Site Final | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Andy J. Long
|
|
|
Phase I complete. All lots are now occupied by stabilized SFHs. DI bags to remain installed for Bonneville Phase 2, site inspected under ESC17-01369.
ESC permit finaled.
|
General Inspection | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 | | PASS |
Michael Zawacki
|
|
|
Site prepped for road, curb, and gutters. No workers on site.Site has no issues, no trackout leaving site.
|
General Inspection | 2/9/2018 | 2/9/2018 | 2/9/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/25/2017 | 12/25/2017 | 12/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Michael Zawacki
|
|
|
Most homes complete. Still some building going on. Builders are keeping trash onsite.
|
Random Inspection | 10/31/2017 | 10/31/2017 | 10/31/2017 | P | PASS |
Michael Zawacki
|
|
|
WIP on sewer and water lines
|
General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Michael Zawacki
|
|
|
Syman is handling inspections, last did 10-9. There are issues with trackout and the entrance, looks like people are going around. I sent a message to RP to fix situation. All dirt is contained to site, no dust visible. Currently they are installing sewer lines.
|
General Inspection | 8/22/2017 | 8/24/2017 | 8/25/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/21/2017 | 8/21/2017 | 8/22/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/6/2017 | 7/6/2017 | 7/6/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP on SFH. A minimal amount of trackout is occurring, the trash is contained, no dust issued observed. DI bags ok. No corrections issued.
RP has moved concrete washout from the street to a flat dirt lot area at the end of wagons west st.
|
General Inspection | 6/6/2017 | 6/6/2017 | 6/6/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP on SFHs. Trash is contained. Concrete washout not on site at time of inspection. Irrigation work in progress. No corrections.
|
General Inspection | 4/18/2017 | 4/18/2017 | 4/18/2017 | P | PASS |
Melissa Jannusch
|
|
|
Raining at time of inspection. DI protections are okay not backing up. Trackout is under control. Trash is contained. Concrete washout will need maintenance after this rain event. Reminded RP to check is this is a greater than 0.25” rain event and if so to do the SWPPP inspection.
|
General Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 | A | PASS |
Melissa Jannusch
|
|
|
No WIP today due to rainy conditions. No trackout. DI bags ok. Concrete washout in use. No corrections.
|
General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 | | PASS |
Melissa Jannusch
|
|
|
Some track out. Talked with RP last Friday during a site preparation inspection. He has a sweeper scheduled for this week. okay
|
General Inspection | 1/24/2017 | 1/24/2017 | 1/27/2017 | | PASS |
Melissa Jannusch
|
|
|
No WIP. Snow covered conditions. Some stock piles located on site.
|
General Inspection | 12/9/2016 | 12/9/2016 | 12/13/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 | A | PASS |
Andy J. Long
|
|
|
WIP on subdivsion road, curb, and gutter construction at Bonneville Pointe sub. No significant trackout to Columbia, no fugitive dust. Permit and SWPPP posted. Clearing limits and surronding vegetation preserved. Permit singn and SWPPP info posted at west entrance.
|
General Inspection | 10/20/2016 | 10/21/2016 | 10/24/2016 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled 10/21
|
Complaint Inspection | 8/25/2016 | 8/25/2016 | 8/25/2016 | P | FAIL |
Evan Jenkins
|
|
|
Visually seen "some" dust blowing around. Contacted RP Jill Jenkins to get the water truck that's onsite spraying asap, and all day long. Also talked to a contractor onsite to keep water truck spraying. Will follow up tomorrow
|
General Inspection | 8/4/2016 | 8/4/2016 | 8/5/2016 | P | PASS |
Andy J. Long
|
|
|
Work has resumed at Bonneville. No trackout, site is graded below road level and surrounding vegetation has been preserved. Very flat site. Road bases are being prepped. Water truck on site for dust control. Approved.
|
Random Inspection | 6/15/2016 | 6/15/2016 | 6/15/2016 | P | PASS |
Andy J. Long
|
|
|
No activity. BMPs installed, Water truck on site for when site is back in action. Will need some temporary or permanent stabilization once roads and infrastructure are installed. High wind area.
|
General Inspection | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Andy J. Long
|
|
|
Bonneville subdivsion phase currently inactive. Permt posted and SWPPP info onsite. Construction entrance installed, limited infrastructure in area.
No windblown fugitive dust, but will need to stabilize tacify if inactive for more than 2 weeks. Will notify RP, no immediate corrections requeted.
|
Random Inspection | 4/21/2016 | 4/21/2016 | 4/21/2016 | P | PASS |
Andy J. Long
|
|
|
Rough grading and grubbig in progress at Bonneville. Water truck on site being used to control fugitve dust. Construction entrance preventing trackout.
Approved.
|
Site Preparation | 4/15/2016 | 4/18/2016 | 4/18/2016 | A | PASS |
Andy J. Long
|
|
|
After 10 // Jill Phone #: ###-####
New subdivision development in Columbia. Flat site, desert locale.
Construction entrance is installed & SWPPP infor and permit posted.
Flat site, no perimeter BMPs - will preserve vegetation around clearing limits. No dewatering anticipated. Will need to use dust control when grubbing/grading
Approved.
|
Complaint Inspection | 8/30/2017 | 9/6/2017 | | P | |
Andy J. Long
|
|
|
messy , no SFH housekeeping or clean up
|