General Inspection | 7/30/2020 | 7/30/2020 | 7/30/2020 | | PASS |
Michael Zawacki
|
|
|
Area is stable, silt fence still along southern perimeter.
|
General Inspection | 6/29/2020 | 6/29/2020 | 7/1/2020 | | PASS |
Andy J. Long
|
|
|
No activity. Infrastructure installed, disturbed area has regrown vegeation. No issues observed. Silt fence is still installed along the canal to the south border of project area.
|
General Inspection | 5/28/2020 | 5/28/2020 | 5/28/2020 | | PASS |
Andy J. Long
|
|
|
No activity. Silt fence still installed along southern perimeter, mostly vegetated.
|
General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 | | PASS |
Michael Zawacki
|
|
|
No activity. Site has complete grass coverage. Silt fence along southern perimeter serving no purpose, has started to fall over. Entrance is being used to sell used vehicles.
|
General Inspection | 3/26/2020 | 3/26/2020 | 3/26/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/24/2020 | 2/24/2020 | 2/24/2020 | | PASS |
Michael Zawacki
|
|
|
No activity, lots of growth on site.
|
General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | | PASS |
Michael Zawacki
|
|
|
idle
|
General Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/21/2019 | 10/21/2019 | 10/22/2019 | | PASS |
Andy J. Long
|
|
|
NO activity. Silt fence temporary BMP still installed at south end of site. Will keep open till further development.
|
General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Michael Zawacki
|
|
|
Lot is grown and stabilized.No esc issues.
|
General Inspection | 9/2/2019 | 9/2/2019 | 9/3/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/1/2019 | 8/1/2019 | 8/1/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/1/2019 | 7/1/2019 | 7/1/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity, site is stable.
|
General Inspection | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Michael Zawacki
|
|
|
No activity. Entrance still in place, site has thick vegetation cover.
|
General Inspection | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Michael Zawacki
|
|
|
No new activity, site is covered in growth.
|
General Inspection | 4/16/2019 | 4/16/2019 | 4/16/2019 | | PASS |
Michael Zawacki
|
|
|
No activity. Some stockpiled material on site.
|
General Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is graded, some stockpiles. No activity.
|
General Inspection | 2/11/2019 | 2/11/2019 | 2/11/2019 | | PASS |
Andy J. Long
|
|
|
No activity. No ESC violations. Site is graded. Silt fence perimeter is installed along the southern perimeter to protect canal.
|
General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 | | PASS |
Michael Zawacki
|
|
|
Site is graded and inactive. No job trailer or equipment on site. Silt fence installed along path, lots of unused wattle on site, few stockpiles. Rock entrance on site.
|
General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 12/6/2018 | 12/6/2018 | 12/6/2018 | P | PASS |
Michael Zawacki
|
|
|
No activity, site frozen and snow covered.
|
General Inspection | 11/30/2018 | 11/30/2018 | 11/30/2018 | | PASS |
Michael Zawacki
|
|
|
Site is all graded, few stockpiles. Area is all below grade of Overland. Construction entrance installed, no trackout. No vehicles or equipment at site.
|
General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Andy J. Long
|
|
|
?WIP on fill placement. No trackout from site, construction entrance is still working, but may need refreshing if wet weather occurs. Silt fence perimeter is installed on south side of project. Permit sign posted.
|
General Inspection | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | PASS |
Michael Zawacki
|
|
|
No new activity. Expected to be back on site 10-12-18
|
General Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Michael Zawacki
|
|
|
Talked to RP, will not be in this area until next week.
|
General Inspection | 9/5/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Michael Zawacki
|
|
|
No activity on site. Scheduled for grading after storage lot is finished. Will use dust control when grading begins.
|
General Inspection | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
Michael Zawacki
|
|
|
Currently bringing in fill material from 5 mile storage. Will use sweeper on roads once all fill brought in. Silt fence along rear perimeter, vegatative buffer along overland, entrance installed.
|
General Inspection | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | CANC |
Michael Zawacki
|
|
|
Entry error
|
General Inspection | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | CANC |
Michael Zawacki
|
|
|
|
Site Preparation | 8/31/2018 | 9/5/2018 | 9/5/2018 | A | PASS |
Andy J. Long
|
|
|
9:15 AM BMP inspection. Ok to start Tuesday 9/4
Site walk through inspection with RP KJ.
- angular rock construction entrance with lining installed - ESC permit sign posted and SWPPP available - silt fence perimeter and sediment barrier installed at south clearing limits to protect 5 Mile Creek. Bankside vegetation and walking path are located in between fence and creek - water truck onsite for fugitive dust control with dedicated driver. Truck was in operation. - RP will install sediment protection on the storm drain just west of the entrance in case of any incidental trackout.
Approved.
|
Site Preparation | 8/20/2018 | 8/24/2018 | 8/24/2018 | A | CANC |
Andy J. Long
|
|
|
10 AM pre construction conference
to be rescheduled.
|