Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberESC18-00179
StatusIssued
Name JASON JONES
Site Address 2980 S MILLBROOK WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
33 lot, multifamily and single family residential subdivision
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BMP Violation7/20/20207/23/20207/22/2020APASS
DetailsMichael Zawacki
Most off mess cleaned. Area still has the broken up old piles of washout that is hardened. Risk of people dumping on them.
General Inspection7/20/20207/20/20207/20/2020 FAIL
DetailsMichael Zawacki
Dumped washout besides 3052 millbrook. Looks like maybe paint or stucco. Message sent to RP and follow up scheduled.
Rest of site is clean, other stucco crew is working on liner. No trash in creek.
General Inspection6/18/20206/18/20206/18/2020 PASS
DetailsMichael Zawacki
WIP on multiple homes. No trash in creek. Area is clean. Some completed homes already have residents.
General Inspection5/18/20205/18/20205/19/2020 PASS
DetailsMichael Zawacki
Few pieces of home wrap were blown into creek, I cleaned them up.
All foundations are poured, crews are working on framing. Multiple trash boxes, site is clean. All parking areas are completed, no one driving in mud. Landscapers are working at completed homes.
No ESC issues at site.
General Inspection4/16/20204/16/20204/17/2020 PASS
DetailsAndy J. Long
WIP. Trash fence and inlet protection installed. NO spills, discharge, washout, or trash issues obsereved
General Inspection3/16/20203/16/20203/16/2020 PASS
DetailsMichael Zawacki
WIP on townhomes. Site is clean. Using plywood when genie lift leaving pavement. No wind blown trash. Trash fence still protecting creek.
General Inspection2/13/20202/13/20202/18/2020 PASS
DetailsMichael Zawacki
All pads have been poured. Work on town homes by block. No blowing trash, no esc issues.
General Inspection1/13/20201/13/20201/14/2020 PASS
DetailsMichael Zawacki
Multiple 4-plexes being framed. Site is snow covered.
General Inspection12/13/201912/13/201912/13/2019PPASS
DetailsMichael Zawacki
All foundations poured. Site is clean. Building work is going from west to east.
General Inspection11/25/201911/25/201911/25/2019 PART
DetailsMichael Zawacki
Message sent to RP Lazoro.
Washout needs maintenance, pretty full and looks like it is passed liner.
Some trash blown into wind fence and into creek.
General Inspection10/23/201910/23/201910/23/2019PCANC
DetailsMichael Zawacki
General Inspection10/18/201910/18/201910/21/2019 PASS
DetailsMichael Zawacki
Almost all foundations finished, concrete cre working on last few. Lined washout on site and used. Building on western most units has begun. Lots of dirt on road within site, no tracking to main roads.
General Inspection9/16/20199/16/20199/17/2019 PASS
DetailsAndy J. Long
General Inspection8/16/20198/16/20198/16/2019 PASS
DetailsMichael Zawacki
Foundations are poured, no other work has begun. Crew on site reinstalling silt fence along southern perimeter. Trash fence installed ner creek.
General Inspection7/16/20197/16/20197/16/2019PPASS
DetailsAndy J. Long
No activity at time of inspection. Some foundations have been poured. Storm drain sediment protection installed, trash fence is now installed along Warm Springs Creek as requested.
General Inspection6/24/20196/24/20196/25/2019 PASS
DetailsMichael Zawacki
No current activity. multiple foundations completed. Split rail fence along creek has been completed, trash fence not yet installed. Inlets are protected.
BMP Violation5/21/20195/23/20195/22/2019APASS
DetailsMichael Zawacki
Met with Joey on site. Has crew sweeping roads, sidewalks, and alleys, done at end of day. New RP will be taking over as he transitions to office.
Split rail fence to be installed with silt fence along it acting as wind fence to prevent blown trash. North side of park center will not begin untill all work is done on south side.
BMP Violation5/21/20195/21/20195/21/2019PCANC
DetailsMichael Zawacki
Error on date
General Inspection5/20/20195/20/20195/21/2019 FAIL
DetailsMichael Zawacki
Lots of dirt and landscape debris on site.
Follow up scheduled.
General Inspection4/18/20194/18/20194/18/2019 PASS
DetailsMichael Zawacki
Work on foundations for row homes. Some backfill is piled along sidewalk with no perimeter controls. No work near creek.
General Inspection3/18/20193/18/20193/19/2019 PASS
DetailsAndy J. Long
No new SFHs yet. Infrastructure complete. No requests at this time. Will request trash fence installed along Warm Springs Creek when SFH construction begins.
General Inspection2/13/20192/13/20192/13/2019 PASS
DetailsMichael Zawacki
Prep work completed. No ESC issues.
General Inspection1/10/20191/10/20191/10/2019 PASS
DetailsMichael Zawacki
No work has begun.
Alley storm drains will need protection before any work, sand or gravel bags needed where water will flow into landscaped area.
General Inspection12/5/201812/5/201812/7/2018 PASS
DetailsMichael Zawacki
Site prep work complete, no new home activity.
General Inspection10/2/201810/2/201810/2/2018PPART
DetailsAndy J. Long
Grading, road, and infrastructure installed. No SFHs in progress yet. Need to landscape sidewalk medians. May need to install additional perimeter controls on south side of blocks to prevent turbid sheet flow to storm drains in the alleys.

Correction needed:
- install sediment protection on alley way storm drains
- pick up trash is Warm Springs creek north of Parkcenter BLVD
General Inspection8/14/20188/14/20188/14/2018PDONE
DetailsMichael Zawacki
General Inspection6/6/20186/14/20186/13/2018APASS
DetailsAndy J. Long
WIP on grading for subdivision and doing trench work along Parkcenter. Construction entrances are installed. Water truck on site for fugitive dust control. RP on site 6/12 for periodic inspection. No corrections requested, approved.
General Inspection6/6/20186/6/20186/6/2018PPASS
DetailsAndy J. Long
WIP on grading, fill, and compaction of old Warm Springs Creek Channel. No significant trackout, construction entrances installed, SWPPP info posted.

Water truck onsite, no fugitive dust at time of insepction. Witnessed some fugitive dust yesterday and issued reminder/warning to Rex with Knife River.
Site Preparation5/18/20185/21/20185/21/2018APASS
DetailsMichael Zawacki
10 AM precon
Work on getting ends of new creek opened up. 404 permit issued. No fill in work until new plans are approved.