
|
|
|
WIP on house in same neighborhood by permittee. Lot appears to being used as a temporary staging area for that project. Permit will need to be closed when other project is complete.
|
General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 | | PASS |
Andy J. Long
|
|
|
Building material and supplies still stored on site. Builder still working on a home in the subdivsion. No trackout or discharges.No requests at this time.
|
General Inspection | 3/26/2020 | 3/26/2020 | 3/26/2020 | | PASS |
Andy J. Long
|
|
|
No construction activity
|
General Inspection | 2/24/2020 | 2/24/2020 | 2/25/2020 | | PASS |
Andy J. Long
|
|
|
Site being used for staging still. No trackout or runoff issues
|
General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | | PASS |
Andy J. Long
|
|
|
No new activity. Some equipment staged here. House by same contractor is sub is still active.
|
General Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 | | PASS |
Andy J. Long
|
|
|
No new activity. Parcel owner still building home in subdivsion. Some material is staged there. No ESC requests. Will continue to monitor.
|
General Inspection | 10/21/2019 | 10/21/2019 | 10/21/2019 | | PEND |
Andy J. Long
|
|
|
no new activity
|
General Inspection | 9/20/2019 | 9/20/2019 | 9/23/2019 | | PASS |
Andy J. Long
|
|
|
No recent activity
|
General Inspection | 8/20/2019 | 8/20/2019 | 8/20/2019 | | PASS |
Andy J. Long
|
|
|
No activity. GC still building home in subdivision, will follow up when that is complete. No corrections needed at this time
|
General Inspection | 7/19/2019 | 7/19/2019 | 7/19/2019 | | PASS |
Andy J. Long
|
|
|
No new activity. Chain link fence removed from site. No issues.
|
General Inspection | 6/17/2019 | 6/18/2019 | 6/20/2019 | A | PASS |
Andy J. Long
|
|
|
No trackout or discahrges. Permit sign posted. Some earthwork on stockpiles has recently occured. No foundation excavation. SIlt fence installed to protect open irrigation ditch.
|
General Inspection | 6/7/2019 | 6/7/2019 | 6/10/2019 | | PASS |
Andy J. Long
|
|
|
No acitiviity, site being used for staging construction equipment and materials. Silt fence installed to protect irrigation ditch.
|
General Inspection | 5/7/2019 | 5/7/2019 | 5/8/2019 | | PASS |
Andy J. Long
|
|
|
No activity. Lot being used for staging trailers and stockpiles. Silt fence installed along north boundary to protect open irrigation ditch.
|
General Inspection | 4/4/2019 | 4/4/2019 | 4/4/2019 | | PASS |
Andy J. Long
|
|
|
No new activity. Some dirt stockpile and trailer of forms stored here. Silt fence protecting irrigation ditch is installed. Site fenced and has rock entrance.
|
General Inspection | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Andy J. Long
|
|
|
No new work. Permit is posted on fence, silt fence installed to contain stockpiles stored on lot, there is a irrgation lateral behind fence. Construction entrance installed. No SFH permit package submitted yet. No corrections
|
General Inspection | 8/1/2018 | 8/1/2018 | 8/1/2018 | A | PASS |
Andy J. Long
|
|
|
No recent activity. Permit sign posted and site has chain link fencing. Contaminated dirt has been removed from site, no odor detected at time of inspection - will verify with IDEQ.
|
General Inspection | 5/31/2018 | 5/31/2018 | 6/1/2018 | P | PASS |
Andy J. Long
|
|
|
Stockpiles of contaminated dirt were removed. Follow up testing by MTI resulted in additional 1 foot excavation of dirt on surface being scraped. This surface dirt is now in a covered stockpile and will be hauled off next week.
Permit sign posted, construction entrance rock installed. No trackout.
Paperwork and soil testing submitted to DEQ.
|
General Inspection | 5/24/2018 | 5/24/2018 | 5/25/2018 | P | PEND |
Andy J. Long
|
|
|
follow up on dirt removal
Dirt has been removed and lot scraped. No new dirt added yet. ESC permit sign now posted. Site entrance has been enclosed with fencing. No longer smelling the oil/fuel smell as before. Case pending with DEQ . Will continue to monitor.
|
General Inspection | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | PEND |
Andy J. Long
|
|
|
Dirt stockpile removal in progress. Will request that top layer remaining after stockpiles are removed.
|
General Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PEND |
Andy J. Long
|
|
|
Soil test results received. Hauling contractor will begin stockpile removal tomorrow AM. Request to over excvate top layer and clean out soil placed in former basement depression.
Followed with DEQ Waste & Remediation on protocol for removal. DEQ inspector is also working with contractor.
|
Issue & PRINT permit SFD | | | 5/21/2018 | | DONE |
|
|
|
|
Application received | | | 5/18/2018 | | |
|
|
|
|
Routing - Erosion and Sediment | 5/18/2018 | | 5/18/2018 | | DONE |
Andy J. Long
|
|
|
Double permit fee for working without permit. Special investigation fee for investigation activities conducted on 5/17/2018 to find source of the contaminated soil dumped.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 5/18/2018 | | DONE |
|
|
|
|