Permit Information
Permit NumberESC17-00027
StatusFinaled
Name MIKE TAYLOR
Site Address 3194 S COLE RD
Project NameBoise Maverik Victory & Cole
Customer Number 
ePlanReviewNo
Description
16115 Boise Maverik Victory & Cole #565 Gas Station and Fuel Pumps.
Site preparation inspection required before construction begins Call 608-7070. Plans looks ok. BMPs: 25’x20’ construction entrance on Cole rd, and Victory, Perimeter silt fence on all sides but Sorensen dr, inlet protection, concrete washout. RP needs to be specified. The plan designer is out of state and not a valid City of Boise PD. Okay, but PD should get certification if continuing to design ESC plans in Boise.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final9/5/20189/26/20189/25/2018ACANC
DetailsAndy J. Long
site final already complete
Site Final9/6/20189/7/20189/7/2018APASS
DetailsAndy J. Long
all temp BMPS are reportedly removed.

Confimed that all ESC temp BMPs (DI bags, silt fence) have been removed. No further ESC request, ESC permit finaled.
Site Final9/5/20189/5/20189/5/2018PFAIL
DetailsAndy J. Long
No temporary BMPs removed as requested.

Next failed Site Final will result in fines. Notified RP. Will check back in 3 weeks.

Remove DI bags and silt fence.
Site Final8/20/20188/21/20188/21/2018AFAIL
DetailsAndy J. Long
Need to remove temporary BMPs installed during project.

- 3 DI bags (one on Cole @ Victory, and two on Victory at east entrance and installed at Beverly during a day of bad trackout_
- Silt fence south of site along Cole Road should be removed.

Verbal correction to RP Mike Taylor
Site Final8/2/20188/3/20188/3/2018ACANC
DetailsAndy J. Long
Site Final7/27/20187/31/20188/2/2018ACANC
DetailsAndy J. Long
General Inspection7/27/20187/27/20187/27/2018 CANC
DetailsAndy J. Long
General Inspection6/11/20186/11/20186/11/2018 FAIL
DetailsAndy J. Long
Temporary BMPs left on site (DI bags, silt fence)
Site Final4/26/20184/26/20184/26/2018PNR
DetailsMichael Zawacki
Parcel has been split. South west is seperate parcel and not stabalized. Sout east is still part of Maverick parcel and is exposed with nothing in place for stabalization. Will not final permit until area is stabalized.
General Inspection4/4/20184/4/20184/4/2018PPASS
DetailsMichael Zawacki
Gas station complete and open. Parcel on south is still exposed.
General Inspection3/19/20183/19/20183/19/2018PPASS
DetailsMichael Zawacki
Lot is now paved, store scheduled to open the 22nd. Landscapers on site doing final prep.
Tracking Control3/1/20183/2/20183/2/2018APASS
DetailsAndy J. Long
New construction entrance installed. Crews cleaning up access to site on south side.

Road was also swept. Site back in compliance.

Will need to thoroughly sweep gutters on Cole and Victory as well as sidewalk on Victory.
Complaint Inspection2/28/20182/28/20183/1/2018PFAIL
DetailsAndy J. Long
excessive trackout reported 2/28

Significant activity on site, lots of earthwork and hauling in and out occuring with dump trucks and concrete trucks.

Construction entrance for main site access covered in mud. No mainteance or rock added to prevent trackout. Extends out to Cole Road to Victory. Did not see a sweeper unit on site.

Perimeter silt fence installed, receiving storm drains have sediment protection.

Corrections:

Install construction entrance or track pad. Alternatively clean tires.
Random Inspection2/26/20182/26/20182/26/2018PPASS
DetailsAndy J. Long
No trackout from site. Access to Victory is blocked off. Perimeter controls and sediment protection on MS4 inlets is installed.
Tracking Control1/24/20181/25/20181/25/2018APART
DetailsMichael Zawacki
Sorensen and paved part of entrance have been swept. Talked to RP, sweeper is scheduled for Wednesday nights and as needed.
Apron onto Victory still needs to be swept, road is free from trackout. Eastern uphill DI needs protection to catch any mud tracked up with flow of traffic.
Tracking Control1/22/20181/22/20181/24/2018PCANC
DetailsAndy J. Long
Tracking Control1/24/20181/24/20181/24/2018PFAIL
DetailsAndy J. Long
Complaint about trackout.

Significant trackout from south site acces to Sorenson extending to Cole. Mud and dirt from site visible on sidewalk and gutter on Victory due to trackout from the north access.

Correction request 24 hour compliance time
1. Sweep Sorenson and Victory sidewalk and gutter at entrance
2. Improve and maintain both construction entrances.
3. Install DI protection on Victory 100 M east of site access

Verbal corrections issued to project manager Rodger
General Inspection1/11/20181/18/20181/18/2018PPEND
DetailsMichael Zawacki
Some trackout making it to Cole. Talked to Rodger and he will get it swept. Construction entrance in place, trying to keep nonessential vehicles off site.
Tracking Control1/11/20181/11/20181/11/2018APASS
DetailsAndy J. Long
Roger returned call 1/8 PM after correction, stated would install construction rock entrance and have workers park on street.

Follow up inspection.

corrections completed after first request:
- sweeping on Sorenson
- new rock construction entrance inside of paved site entrance

Site walk through:
- site is basin shaped, retain most stormwater and is extremely muddy within site.
- silt fence perimeter controls are in good condition
- DI bag installed on MS4 on Victory and is filtering runoff
- some minor trackout to Victory, very wet conditions. Roger states access has been restricted to the south entrance off Sorenson.

No muddy discharges to Cole, sheet flow on Sorenson flows back into site, no MS4 connection yet.

After conditions dry:
- sweep surrounding roads
- conduct maintenance on DI bag on Victory.
Tracking Control1/8/20181/8/20181/8/2018PFAIL
DetailsAndy J. Long
Maintenance needed on construction entrances. Access through site is extremely muddy.

Trackout getting worse on south side of site to Sorenson.

VM left with Roger (super-intendant). Follow up scheduled for tomorrow morning.
General Inspection11/27/201711/27/201711/27/2017APASS
DetailsMichael Zawacki
No trackout leaving site. Perimeter BMPs intact. Digging seepage beds, no groundwater.
General Inspection10/2/201710/18/201710/19/2017PPASS
DetailsMichael Zawacki
call Roger to meet on site for inspection
Met RP on site. No trackout or fugitive dust. Site is clean, disturbed areas have been tracked. Washout pan in place and being used.
Site Preparation9/29/201710/2/201710/2/2017APASS
DetailsAndy J. Long
Initial BMPs installed. Permits now in "Issue" status. Work has resumed, no trackout at time of inspection. Permit sign posted on Victory
Site Preparation9/29/20179/29/20179/29/2017PCANC
DetailsAndy J. Long
Roger Phone #: ###-####

rescheduled for monday