Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberESC17-00302
StatusFinaled
Name DANIEL APPEL
Site Address 3346 N NORTH MOUNTAIN LN
Project NameAppel-Ritchie Residence
Customer Number 
ePlanReviewNo
Description
Foothills home construction including rock retaining wall and pool. 20% to 45% slope Site perimter at culdesac to have silt fence sediment control installed. Stabilized rock construction entrance to site will be required. Fiber rolls to be installed at along disturbed slopes, preserve existing vegetation as much as possible. Site preparation inspection required, call 608-7070
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/19/201911/19/201911/22/2019PCANC
DetailsMichael Zawacki
DOC - Permit Finaled11/22/201911/22/201911/22/2019PPASS
DetailsMichael Zawacki
Site Final12/17/201812/17/201812/17/2018PDONE
DetailsMichael Zawacki
check for any muddy runoff; site landscaping/stabilization
General Inspection10/2/201810/2/201810/2/2018PPART
DetailsMichael Zawacki
Home looks complete. Lot still needs to be landscaped. Pile of washout and paint or stucco by road.
General Inspection8/17/20188/17/20188/17/2018PPASS
DetailsMichael Zawacki
Exterior work looks completed, still needs landscaping.
General Inspection5/29/20185/29/20185/29/2018PPASS
DetailsMichael Zawacki
post rainfall inspection
No issues on site.
Sand on road is washing down from "The Villa" up hill.
General Inspection5/17/20185/17/20185/17/2018PPART
DetailsMichael Zawacki
post rainfall inspection.
Perimeter wattle installed along bottom of hill. Some dirt in gutter out front, I traced it coming from above, behind "The Villa" gate. No stucco washout, being dumped on hill and running towards road. No hillside rilling.
General Inspection4/3/20184/5/20184/9/2018APART
DetailsAndy J. Long
Perimeter wattles have been re-installed along bottom of slope below home. Street and gutter in front of home were cleaned prior to most recent storm.

Corrections:
- Re-install hillside wattles on west side of home that are damaged/or have mud overtopping them
- smooth out any large rills/channels formed on the slope.
- remove any mud/dirt behind wattles to allow more capacity for next event
- sweep dirt in valley gutter at corner of lot. Some sediment runoff is also coming from driveway up hill from site.
Conference4/2/20184/3/20184/3/2018APASS
DetailsAndy J. Long
RP-GC Dan notified that correction requests were received yesterday and new perimeter and hillside wattles have been installed today.

Other corrections in progress. Follow up inspection scheduled for Thursday AM.

Complaint Inspection4/2/20184/2/20184/2/2018PFAIL
DetailsAndy J. Long
Sediement runoff from site is occuring , in particular where the roof top drain outlet is.

- install energy dissipation rip rap or pan at downspout.
- repair rill in hillside
- re-install perimter wattles and hillside wattle originally installed
- clean up street
- make schedule for stabilization and/or landscaping.
General Inspection3/13/20183/13/20183/13/2018PPASS
DetailsMichael Zawacki
Builder on site, is cleaning lumber scraps, trash pickup is for later today. Some wattle along road is warn out, will relocate wattle from above that is no longer being used. Road out front is clean.
General Inspection1/10/20181/10/20181/10/2018PPART
DetailsAndy J. Long
post rainfall inspection

No trackout from site. Some small amounts of mud in gutters from storm. Overall site did well, no significant erosion or sediment blow outs.

Correction request for next 1-2 weeks:
- install new section of wattle to the west of the of the house to repair current wattles that are torn/damage.
- clean gutters once dry
- continue to require parking on street only until driveway is paved/stabilized.
General Inspection11/6/201711/6/201711/6/2017APART
DetailsAndy J. Long
post rainfall inspection

BMPs installed on perimeter and slope contained sediment onsite, however there is some mud in gutter from parking and trackout that needs clean up this week.

New wattle installation on west side of foundation on slope is properly installed. No significant trackout or loose trash.

Need to provide trash box and clean gutters.
General Inspection10/10/201710/12/201710/13/2017APASS
DetailsMichael Zawacki
Ran into Jason Jones on site. He will be hydro seeding for knife river. Work on tank and haul road complete.
General Inspection10/4/201710/4/201710/10/2017PPEND
DetailsAndy J. Long
General Inspection9/22/20179/22/20179/26/2017PDONE
DetailsAndy J. Long
Follow meeting with RP.

Concrete work to be completed next week as well as backfilling. Once backfilled, new perimeter controls and stabilized entrance reconstructed.

In meanwhile will clean gutters and parking area and install rock bag/wattle check dam in valley gutter
BMP Violation9/22/20179/22/20179/22/2017AFAIL
DetailsAndy J. Long
Need more sediment protection in culdesac valley gutter and employee parking area. Lots of loose mud. Inadequate construction entrance.

Muddy discharge.

Verbal correction request & warning to RP Dan to install rock bag check dam/wattle around site to try and retain and filter sediment in the stormwater in the gutter.

Will follow up. VM left
General Inspection8/31/20179/6/20179/13/2017ACANC
DetailsAndy J. Long
General Inspection8/10/20178/24/20178/24/2017APEND
DetailsAndy J. Long
No trackout or dischareges.

Verbal notice to RP to be sure to re-install perimeter wattles where excavator is accessing site and to remove the excess loose dirt. Work is in progress, will check back upon completion of excavation of foundation.
Site Preparation8/9/20178/10/20178/10/2017APASS
DetailsAndy J. Long
9:30 AM site conference

RP/GC Dan onsite with approved ESC plans. Crew in progress of installing perimeter wattle and cutting the driveway access so that RPC can install a boulder wall. Wall will have drainage behind it to divert run-on from the disturbed area. RP is planning to preserve as much vegetation as possible during wall installation. Permit sign to be posted on the temporary power pole.

Approved for construction. Follow inspection scheduled

Site Final11/30/201811/30/2018 P 
DetailsAndy J. Long
General Inspection8/24/20178/28/2017 A 
DetailsAndy J. Long