BMP Violation | 7/20/2020 | 7/23/2020 | 7/22/2020 | A | PASS |
Michael Zawacki
|
|
|
Most off mess cleaned. Area still has the broken up old piles of washout that is hardened. Risk of people dumping on them.
|
General Inspection | 7/20/2020 | 7/20/2020 | 7/20/2020 | | FAIL |
Michael Zawacki
|
|
|
Dumped washout besides 3052 millbrook. Looks like maybe paint or stucco. Message sent to RP and follow up scheduled. Rest of site is clean, other stucco crew is working on liner. No trash in creek.
|
General Inspection | 6/18/2020 | 6/18/2020 | 6/18/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on multiple homes. No trash in creek. Area is clean. Some completed homes already have residents.
|
General Inspection | 5/18/2020 | 5/18/2020 | 5/19/2020 | | PASS |
Michael Zawacki
|
|
|
Few pieces of home wrap were blown into creek, I cleaned them up. All foundations are poured, crews are working on framing. Multiple trash boxes, site is clean. All parking areas are completed, no one driving in mud. Landscapers are working at completed homes. No ESC issues at site.
|
General Inspection | 4/16/2020 | 4/16/2020 | 4/17/2020 | | PASS |
Andy J. Long
|
|
|
WIP. Trash fence and inlet protection installed. NO spills, discharge, washout, or trash issues obsereved
|
General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on townhomes. Site is clean. Using plywood when genie lift leaving pavement. No wind blown trash. Trash fence still protecting creek.
|
General Inspection | 2/13/2020 | 2/13/2020 | 2/18/2020 | | PASS |
Michael Zawacki
|
|
|
All pads have been poured. Work on town homes by block. No blowing trash, no esc issues.
|
General Inspection | 1/13/2020 | 1/13/2020 | 1/14/2020 | | PASS |
Michael Zawacki
|
|
|
Multiple 4-plexes being framed. Site is snow covered.
|
General Inspection | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
Michael Zawacki
|
|
|
All foundations poured. Site is clean. Building work is going from west to east.
|
General Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 | | PART |
Michael Zawacki
|
|
|
Message sent to RP Lazoro. Washout needs maintenance, pretty full and looks like it is passed liner. Some trash blown into wind fence and into creek.
|
General Inspection | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 10/18/2019 | 10/18/2019 | 10/21/2019 | | PASS |
Michael Zawacki
|
|
|
Almost all foundations finished, concrete cre working on last few. Lined washout on site and used. Building on western most units has begun. Lots of dirt on road within site, no tracking to main roads.
|
General Inspection | 9/16/2019 | 9/16/2019 | 9/17/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 | | PASS |
Michael Zawacki
|
|
|
Foundations are poured, no other work has begun. Crew on site reinstalling silt fence along southern perimeter. Trash fence installed ner creek.
|
General Inspection | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. Some foundations have been poured. Storm drain sediment protection installed, trash fence is now installed along Warm Springs Creek as requested.
|
General Inspection | 6/24/2019 | 6/24/2019 | 6/25/2019 | | PASS |
Michael Zawacki
|
|
|
No current activity. multiple foundations completed. Split rail fence along creek has been completed, trash fence not yet installed. Inlets are protected.
|
BMP Violation | 5/21/2019 | 5/23/2019 | 5/22/2019 | A | PASS |
Michael Zawacki
|
|
|
Met with Joey on site. Has crew sweeping roads, sidewalks, and alleys, done at end of day. New RP will be taking over as he transitions to office. Split rail fence to be installed with silt fence along it acting as wind fence to prevent blown trash. North side of park center will not begin untill all work is done on south side.
|
BMP Violation | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | CANC |
Michael Zawacki
|
|
|
Error on date
|
General Inspection | 5/20/2019 | 5/20/2019 | 5/21/2019 | | FAIL |
Michael Zawacki
|
|
|
Lots of dirt and landscape debris on site. Follow up scheduled.
|
General Inspection | 4/18/2019 | 4/18/2019 | 4/18/2019 | | PASS |
Michael Zawacki
|
|
|
Work on foundations for row homes. Some backfill is piled along sidewalk with no perimeter controls. No work near creek.
|
General Inspection | 3/18/2019 | 3/18/2019 | 3/19/2019 | | PASS |
Andy J. Long
|
|
|
No new SFHs yet. Infrastructure complete. No requests at this time. Will request trash fence installed along Warm Springs Creek when SFH construction begins.
|
General Inspection | 2/13/2019 | 2/13/2019 | 2/13/2019 | | PASS |
Michael Zawacki
|
|
|
Prep work completed. No ESC issues.
|
General Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | | PASS |
Michael Zawacki
|
|
|
No work has begun. Alley storm drains will need protection before any work, sand or gravel bags needed where water will flow into landscaped area.
|
General Inspection | 12/5/2018 | 12/5/2018 | 12/7/2018 | | PASS |
Michael Zawacki
|
|
|
Site prep work complete, no new home activity.
|
General Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PART |
Andy J. Long
|
|
|
Grading, road, and infrastructure installed. No SFHs in progress yet. Need to landscape sidewalk medians. May need to install additional perimeter controls on south side of blocks to prevent turbid sheet flow to storm drains in the alleys.
Correction needed: - install sediment protection on alley way storm drains - pick up trash is Warm Springs creek north of Parkcenter BLVD
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | DONE |
Michael Zawacki
|
|
|
|
General Inspection | 6/6/2018 | 6/14/2018 | 6/13/2018 | A | PASS |
Andy J. Long
|
|
|
WIP on grading for subdivision and doing trench work along Parkcenter. Construction entrances are installed. Water truck on site for fugitive dust control. RP on site 6/12 for periodic inspection. No corrections requested, approved.
|
General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on grading, fill, and compaction of old Warm Springs Creek Channel. No significant trackout, construction entrances installed, SWPPP info posted.
Water truck onsite, no fugitive dust at time of insepction. Witnessed some fugitive dust yesterday and issued reminder/warning to Rex with Knife River.
|
Site Preparation | 5/18/2018 | 5/21/2018 | 5/21/2018 | A | PASS |
Michael Zawacki
|
|
|
10 AM precon Work on getting ends of new creek opened up. 404 permit issued. No fill in work until new plans are approved.
|