General Inspection | 8/5/2020 | 8/5/2020 | 8/5/2020 | | PASS |
Michael Zawacki
|
|
|
Home exterior is mostly completed, still has scaffolding. Worker with trash trailer hooked up at site, area is clean.
|
General Inspection | 7/21/2020 | 7/21/2020 | 7/21/2020 | | PASS |
Michael Zawacki
|
|
|
Exterior about completed. Stucco looks done, scaffolding still around home. No wind blown trash in surrounding hillsides.
|
General Inspection | 7/6/2020 | 7/6/2020 | 7/7/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/19/2020 | 6/19/2020 | 6/24/2020 | | PASS |
Michael Zawacki
|
|
|
Crew on site framing. Site is clean and trash free. Multiple loads of fill have been dumped along driveway, road has been swept.
|
General Inspection | 6/4/2020 | 6/4/2020 | 6/11/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/20/2020 | 5/20/2020 | 5/20/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 5/5/2020 | 5/5/2020 | 5/5/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing. No issues.
|
General Inspection | 4/17/2020 | 4/21/2020 | 4/20/2020 | P | PASS |
Michael Zawacki
|
|
|
One worker framing home. Windows are 4 weeks out, may need to visqueen openings to get started on plumbing and Hvac. Site is clean, no trash or runoff.
|
General Inspection | 4/17/2020 | 4/17/2020 | 4/17/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/24/2020 | 4/2/2020 | 4/2/2020 | P | PASS |
Michael Zawacki
|
|
|
One worker on site framing. Site is clean and slowly progressing.
|
General Inspection | 3/16/2020 | 3/19/2020 | 3/24/2020 | A | PEND |
Andy J. Long
|
|
|
follow up inspection
|
General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | FAIL |
Andy J. Long
|
|
|
Homeowner RP-GC James Jewitt
Water coming off roof and from site running down sandy access road shoulder and causing erosion and sediment runoff.
Request to homeowner-builder-developer to install water bars or wattles to divert run off to vegetated area
|
General Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 2/27/2020 | 2/27/2020 | 2/28/2020 | | PASS |
Michael Zawacki
|
|
|
Still slowly framing, no issues.
|
General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Michael Zawacki
|
|
|
Framer on site, no issues. No runoff or blowouts from rain event.
|
General Inspection | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Michael Zawacki
|
|
|
Some framing completed, no one at site.
|
General Inspection | 1/1/2020 | 1/1/2020 | 1/2/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/17/2019 | 12/17/2019 | 12/17/2019 | | PASS |
Michael Zawacki
|
|
|
Some work on framing. Site is clean.
|
General Inspection | 12/2/2019 | 12/2/2019 | 12/2/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/15/2019 | 11/15/2019 | 11/18/2019 | | PASS |
Michael Zawacki
|
|
|
Somer more framing completed, site clean. RPC on site doing decorative rock work.
|
General Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 | | PASS |
Michael Zawacki
|
|
|
oME FRAMING OF GARAGE HAS BEEN DONE. sITE CLEAN , NO ISSUES, VERY MINIMAL WORK DONE ON HOME.
|
General Inspection | 10/16/2019 | 10/16/2019 | 10/16/2019 | | PASS |
Michael Zawacki
|
|
|
Home is framed and roofed, all material off sidewalk and road. No dirt leaving site, no loose or blowing trash.
|
General Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Michael Zawacki
|
|
|
No workers on site. Area arong garage has been framed. Water on site, no dust.
|
General Inspection | 9/12/2019 | 9/12/2019 | 9/12/2019 | | PASS |
Michael Zawacki
|
|
|
Carpenter on site just getting started, no issues.
|
General Inspection | 8/27/2019 | 8/27/2019 | 8/27/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity. Stockpile is starting to have weed growth. Water is on site, no dust.
|
General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | PASS |
Michael Zawacki
|
|
|
No new activity since last inspection.
|
General Inspection | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Michael Zawacki
|
|
|
No new activity, no issues.
|
General Inspection | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is contained and stable. No ESC issues.
|
General Inspection | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | PART |
Michael Zawacki
|
|
|
Forms for concrete have been installed. No washout installed. Will need to watch for trackout, access is bare.
|
General Inspection | 3/1/2019 | 3/1/2019 | 3/1/2019 | P | PASS |
Michael Zawacki
|
|
|
No ESC issues caused by rain events.
|
General Inspection | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | PASS |
Michael Zawacki
|
|
|
Rainfall inspection. Dirt drive is snow covered. No sediment runoff or track out.
|
General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PART |
Michael Zawacki
|
|
|
No new construction activity. Some dirt running down road shared with ranching access.
|
General Inspection | 1/4/2019 | 1/7/2019 | 1/7/2019 | P | PASS |
Michael Zawacki
|
|
|
No equipment on site. Rock wall complete and site graded flat.
|
General Inspection | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
Michael Zawacki
|
|
|
RPC has completed wall work. Excavator on site levelling out grade. No dirt leaving site.
|
Site Preparation | 11/23/2018 | 11/26/2018 | 11/27/2018 | A | PASS |
Michael Zawacki
|
|
|
Wattles have been installed around homesite and entrance. Workers are parking on vacant lot below. Rocks are being stockpiled on right side by entrance. A construction entrance will be needed for when trucks enter site.
|
Site Preparation | 11/19/2018 | 11/21/2018 | 11/23/2018 | A | PEND |
Andy J. Long
|
|
|
|
Random Inspection | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PEND |
Andy J. Long
|
|
|
Excavation in progress. GC on site. Will schedule ESC site preparation on initial BMPs are installed.
|