Description
This application is for the grading and drainage portion of the project in preparation for a new manufacturing facility for Ace Co Precision.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/30/20208/5/20208/6/2020PPASS
DetailsMichael Zawacki
WIP on interior. Outside is completed except for storage yard.
General Inspection7/30/20207/30/20207/30/2020 CANC
DetailsAndy J. Long
rescheduled for site final
General Inspection7/15/20207/15/20207/15/2020 PASS
DetailsMichael Zawacki
Inspected 7/13.
Building exterior completed. Parking lot paved and landscaping done. Old storage lot has been graded. No issues at site.
General Inspection6/30/20206/30/20206/30/2020 PASS
DetailsMichael Zawacki
Site is clean and paved. Landscape soil is stored on rear of lot.
No issues.
General Inspection6/15/20206/15/20206/15/2020 PASS
DetailsMichael Zawacki
Site is paved and cleaned. All workers parked on site.
General Inspection5/29/20205/29/20205/29/2020 PASS
DetailsMichael Zawacki
Most exterior work completed. Sections of staging yard not being used have overgrown with weed.
Parking lot perimeter paved.
General Inspection5/14/20205/14/20205/15/2020 PASS
DetailsMichael Zawacki
Site has been paved.
Crew on site prepping apron. Site is clean and contained, no issues.
General Inspection4/29/20204/29/20204/29/2020 PASS
DetailsMichael Zawacki
Curbing completed, crew prepping parking lot bed for paving. Expect to begin paving on 5/4. Parking lot drains will be contained on own system. Will be no disturbed area once paved, gave PM ok to not put in protection in parking lot.
Crew almost done texturing exterior walls, they are using drop cloths.
Site is clean.
General Inspection4/14/20204/14/20204/14/2020 CANC
DetailsMichael Zawacki
General Inspection3/30/20203/30/20203/30/2020 PASS
DetailsMichael Zawacki
Few workers on site. No issues.
General Inspection3/13/20203/13/20203/13/2020 CANC
DetailsAndy J. Long
see also ESC18-00117
General Inspection2/27/20202/27/20202/27/2020 PASS
DetailsMichael Zawacki
Site is clean and contained.
General Inspection2/12/20202/12/20202/12/2020 PASS
DetailsMichael Zawacki
Clean and contained, nothing blowing off site and no tracking.
General Inspection1/28/20201/28/20201/29/2020 PASS
DetailsMichael Zawacki
Exterior nearly completed. No tracking from site, clean and contained.
General Inspection1/10/20201/10/20201/10/2020 CANC
DetailsMichael Zawacki
General Inspection12/26/201912/26/201912/30/2019 PASS
DetailsMichael Zawacki
Site is clean and contained.
General Inspection12/11/201912/11/201912/11/2019 PASS
DetailsMichael Zawacki
Starting to install walls on steel frame. Site is clean and contained.
General Inspection11/26/201911/26/201911/26/2019 PASS
DetailsMichael Zawacki
WIP on steel framing. Site is clean and contained.
General Inspection11/8/201911/8/201911/8/2019 CANC
DetailsAndy J. Long
General Inspection10/24/201910/24/201910/24/2019 PASS
DetailsMichael Zawacki
WIP on steel frame. All materials stored on site. No dust or trackout. No ESC issues.
General Inspection10/9/201910/9/201910/9/2019 PASS
DetailsMichael Zawacki
Syman is doing site inspections. WIP on concrete slab and steel perimeter beams. Giant ecopan on site, some spillage around it but no dumped washout at site.
Windy during inspection, very little dust. Gates are closed forcing people to drive ovcer entrance, most workers parked on street.
General Inspection9/24/20199/24/20199/25/2019 PASS
DetailsMichael Zawacki
Multiple areas of site work. Water truck on site, no dust or trackout. Lots of materiall on site, will need to watch for blowing plastics and carboard. Roll pan washout on site, stabalized entrance, most workers parked on road.
General Inspection9/5/20199/5/20199/5/2019 CANC
DetailsMichael Zawacki
General Inspection8/21/20198/21/20198/22/2019 PASS
DetailsMichael Zawacki
WIP on putting backfill back within foundation. Multiple large stockpiles on site, no blowing dust. Rock entrance can use some freshening up, no trackout at time of inspection.
General Inspection8/2/20198/2/20198/2/2019 PASS
DetailsMichael Zawacki
Wall along morthern edge bordering canal completed.
Current work is on foundation and footings, trucks using washout.
Water truck on site, no dust or trackout.
General Inspection4/22/20195/14/20195/14/2019PPASS
DetailsMichael Zawacki
WIP on grading. Entrance still in place, will need to be removed when waterline is hooked up, line will go through middle. Water truck on site, two lined washouts on site. No dust at time of inspection, no complaints from neighbors.
General Inspection4/22/20194/22/20194/22/2019PPASS
DetailsAndy J. Long
WIP on installing site retaining wall along the north perimeter. Vegetated buffer between work area and NY Canal easement. Fence is open in the NW corner, once wall work is down it will be closed and vehicle tracks repaired.

Site has lined concrete washouts, permit sign posted, RP on site, inspection log in binder.

Verbal correction request to sweep up minor trackout and refresh construction entrance.
General Inspection2/8/20192/8/20192/8/2019PPASS
DetailsMichael Zawacki
Site is graded, some piles of rocks and sand. Lined entrance installed, no trackout. No current activity.
General Inspection1/8/20191/8/20191/8/2019APASS
DetailsAndy J. Long
Permit sign posted. Storm drain on McGregor has and sediment protection. No activity at site, grading for building footprint looks complete.

No significant trackout, but once work resumes the construction entrance will need to scraped and more rock added.
General Inspection11/19/201811/19/201811/19/2018PPASS
DetailsAndy J. Long
Site grading and earthwork in progress. Construction entrance installed. Permit sign posted. No trackout or discharges. Water truck onsite for dust control. Approved.
Site Preparation11/1/201811/2/201811/2/2018APASS
DetailsMichael Zawacki
OK to start.
Syman has installed silt fence and watlle perimeter. 75' lined crushed rock entrance installed. Witches hat and gravel bag protecting inlet in cul-de-sac.
SWPPP board and permit displayed at entrance.