Permit Information
Permit NumberFIR18-00640
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6615 S FEDERAL WAY
Project NamePeterbilt Paint Booth
Customer Number 
ePlanReviewYes
Description
[Peterbilt Paint Booth]
The fire sprinkler scope of work consists of a new riser connected to the existing 6” underground. The system has three grids. Two for the buildings and one for the new paint booth.

[BLD18-01396]
Permit to construct a new 4,070 sq. ft. pre-engineered metal building. Approval is contingent upon adhering to the approved plans on file and attached engineering. Work to include: removal of existing interior paint booth within the existing building, removal of select door/door frame, removal of select mechanical equipment, removal of select exterior compressor enclosure, construction of select new 2-hour rated fire barrier wall, construction of a new 4,000 sq. ft. pre-engineered metal building to house a 1,707 sq. ft. paint booth and a 141 sq. ft. mixing room, construction of new footing foundation, new concrete slab, select existing wall infill, new mechanical equipment, electrical work and mechanical work. Note 1: The spray booth is required to comply with the 2015 International Fire Code, NFPA 33 and 2017 NEC. Note 2: Special inspection is required, see form #310 attached. Note 3: See code alternate attached to fully fire sprinkler the new paint booth building and paint booth related areas plus fully fire sprinkler the adjacent attached existing building. The buildings new Fire Sprinkler/Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There is AMM for this project. See addendum.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/30/20195/31/20195/31/2019APASS
DetailsJim Page
Final fire sprinkler inspection complete.

Mike Martin is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro5/30/20195/31/20195/31/2019ADONE
DetailsJim Page
Hydrostatic test after install of dry uprights witnessed, no pressure loss observed.

Mike Martin is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Conference5/2/20195/2/20195/2/2019PDONE
DetailsTroy Cobbley
I spoke to the building contractor about requirements for heat for the wet pipe system above the office.The contact is Cade. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Conference4/26/20194/29/20194/30/2019PDONE
DetailsTroy Cobbley
Jon and I discussed the requirements for heat tor the wet pipe system above the ceilings in the aoffice area. After a discussion with the fire dept I let Jon know the if direct heat is not provided or insulation provided that heat transfer calculations will be required from a registered engineer.

Jon Beazer is requesting a consult for this project. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection4/16/20194/17/20194/17/2019APART
DetailsJim Page
Fire sprinkler inspection substantially complete, fire alarm components have been tested and verified with central station , remaining items for fire sprinkler completion is providing fire sprinkler in area where old paint booth is going to be removed. Permit will remain in issued status until all sprinkler work is completed.

Austin Farnworth is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection4/12/20194/16/20194/16/2019ACANC
DetailsTroy Cobbley
The fire alarm permit did not get called in for inspection.

Jim Baker is the contact for this final inspection. We are trying to coordinate with Crane Alarm. We are hoping for a 12:30 time slot. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in4/12/20194/12/20194/12/2019PPART
DetailsJim Page
Previously noted items have been corrected, rough in inspection for scope of work sudstantially complete, a follow up inspection will be required when existing paint booth is removed and fire sprinklers are provided.
INSP-Sprinkler Rough-in/Hydro4/11/20194/12/20194/12/2019ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

Jim Baker is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in4/11/20194/12/20194/11/2019ACANC
DetailsJim Page
Jim Baker is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in4/9/20194/10/20194/10/2019AFAIL
DetailsJim Page
Provide fire sprinkler in entry that was enclosed between buildings. Provide freeze protection for main and heads between buildings, doorway was enclosed, no heating in area between buildings. Include extra 6 inch 90 on riser main to duct heads that is not shown on the city approved drawings. Install missing retaining straps. Remove cover material in office area that was installed. Provide city approved drawings for remaining building, not just the paint booth. Install high temperature heads that are above heaters. Heads next to old paint booth wall are over 9 foot from wall as well as heads outside of old paint booth entry, heads a over 8 foot off of wall, heads are overspaced. Install flexible vic couplings on risers/riser nipples where required throughout sprinkler system.

Jim Baker is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in4/1/20194/1/20194/1/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in paint-booth itself is complete, overhead filters can be placed, no use of the paint booth is authorized until final inspections are complete.

Jeff Chaney is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in2/28/20193/4/20193/4/2019PFAIL
DetailsJim Page
Office fire sprinkler piping does not match city approved drawings. 2 inch teardrop hangers on 4 inch main trapeze needs to be changed to the correct heavy duty type hangers. Hanger attachment in pit under paint booth does not match any of the submitted attachment methods. Provide fire sprinklers under overhead doors by paint booth. Verify added 90's on 6 inch will work with calcs. Add fire sprinklers btween paint booth and main building, no sprinklers in mentioned area at time of inspection and buildings are connected. Provide and submit heat calculations to verify upright heads will not freeze in attic space and area between main building and paint booth.


Austin Farnsworth is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in2/28/20193/4/20192/28/2019ACANC
DetailsJim Page
Austin Farnsworth is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro2/27/20192/28/20192/28/2019PPASS
DetailsTroy Cobbley
Overhead hydro test witnessed with no visible loss of pressurel. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro2/27/20192/28/20192/27/2019ACANC
DetailsJim Page