Permit Information
Permit NumberESC16-00439
StatusFinaled
Name JILL JENKINS
Site Address 7000 E COLUMBIA RD
Project NameBONNEVILLE #1
Customer Number 
ePlanReviewNo
Description
New Subdivision w/ site development and infrastructure.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/2/20185/2/20185/2/2018PPASS
DetailsAndy J. Long
Phase I complete. All lots are now occupied by stabilized SFHs. DI bags to remain installed for Bonneville Phase 2, site inspected under ESC17-01369.

ESC permit finaled.
General Inspection4/6/20184/6/20184/6/2018PPASS
DetailsAndy J. Long
General Inspection3/27/20183/27/20183/27/2018 PASS
DetailsMichael Zawacki
Site prepped for road, curb, and gutters. No workers on site.Site has no issues, no trackout leaving site.
General Inspection2/9/20182/9/20182/9/2018 CANC
DetailsAndy J. Long
General Inspection12/25/201712/25/201712/26/2017 CANC
DetailsAndy J. Long
General Inspection11/8/201711/8/201711/8/2017PPASS
DetailsMichael Zawacki
Most homes complete. Still some building going on. Builders are keeping trash onsite.
Random Inspection10/31/201710/31/201710/31/2017PPASS
DetailsMichael Zawacki
WIP on sewer and water lines
General Inspection10/12/201710/12/201710/12/2017PPASS
DetailsMichael Zawacki
Syman is handling inspections, last did 10-9. There are issues with trackout and the entrance, looks like people are going around. I sent a message to RP to fix situation. All dirt is contained to site, no dust visible. Currently they are installing sewer lines.
General Inspection8/22/20178/24/20178/25/2017PCANC
DetailsAndy J. Long
General Inspection8/21/20178/21/20178/22/2017 CANC
DetailsAndy J. Long
General Inspection7/6/20177/6/20177/6/2017PPASS
DetailsMelissa Jannusch
WIP on SFH. A minimal amount of trackout is occurring, the trash is contained, no dust issued observed. DI bags ok. No corrections issued.

RP has moved concrete washout from the street to a flat dirt lot area at the end of wagons west st.
General Inspection6/6/20176/6/20176/6/2017 PASS
DetailsMelissa Jannusch
WIP on SFHs. Trash is contained. Concrete washout not on site at time of inspection. Irrigation work in progress. No corrections.
General Inspection4/18/20174/18/20174/18/2017PPASS
DetailsMelissa Jannusch
Raining at time of inspection. DI protections are okay not backing up. Trackout is under control. Trash is contained. Concrete washout will need maintenance after this rain event. Reminded RP to check is this is a greater than 0.25” rain event and if so to do the SWPPP inspection.
General Inspection3/30/20173/30/20173/30/2017APASS
DetailsMelissa Jannusch
No WIP today due to rainy conditions. No trackout. DI bags ok. Concrete washout in use. No corrections.
General Inspection3/13/20173/13/20173/13/2017 PASS
DetailsMelissa Jannusch
Some track out. Talked with RP last Friday during a site preparation inspection. He has a sweeper scheduled for this week. okay
General Inspection1/24/20171/24/20171/27/2017 PASS
DetailsMelissa Jannusch
No WIP. Snow covered conditions. Some stock piles located on site.
General Inspection12/9/201612/9/201612/13/2016 CANC
DetailsAndy J. Long
General Inspection10/24/201610/24/201610/24/2016APASS
DetailsAndy J. Long
WIP on subdivsion road, curb, and gutter construction at Bonneville Pointe sub. No significant trackout to Columbia, no fugitive dust. Permit and SWPPP posted. Clearing limits and surronding vegetation preserved. Permit singn and SWPPP info posted at west entrance.
General Inspection10/20/201610/21/201610/24/2016ACANC
DetailsAndy J. Long
General Inspection10/20/201610/20/201610/20/2016 CANC
DetailsAndy J. Long
rescheduled 10/21
Complaint Inspection8/25/20168/25/20168/25/2016PFAIL
DetailsEvan Jenkins
Visually seen "some" dust blowing around. Contacted RP Jill Jenkins to get the water truck that's onsite spraying asap, and all day long. Also talked to a contractor onsite to keep water truck spraying.
Will follow up tomorrow
General Inspection8/4/20168/4/20168/5/2016PPASS
DetailsAndy J. Long
Work has resumed at Bonneville. No trackout, site is graded below road level and surrounding vegetation has been preserved. Very flat site. Road bases are being prepped. Water truck on site for dust control. Approved.
Random Inspection6/15/20166/15/20166/15/2016PPASS
DetailsAndy J. Long
No activity. BMPs installed, Water truck on site for when site is back in action. Will need some temporary or permanent stabilization once roads and infrastructure are installed. High wind area.
General Inspection5/26/20165/26/20165/26/2016PPASS
DetailsAndy J. Long
Bonneville subdivsion phase currently inactive. Permt posted and SWPPP info onsite. Construction entrance installed, limited infrastructure in area.

No windblown fugitive dust, but will need to stabilize tacify if inactive for more than 2 weeks. Will notify RP, no immediate corrections requeted.
Random Inspection4/21/20164/21/20164/21/2016PPASS
DetailsAndy J. Long
Rough grading and grubbig in progress at Bonneville. Water truck on site being used to control fugitve dust. Construction entrance preventing trackout.

Approved.
Site Preparation4/15/20164/18/20164/18/2016APASS
DetailsAndy J. Long
After 10 // Jill Phone #: ###-####

New subdivision development in Columbia. Flat site, desert locale.

Construction entrance is installed & SWPPP infor and permit posted.

Flat site, no perimeter BMPs - will preserve vegetation around clearing limits. No dewatering anticipated. Will need to use dust control when grubbing/grading

Approved.
Complaint Inspection8/30/20179/6/2017 P 
DetailsAndy J. Long
messy , no SFH housekeeping or clean up