Site Final | 10/4/2018 | 10/4/2018 | 10/8/2018 | P | PASS |
Michael Zawacki
|
|
|
Does not have coverage, BMPs are being used in place. OK to close permit, will still need to be monitored.
|
General Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 9/19/2018 | 9/19/2018 | 9/19/2018 | | PASS |
Michael Zawacki
|
|
|
Regrowth in progress.
|
General Inspection | 9/4/2018 | 9/4/2018 | 9/4/2018 | | PASS |
Michael Zawacki
|
|
|
Stabalized, will monitor for growth.
|
General Inspection | 8/20/2018 | 8/20/2018 | 8/20/2018 | | PASS |
Michael Zawacki
|
|
|
Construction complete, waiting for stabalization.
|
General Inspection | 8/3/2018 | 8/3/2018 | 8/3/2018 | | PASS |
Michael Zawacki
|
|
|
Waiting for stabalization.
|
General Inspection | 7/19/2018 | 7/19/2018 | 7/19/2018 | | PASS |
Michael Zawacki
|
|
|
Work is about complete. Area will need to be seeded in fall.
|
General Inspection | 7/4/2018 | 7/4/2018 | 7/6/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 | | PASS |
Michael Zawacki
|
|
|
Home work complete. Grass has been planted and stabalization in progress. No ESC issues on site, everythin contained.
|
General Inspection | 6/1/2018 | 6/1/2018 | 6/1/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 | P | PASS |
Michael Zawacki
|
|
|
Pavement Specialties on site to pave driveway. Hillside is in good condition, BMPs are in place.
|
General Inspection | 5/4/2018 | 5/4/2018 | 5/4/2018 | | PASS |
Michael Zawacki
|
|
|
Some vegetation starting to grow on hillside. BMPs in place, no runoff issues or dust. Bobcat is leaking oil.
|
General Inspection | 4/19/2018 | 4/19/2018 | 4/19/2018 | | PASS |
Michael Zawacki
|
|
|
BMPs were cleaned up. No runoff from past storms. Some blowing dust during wind gusts.
|
General Inspection | 4/4/2018 | 4/4/2018 | 4/5/2018 | | PASS |
Michael Zawacki
|
|
|
Some rills starting to form on site, no dirt is being transported off site. Lower wattles are starting to get build up of dirt on high side and will need to be dug out.
|
General Inspection | 3/20/2018 | 3/20/2018 | 3/21/2018 | | PASS |
Michael Zawacki
|
|
|
Hillside BMPs in place. No issues on site.
|
General Inspection | 3/5/2018 | 3/5/2018 | 3/5/2018 | | PASS |
Michael Zawacki
|
|
|
BMPs in place and in good shape. Owner is currently on site and monitors project.
|
General Inspection | 2/9/2018 | 2/16/2018 | 2/16/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP. Hill side BMPs in place. Water etention on site.
|
General Inspection | 2/8/2018 | 2/8/2018 | 2/9/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/22/2018 | 1/22/2018 | 1/22/2018 | | PASS |
Michael Zawacki
|
|
|
Storm water retention on site. Wattle and hydroseeding keeping hillsides stable. Workers parked on site, may cause trackout when they leave.
|
General Inspection | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP on home and shop. Area has wattles and tackifier. Framers are keeping site clean.
|
General Inspection | 12/22/2017 | 12/22/2017 | 12/22/2017 | | PASS |
Michael Zawacki
|
|
|
Exposed hillsides have been sprayed with tackifier and wattle was place. No issues with runoff or trackout.
|
General Inspection | 12/1/2017 | 12/1/2017 | 12/1/2017 | | PASS |
Michael Zawacki
|
|
|
Talked to owner, hopes to be stabalized in next few weeks. No runoff or trackout.
|
General Inspection | 11/16/2017 | 11/16/2017 | 11/16/2017 | | PASS |
Michael Zawacki
|
|
|
Rill forming on southern hill. Concrete contractor will build a berm above to try to prevent any more runoff. Will monitor.
|
General Inspection | 10/11/2017 | 10/18/2017 | 10/23/2017 | A | PASS |
Michael Zawacki
|
|
|
Want to see BMPs implemented
|
General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 | P | PEND |
Michael Zawacki
|
|
|
Trackout down drive and to Pierce Park Rd. No stabalized entrance. No washout, concrete was washed onto hill and ran down lot. Large pile of loose dirt, dust may be issue in future. No perimeter controls but natural buffer exist.
|
General Inspection | 6/23/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Melissa Jannusch
|
|
|
Project underway. Stockpile. Project is in vegetated area. No ESC issues observed
|
Site Preparation | 6/23/2017 | 6/23/2017 | 6/23/2017 | P | PASS |
Andy J. Long
|
|
|
Rusty ###-#### 2 PM
Site walkthrough with RP-GC Rusty.
Site is located up a paved shared driveway off Pierce Park Lane. This is the stabilized entrance.
Perimeter sediment control will be to preserve the existing sagebrush and grass downhill from site. Over 50 meter buffer to street where storm drains are located. Notified RP we may require addition perimeter controls once the construction area has been graded.
Reviewed fugitive dust requirements, site has water available and Rusty stated they will have it ready to spray down dirt.
Will check back in approximately 2 weeks to check on progress and conditions.
|