Permit Information
Permit NumberESC17-00227
StatusFinaled
Name ADAM PISHL
Site Address 7353 N PIERCE PARK LN
Project NamePishl Residenec
Customer Number 
ePlanReviewNo
Description
(GRADING PERMIT - HILLSIDE RESIDENTIAL) To conduct excavation of approximately cubic yards of earth in the site preparation for a future single family dwelling to be constructed under BLD17-00569. RP TBD. Entrance, silt fence, concrete washout, dust control.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/4/201810/4/201810/8/2018PPASS
DetailsMichael Zawacki
Does not have coverage, BMPs are being used in place. OK to close permit, will still need to be monitored.
General Inspection10/4/201810/4/201810/4/2018 CANC
DetailsAndy J. Long
rescheduled for site final
General Inspection9/19/20189/19/20189/19/2018 PASS
DetailsMichael Zawacki
Regrowth in progress.
General Inspection9/4/20189/4/20189/4/2018 PASS
DetailsMichael Zawacki
Stabalized, will monitor for growth.
General Inspection8/20/20188/20/20188/20/2018 PASS
DetailsMichael Zawacki
Construction complete, waiting for stabalization.
General Inspection8/3/20188/3/20188/3/2018 PASS
DetailsMichael Zawacki
Waiting for stabalization.
General Inspection7/19/20187/19/20187/19/2018 PASS
DetailsMichael Zawacki
Work is about complete. Area will need to be seeded in fall.
General Inspection7/4/20187/4/20187/6/2018 CANC
DetailsAndy J. Long
General Inspection6/19/20186/19/20186/19/2018 PASS
DetailsMichael Zawacki
Home work complete. Grass has been planted and stabalization in progress. No ESC issues on site, everythin contained.
General Inspection6/1/20186/1/20186/1/2018 PASS
DetailsAndy J. Long
General Inspection5/17/20185/17/20185/17/2018PPASS
DetailsMichael Zawacki
Pavement Specialties on site to pave driveway. Hillside is in good condition, BMPs are in place.
General Inspection5/4/20185/4/20185/4/2018 PASS
DetailsMichael Zawacki
Some vegetation starting to grow on hillside. BMPs in place, no runoff issues or dust. Bobcat is leaking oil.
General Inspection4/19/20184/19/20184/19/2018 PASS
DetailsMichael Zawacki
BMPs were cleaned up. No runoff from past storms. Some blowing dust during wind gusts.
General Inspection4/4/20184/4/20184/5/2018 PASS
DetailsMichael Zawacki
Some rills starting to form on site, no dirt is being transported off site. Lower wattles are starting to get build up of dirt on high side and will need to be dug out.
General Inspection3/20/20183/20/20183/21/2018 PASS
DetailsMichael Zawacki
Hillside BMPs in place. No issues on site.
General Inspection3/5/20183/5/20183/5/2018 PASS
DetailsMichael Zawacki
BMPs in place and in good shape. Owner is currently on site and monitors project.
General Inspection2/9/20182/16/20182/16/2018PPASS
DetailsMichael Zawacki
WIP. Hill side BMPs in place. Water etention on site.
General Inspection2/8/20182/8/20182/9/2018 CANC
DetailsAndy J. Long
General Inspection1/22/20181/22/20181/22/2018 PASS
DetailsMichael Zawacki
Storm water retention on site. Wattle and hydroseeding keeping hillsides stable. Workers parked on site, may cause trackout when they leave.
General Inspection1/5/20181/5/20181/5/2018PPASS
DetailsMichael Zawacki
WIP on home and shop. Area has wattles and tackifier. Framers are keeping site clean.
General Inspection12/22/201712/22/201712/22/2017 PASS
DetailsMichael Zawacki
Exposed hillsides have been sprayed with tackifier and wattle was place. No issues with runoff or trackout.
General Inspection12/1/201712/1/201712/1/2017 PASS
DetailsMichael Zawacki
Talked to owner, hopes to be stabalized in next few weeks. No runoff or trackout.
General Inspection11/16/201711/16/201711/16/2017 PASS
DetailsMichael Zawacki
Rill forming on southern hill. Concrete contractor will build a berm above to try to prevent any more runoff. Will monitor.
General Inspection10/11/201710/18/201710/23/2017APASS
DetailsMichael Zawacki
Want to see BMPs implemented
General Inspection10/11/201710/11/201710/11/2017PPEND
DetailsMichael Zawacki
Trackout down drive and to Pierce Park Rd. No stabalized entrance. No washout, concrete was washed onto hill and ran down lot. Large pile of loose dirt, dust may be issue in future. No perimeter controls but natural buffer exist.
General Inspection6/23/20177/13/20177/13/2017PPASS
DetailsMelissa Jannusch
Project underway. Stockpile. Project is in vegetated area. No ESC issues observed
Site Preparation6/23/20176/23/20176/23/2017PPASS
DetailsAndy J. Long
Rusty ###-#### 2 PM

Site walkthrough with RP-GC Rusty.

Site is located up a paved shared driveway off Pierce Park Lane. This is the stabilized entrance.

Perimeter sediment control will be to preserve the existing sagebrush and grass downhill from site. Over 50 meter buffer to street where storm drains are located. Notified RP we may require addition perimeter controls once the construction area has been graded.

Reviewed fugitive dust requirements, site has water available and Rusty stated they will have it ready to spray down dirt.

Will check back in approximately 2 weeks to check on progress and conditions.