Information based on query as of Tuesday, May 14, 2024.
Permit Information
Permit NumberESC18-00023
StatusIssued
Name KALEN SAVARIA
Site Address 11101 W OVERLAND RD
Project NameSouthpoint Subdivision #5
Customer Number 
ePlanReviewNo
Description
grading plan to delineate the placement of structural fill material within the mapped floodplain boundary at Southpoint Subdivision (PUD 15-00028) in Boise, Idaho. The grading plan will establish a finished sub-grade elevation sufficient to increase the elevation of each parcel within the floodplain boundary to a minimum of 0.1 feet above the mapped base flood elevation as depicted on the FEMA Letter of Map Revision effective August 3, 2015.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/30/20207/30/20207/30/2020 PASS
DetailsMichael Zawacki
Area is stable, silt fence still along southern perimeter.
General Inspection6/29/20206/29/20207/1/2020 PASS
DetailsAndy J. Long
No activity. Infrastructure installed, disturbed area has regrown vegeation. No issues observed. Silt fence is still installed along the canal to the south border of project area.
General Inspection5/28/20205/28/20205/28/2020 PASS
DetailsAndy J. Long
No activity. Silt fence still installed along southern perimeter, mostly vegetated.
General Inspection4/27/20204/27/20204/27/2020 PASS
DetailsMichael Zawacki
No activity. Site has complete grass coverage. Silt fence along southern perimeter serving no purpose, has started to fall over. Entrance is being used to sell used vehicles.
General Inspection3/26/20203/26/20203/26/2020 CANC
DetailsAndy J. Long
General Inspection2/24/20202/24/20202/24/2020 PASS
DetailsMichael Zawacki
No activity, lots of growth on site.
General Inspection1/23/20201/23/20201/23/2020 CANC
DetailsMichael Zawacki
General Inspection12/23/201912/23/201912/23/2019 PASS
DetailsMichael Zawacki
idle
General Inspection11/21/201911/21/201911/21/2019 CANC
DetailsAndy J. Long
General Inspection10/21/201910/21/201910/22/2019 PASS
DetailsAndy J. Long
NO activity. Silt fence temporary BMP still installed at south end of site. Will keep open till further development.
General Inspection9/19/20199/19/20199/19/2019PPASS
DetailsMichael Zawacki
Lot is grown and stabilized.No esc issues.
General Inspection9/2/20199/2/20199/3/2019 CANC
DetailsAndy J. Long
General Inspection8/1/20198/1/20198/1/2019 CANC
DetailsAndy J. Long
General Inspection7/1/20197/1/20197/1/2019 PASS
DetailsMichael Zawacki
No new activity, site is stable.
General Inspection5/31/20195/31/20195/31/2019PPASS
DetailsMichael Zawacki
No activity. Entrance still in place, site has thick vegetation cover.
General Inspection5/9/20195/9/20195/9/2019PPASS
DetailsMichael Zawacki
No new activity, site is covered in growth.
General Inspection4/16/20194/16/20194/16/2019 PASS
DetailsMichael Zawacki
No activity. Some stockpiled material on site.
General Inspection3/13/20193/13/20193/13/2019PPASS
DetailsMichael Zawacki
Site is graded, some stockpiles. No activity.
General Inspection2/11/20192/11/20192/11/2019 PASS
DetailsAndy J. Long
No activity. No ESC violations. Site is graded. Silt fence perimeter is installed along the southern perimeter to protect canal.
General Inspection1/9/20191/9/20191/9/2019 PASS
DetailsMichael Zawacki
Site is graded and inactive. No job trailer or equipment on site. Silt fence installed along path, lots of unused wattle on site, few stockpiles. Rock entrance on site.
General Inspection1/9/20191/9/20191/9/2019PCANC
DetailsMichael Zawacki
General Inspection12/6/201812/6/201812/6/2018PPASS
DetailsMichael Zawacki
No activity, site frozen and snow covered.
General Inspection11/30/201811/30/201811/30/2018 PASS
DetailsMichael Zawacki
Site is all graded, few stockpiles. Area is all below grade of Overland. Construction entrance installed, no trackout. No vehicles or equipment at site.
General Inspection10/29/201810/29/201810/29/2018PPASS
DetailsAndy J. Long
?WIP on fill placement. No trackout from site, construction entrance is still working, but may need refreshing if wet weather occurs. Silt fence perimeter is installed on south side of project. Permit sign posted.
General Inspection10/10/201810/10/201810/10/2018PPASS
DetailsMichael Zawacki
No new activity. Expected to be back on site 10-12-18
General Inspection10/2/201810/2/201810/2/2018PPASS
DetailsMichael Zawacki
Talked to RP, will not be in this area until next week.
General Inspection9/5/20189/19/20189/19/2018PPASS
DetailsMichael Zawacki
No activity on site. Scheduled for grading after storage lot is finished. Will use dust control when grading begins.
General Inspection9/10/20189/10/20189/10/2018PPASS
DetailsMichael Zawacki
Currently bringing in fill material from 5 mile storage. Will use sweeper on roads once all fill brought in. Silt fence along rear perimeter, vegatative buffer along overland, entrance installed.
General Inspection9/10/20189/10/20189/10/2018PCANC
DetailsMichael Zawacki
Entry error
General Inspection9/10/20189/10/20189/10/2018PCANC
DetailsMichael Zawacki
Site Preparation8/31/20189/5/20189/5/2018APASS
DetailsAndy J. Long
9:15 AM BMP inspection. Ok to start Tuesday 9/4

Site walk through inspection with RP KJ.

- angular rock construction entrance with lining installed
- ESC permit sign posted and SWPPP available
- silt fence perimeter and sediment barrier installed at south clearing limits to protect 5 Mile Creek. Bankside vegetation and walking path are located in between fence and creek
- water truck onsite for fugitive dust control with dedicated driver. Truck was in operation.
- RP will install sediment protection on the storm drain just west of the entrance in case of any incidental trackout.

Approved.
Site Preparation8/20/20188/24/20188/24/2018ACANC
DetailsAndy J. Long
10 AM pre construction conference

to be rescheduled.