Permit Information
Permit NumberESC19-00927
StatusFinaled
Name PHIL DUMAN
Site Address 123 W HIGHLAND VIEW DR
Project NameFlatiron Ridge
Customer Number 
ePlanReviewNo
Description
Turn one large lot into 4 lots, relocate driveway and utilities, build 4 temporary retention ponds for each lot. Preserve existing vegetation as much as possible. Site preparation inspection is required. ESC site map must be on site. Install sediment protection around retention ponds after excavation. No trackout allowed, construction entrance regular sweeping are required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/17/20206/17/20206/17/2020 CANC
DetailsAndy J. Long
Site Final6/17/20206/17/20206/17/2020PPASS
DetailsAndy J. Long
Initiial subdivsion work and infrastructure complete. Homes now in progress and permitted separately. No ESC requests, further ESC inspections on this permit.
General Inspection6/2/20206/2/20206/2/2020 PASS
DetailsMichael Zawacki
No dust or tracking issues at site. Hillside still not tackified or seeded. Sprinkler flags installed, may be getting ready to install irrigation.
General Inspection5/8/20205/8/20205/11/2020 PASS
DetailsMichael Zawacki
Hillside hasn't been seeded. Water being used around site to keep dust down. No issues at site.
General Inspection4/23/20204/23/20204/23/2020PPASS
DetailsMichael Zawacki
Post rain inspection.
Hillside shows no damage or rilling. No issues at site, no runoff from bottom.
General Inspection4/21/20204/21/20204/21/2020PPASS
DetailsMichael Zawacki
Hillside is fully tracked. No wattle or hydroseed installed.
General Inspection4/14/20204/14/20204/14/2020PPASS
DetailsMichael Zawacki
Rear hillside is at new grade. Currently tracking slopes. Owner plans on getting landscaper to add wattle and hydroseed.
General Inspection3/24/20203/25/20203/25/2020PPASS
DetailsMichael Zawacki
Hillside grading. Disturbances end about 100' before property boundry. Hillside is being grading to a 2 to 1 slope.
No issues.
General Inspection2/6/20202/6/20202/6/2020PPASS
DetailsMichael Zawacki
No new activity on subdivided lots. Currently snow covered.
General Inspection12/3/201912/3/201912/3/2019PPASS
DetailsMichael Zawacki
Wattles still installed on perimeter. Trench work completed, work on first home has begun.
General Inspection11/19/201911/19/201911/19/2019PPASS
DetailsAndy J. Long
Existing vegetation preserved around utiliities and new driveway access. No trackout or discharges. No corrections at this time. New SFH has started on one of the lots and is permitted seperately
General Inspection11/1/201911/1/201911/1/2019PPASS
DetailsMichael Zawacki
Crew on site doing horizontal boring. Boulders for wall staged on site.
Nothing leaving site.
General Inspection10/17/201910/17/201910/17/2019PPASS
DetailsMichael Zawacki
Large excavation for seepage bed. Rocks for rockwall on site. Nothing leaving site.
General Inspection10/2/201910/2/201910/2/2019PPASS
DetailsMichael Zawacki
No new activity at site.
General Inspection9/18/20199/19/20199/19/2019PPASS
DetailsMichael Zawacki
Pipe crew is off site. Still some trenches and stockpiles on lot. Wattle runs along perimeter of road. Stockpiles and site disturbances have natural buffer.
General Inspection8/21/20198/29/20198/29/2019PPASS
DetailsMichael Zawacki
All work currently trenching in street. Water/sewer trench work on site, all staging and storage on lot, small entrance.
Wattle butted end to end acting as perimeter control. No esc issues at time of inspection.
Site Preparation8/21/20198/21/20198/21/2019PPASS
DetailsAndy J. Long
Tommy ###-####

Permit posted, RP and developer on site. Much of the existing vegetation is supposed to remain, with only .6 acres of disturbed area. Perimeter wattles have been installed along Highland View. Construction entrance rock installed for truck loads. Exisitng asphalt driveway is to remain for this first phase, request that some gutter check bags be installed to treat driveway runoff.

Approved for construction.
Site Preparation8/8/20198/8/20198/12/2019PNR
DetailsAndy J. Long
to be rescheduled for next week by project contact Tommy