DOC - Permit Expired | | | 1/23/2020 | | DONE |
Scott Arellano
|
|
|
This permit was DOC-Finaled by Scott Arellano on 4/7/2017 but the status was never changed in the system.
|
FIR-Aging Inspection | 5/13/2019 | 5/13/2019 | 5/13/2019 | | CANC |
Troy Cobbley
|
|
|
|
FIR-Aging Inspection | 12/11/2017 | 12/11/2017 | 12/14/2017 | | NR |
Troy Cobbley
|
|
|
Waiting for the contractor to schedule the work
|
FIR-Aging Inspection | 7/26/2017 | 7/26/2017 | 7/26/2017 | | NR |
Troy Cobbley
|
|
|
Waiting for contractor to schedule work
|
FIR-Aging Inspection | 3/31/2017 | 3/31/2017 | 4/7/2017 | | PASS |
Scott Arellano
|
|
|
|
INSP-Final Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Scott Arellano
|
|
|
|
DOC - Permit Finaled | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Scott Arellano
|
|
|
|
FIR-Aging Inspection | 11/4/2016 | 11/4/2016 | 11/4/2016 | | CANC |
Troy Cobbley
|
|
|
|
FIR-Aging Inspection | 7/27/2016 | 7/27/2016 | 7/27/2016 | | NR |
Troy Cobbley
|
|
|
I spoke to Matt and he is going to follow up on project status
|
FIR-Aging Inspection | 10/15/2014 | 10/15/2014 | 10/15/2014 | | CANC |
Troy Cobbley
|
|
|
|
FIR-Aging Inspection | 7/16/2014 | 7/16/2014 | 7/16/2014 | | CANC |
Troy Cobbley
|
|
|
|
FIR-Aging Inspection | 12/13/2013 | 12/13/2013 | 12/17/2013 | | DONE |
Troy Cobbley
|
|
|
I spoke to Matt about getting a final inspection for this project.
|
FIR-Aging Inspection | 7/18/2013 | 7/18/2013 | 7/18/2013 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
FIR-Aging Inspection | 4/18/2013 | 4/18/2013 | 4/25/2013 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
INSP-Conference | 1/17/2013 | 1/17/2013 | 1/17/2013 | P | DONE |
Troy Cobbley
|
|
|
Went over details to final this project with Matt Casey. and with the onsite store manager Alan. It appears plan modifications will be required.
|
INSP-Conference | 1/9/2013 | 1/9/2013 | 1/9/2013 | P | DONE |
Troy Cobbley
|
|
|
I stopped at the store and spoke to the manager and later spoke to Josh on the phone about the job status and the need to move forward. Later in the day I also received a phone call from Home Depot corporate in Georgia and spoke to them about the same issue.
|
FIR-Aging Inspection | 1/8/2013 | 1/8/2013 | 1/9/2013 | | NR |
Troy Cobbley
|
|
|
wip
|
FIR-Aging Inspection | 10/8/2012 | 10/8/2012 | 10/10/2012 | | NR |
Troy Cobbley
|
|
|
I spoke to Matt and he is going to get me the contact information for Consolidated Fire.
|
FIR-Aging Inspection | 6/20/2012 | 6/20/2012 | 6/20/2012 | | NR |
Troy Cobbley
|
|
|
Per Matt this project is slowing moving along.
|
FIR-Aging Inspection | 2/8/2012 | 2/8/2012 | 2/8/2012 | | NR |
Troy Cobbley
|
|
|
Per matt casey issues are being worked out with the owner.
|
FIR-Aging Inspection | 10/21/2011 | 10/21/2011 | 10/21/2011 | | DONE |
Troy Cobbley
|
|
|
Stephanie and Scott are following up with owner on status of project.
|
FIR-Aging Inspection | 1/5/2011 | 1/5/2011 | 1/12/2011 | | NR |
Troy Cobbley
|
|
|
Matt is waiting on a change order for this project.
|
INSP-Alarm Testing | 10/30/2009 | 10/30/2009 | 10/30/2009 | P | PASS |
Troy Cobbley
|
|
|
The city approved drawings were found. See the city approved drawings, notification sheet, for the list of remaining items/corrections needed.
|
INSP-Alarm Testing | 10/28/2009 | 10/29/2009 | 10/29/2009 | A | DONE |
Troy Cobbley
|
|
|
The inspection today included verification of the phone line monitoring, NAC panel interconnection/trouble monitoring, and tamper/flow switch monitoring as marked on the plans. The job site copy of the plans was not on site. We found an anti-freeze system with three unsupervised control valves in the north east corner of the building that needs its annual inspection and the valves electrically monitored. No other items have been tested.
|