Permit Information
Permit NumberESC16-01213
StatusFinaled
Name HERB DALRYMPLE
Site Address 350 S ALLUMBAUGH WAY
Project NameGrace Memory Care
Customer Number 
ePlanReviewNo
Description
(GRACE MEMORY CARE @ ENGLEFIELD GREEN) For the construction of a 43,986 sq. ft. memory care facility with 50 units with work to include..
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/16/201710/30/201710/30/2017ADONE
DetailsAndy J. Long
If DI bags still in, issue re-inspection fee.

DI bag removed; permit finaled.
Site Final10/23/201710/24/201710/27/2017PPASS
DetailsAndy J. Long
All private and MS4 on east side of Allumbaugh have had the temporary DI filter bags removed.

All areas stabilized, staging areas clean and building is occupied. Approved
Conference10/13/201710/16/201710/16/2017PDONE
DetailsAndy J. Long
tell Herb to get DI bags

sent email and left VM. Will check back in 2 weeks. If no action, issue re-inspection fee.
Site Final10/10/201710/13/201710/13/2017PFAIL
DetailsAndy J. Long
NO removal of temporary DI sediment bags as requested. All work complete, no construction materials or activity at site.
General Inspection10/6/201710/6/201710/10/2017 CANC
DetailsAndy J. Long
Site Final9/18/20179/21/20179/21/2017PNR
DetailsAndy J. Long
Project near completion. All disturbed areas stabilized/landscaped.

Correction request:
- remove 4 DI bags installed ( 3 onsite, one on east side of Allumbaugh)

Verbal correction to RP Herb, he will schedule once complete.
General Inspection9/14/20179/14/20179/19/2017 CANC
DetailsAndy J. Long
General Inspection8/30/20178/30/20178/31/2017 PASS
DetailsAndy J. Long
General Inspection8/15/20178/15/20178/16/2017 CANC
DetailsAndy J. Long
General Inspection7/31/20177/31/20178/1/2017 CANC
DetailsAndy J. Long
General Inspection7/14/20177/14/20177/14/2017 PASS
DetailsMelissa Jannusch
WIP on curbs. Parking lot is paved. Project nearing completion. Trash contained. No corrections issued.
General Inspection6/29/20176/29/20176/30/2017 CANC
DetailsAndy J. Long
General Inspection6/14/20176/14/20176/14/2017 CANC
DetailsAndy J. Long
General Inspection5/30/20175/30/20175/30/2017 CANC
DetailsAndy J. Long
General Inspection5/12/20175/12/20175/15/2017 CANC
DetailsAndy J. Long
General Inspection4/20/20174/20/20174/20/2017 FAIL
DetailsMelissa Jannusch
Fix construction entrance. Gravel parking area for workers. Clean up trackout. Talked with RP requesting corrections. Follow up scheduled for Tuesday.
General Inspection3/17/20173/22/20173/21/2017PFAIL
DetailsMelissa Jannusch
Trackout. Scheduled a tracking control inspection for next week.
Complaint Inspection3/17/20173/17/20173/17/2017PPASS
DetailsMelissa Jannusch
Met with RP (Herb) on site and discussed BMPs, correction requests, and site preparation scheduling. SWPPP was avalible and inspection are up to date. Corrections requested: sweep parking lot and road, reinstall construction entrance, preform maintenance on concrete washout.
Tracking Control3/21/20173/28/2017 P 
DetailsMelissa Jannusch