Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD16-02899
StatusFinaled
Name K2 CONSTRUCTION
Site Address 350 S ALLUMBAUGH WAY
Project NameGrace Memory Care
Customer NumberCUP07-00126
ePlanReviewNo
Description
(MORNINGSTAR MEMORY CARE AT ENGLEFIELD) MODIFICATION TO ADD HVAC SCREENING"" ""MODIFICATION TO INCLUDE CHANGING THE STUCCO SOFFITS TO ALUMINUM WITH TWO LAYERS OF 5/8 TYPE GYPSUM FOR THE ONE HOUR SOFFIT.""Permit for the construction of a new 43,986 sq. ft. memory care building with 50 dwelling/sleeping units, a commercial kitchen, associated dining areas, a theater room, coffee bar and an activity room and two outdoor courtyards per the approved plans and the attached engineering. This building is to be fire sprinklered with a NFPA 13 system with an alarm and shall comply with NFPA 13 and 72 as required by the Boise City Building department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/22/201710/16/2017 DONE
This permit finaled on the web by Melanie Kreizenbeck
First Notice9/29/20179/29/201710/12/2017 DONE
DetailsMike Jordan
Mailed 10-13-17
BLD-Final9/29/20179/29/20179/29/2017PPASS
DetailsMike Jordan
Ok for perm occ.
DOC - Permit Finaled9/29/20179/29/20179/29/2017PPASS
DetailsMike Jordan
(This activity was added in error so we have changed the case status back to Issued.)
BLD-Final9/28/20179/29/20179/29/2017APASS
DetailsMike Jordan
Late morning - Doug Phone #: ###-####
Zoning Approval9/29/20179/29/20179/29/2017 PASS
DetailsKatelyn Menuge
Design Review Final
Permanent Occupancy  9/29/2017 DONE
OVERRIDE  9/28/2017  
OVERRIDE  9/28/2017  
Plan assigned to (CDM)9/20/20179/20/20179/28/2017 PASS
DetailsCarl D Madsen
Routing - Design Review9/28/2017 9/28/2017 PASS
DetailsKatelyn Menuge
Mechanical Screen Mod DRH17-00428
Routing - PLAN CHECK9/28/2017 9/28/2017 PASS
DetailsCarl D Madsen
Case Summary (BLD)  9/28/2017 DONE
Permit Ready to Issue  9/28/2017 DONE
DetailsChristina Prado
Plan Mod approved, all requirements met

DO NOT RE-ISSUE
Telephone call  9/28/2017 DONE
DetailsChristina Prado
Called Doug to advise permit is ready and gave fees due
(F) Reprint permit  9/28/2017 DONE
DetailsChristina Prado
CHANGE STATUS TO (ISS)  9/28/2017 DONE
Plan resubmittals received  9/20/2017 DONE
Two copies of Structural Edge Engineering packs, two copies of sheets A2.5 and A5.0 taken to Carl M
PubWorks Occupancy Approval9/18/20179/18/20179/18/2017 DONE
DetailsTiffany Lowery
Temporary Occupancy9/14/201712/13/20179/14/2017 DONE
DetailsChristina Prado
BLD-Final9/12/20179/13/20179/13/2017APASS
DetailsMike Jordan
Temp Occupancy-Herb Phone #: ###-####. Temp occ granted at this time. Will be ok for perm occ. once zoning and public works has signed perm.occ.
BLD-Final9/13/20179/13/20179/13/2017PCANC
DetailsMike Jordan
Zoning Approval Temp9/13/20179/13/20179/13/2017 PASS
DetailsKatelyn Menuge
Temporary Approval- BND17-00086
FIRE-Final Inspection9/8/20179/11/20179/11/2017APASS
DetailsTroy Cobbley
Life safety passed
Zoning Approval9/8/20179/11/20179/8/2017 FAIL
DetailsSarah Schafer
There were several items not completed. They are as follows:
1. Mechanical equipment adjacent to the residential on the back side is visible. No modification was processed to show and on site construction documents show mechanical equipment hidden. Contractor must obtain DR approval of a mechanical screen and bond for its installation prior to a TEMPORARY sign off.
2. Landscape not complete. Trees not in planters up front, landscape at the rear not complete.
3. Stucco of the foundation not complete at the time of inspection.
4. Drainage was run over by a truck at the rear of the property and was needing to be dug out and reinstalled.
BLD-Conference9/7/20179/7/20179/7/2017PPEND
DetailsMike Jordan
Herb Phone #: ###-####. Needs zoning and public works.
FIRE-Final Inspection9/7/20179/7/20179/7/2017PPART
DetailsTroy Cobbley
A temporary for life safety is being given until the project related fire alrm permit has been finaled and the fire dept access signage is provided and NFPA signage at the Oxygen Room door. Herb provided what appears to be compliant hardware for the Kitchen door.

Herb Phone #: ###-####
FIRE-Conference9/6/20179/6/20179/6/2017PDONE
DetailsTroy Cobbley
Performed the rest of the life safety today. I need the project related fire alarm pemit finaled, NFPA signs for the oxygen room, provide fire dept access signage at the south entrance.
FIRE-Conference9/5/20179/5/20179/5/2017PDONE
DetailsTroy Cobbley
Started on life safety this morning. We tested exit signs and emergency lighting. I noted the two Garden area devices did not function. On a afternoon return trip the electrician had repaired the devices. No other items have been inspected yet since the bulk of time has been spent on the project related fire alarm permit.
FIRE-Final Inspection8/31/20179/1/20179/1/2017ACANC
DetailsTroy Cobbley
Herb Phone #: ###-####
BLD-Conference9/1/20179/1/20179/1/2017PNR
DetailsJim Sly
Herb Phone #: ###-####
BLD-Final8/31/20179/1/20179/1/2017PCANC
DetailsBrandon Shaw
Herb Phone #: ###-####
FIRE-Final Inspection8/29/20178/30/20178/30/2017AFAIL
DetailsTroy Cobbley
Todays inspection was just for a conference for the center portion of the building. I noted acouple of smoke detectors with issues.

Herb Phone #: ###-####
FIRE-Conference8/15/20178/16/20178/16/2017ADONE
DetailsTroy Cobbley
Herb, myself and Mike Jordan did a courtesy walk through one the north and south thirds of the building. I noted missing notificaton devices and two strobes overspaced.

Phone #: ###-####
BLD-Conference8/16/20178/16/20178/16/2017PCANC
DetailsMike Jordan
BLD-Conference8/16/20178/16/20178/16/2017APART
DetailsMike Jordan
walk through for final on north and south wings rooms only.
BLD-Energy code compliance7/17/20177/18/20177/18/2017APASS
DetailsMike Jordan
Herb Phone #: ###-####. Remainder of canlight protection and exterior walls in central great room ok.
FIRE-Conference7/12/20177/12/20177/12/2017ADONE
DetailsKatie Marron
Phone Call with K2 Construction on occupant load signs and how only one per assembly room/space is required.
BLD-Other7/11/20177/11/20177/11/2017PPART
DetailsMike Jordan
Work in progress on providing 2 layers of 5/8 type x rock on can lights in horizontal roof/ceiling assembly.
BLD-Other7/10/20177/11/20177/11/2017ANR
DetailsMike Jordan
fire damping- round 12pm- Herb Phone #: ###-####.
BLD-Framing/Rough-in6/28/20176/28/20176/28/2017PCANC
DetailsMike Jordan
BLD-Framing/Rough-in6/28/20176/28/20176/28/2017APASS
DetailsMike Jordan
5/8 type x sheet rock wraps for 1hr. protection on columns and beams in central great room.
BLD-Framing/Rough-in6/20/20176/21/20176/21/2017PCANC
DetailsMike Jordan
BLD-Framing/Rough-in6/20/20176/21/20176/21/2017ACANC
DetailsMike Jordan
BLD-Other6/9/20176/9/20176/9/2017PPART
DetailsBrandon Shaw
Fire proofing // Herb Phone #: ###-####
Can lights in gathering rooms 3&4- two layer
Ceiling @ shower furr outs Rm- 131, 132, 135, 136, 130, & 127- two layers.
BLD-Framing/Rough-in6/7/20176/7/20176/7/2017PCANC
DetailsMike Jordan
BLD-Energy code compliance6/1/20176/1/20176/1/2017PPART
DetailsMike Jordan
Herb Phone #: ###-####
BLD-Framing/Rough-in5/31/20175/31/20175/31/2017PCANC
DetailsMike Jordan
BLD-Framing/Rough-in5/31/20175/31/20175/31/2017APASS
DetailsMike Jordan
Can lights at south half of building know has 2layers of 5/8type x rock for roof/ceiling assembly, ok. north soffits double layer of 5/8 type x ok.
BLD-Framing/Rough-in5/23/20175/24/20175/24/2017PPART
DetailsMike Jordan
2hr. fire barrier wall at east wing at parpet has been repaired ok. Smoke barrier wall above ceiling ok. Noted the can lights only have 1 layer of 5/8 type x rock around them in roof/ceiling assembly. Two layers are required or an UL listed and approved cover.
BLD-Conference5/23/20175/24/20175/24/2017ACANC
DetailsMike Jordan
BLD-Energy code compliance5/23/20175/24/20175/24/2017APASS
DetailsMike Jordan
Herb Phone #: ###-####. Rooms 103 to 111 and rooms120 to 123.
BLD-Framing/Rough-in5/24/20175/24/20175/24/2017APASS
DetailsMike Jordan
Herb Phone #: ###-####. Rooms 103 to 111 and rooms 120 to to123.
BLD-Framing/Rough-in5/10/20175/17/20175/17/2017PCANC
DetailsMike Jordan
BLD-Framing/Rough-in5/10/20175/17/20175/17/2017APART
DetailsMike Jordan
!hr soffit at east side of building complete and ok. 2hr . fire wall above ceiling east and west wings needs to have penetrations removed at roof deck within the 4ft. Smoke barrier west wing above ceiling needs to firestop sprinkler pipe.
BLD-Framing/Rough-in5/3/20175/10/20175/10/2017PCANC
DetailsMike Jordan
BLD-Framing/Rough-in5/3/20175/10/20175/10/2017ACANC
DetailsMike Jordan
BLD-Framing/Rough-in5/1/20175/3/20175/3/2017APASS
DetailsMike Jordan
Rated exterior soffits at south and south-east areas of building ok.
BLD-Framing/Rough-in5/2/20175/2/20175/2/2017PPASS
DetailsMike Jordan
Exterior shear walls ok.
BLD-Wall Bracing5/2/20175/2/20175/2/2017PPASS
DetailsMike Jordan
exterior wall bracing ok.
BLD-Framing/Rough-in5/1/20175/2/20175/2/2017ANR
DetailsMike Jordan
BLD-Energy code compliance4/28/20175/1/20175/1/2017APASS
DetailsMike Jordan
Herb Phone #: ###-####. Rooms 113 to 119 ok.
BLD-Framing/Rough-in4/28/20175/1/20175/1/2017APASS
DetailsMike Jordan
Herb Phone #: ###-####. Rooms 113 to 119 ok.
BLD-Other4/27/20174/27/20174/27/2017PPASS
DetailsMike Jordan
smoke wall insp// Herb Phone #: ###-####. Smoke barrier, east wing abve ceiling grid ok.
BLD-Framing/Rough-in4/25/20174/26/20174/26/2017PCANC
DetailsMike Jordan
BLD-Framing/Rough-in4/25/20174/26/20174/26/2017ACANC
DetailsMike Jordan
BLD-Energy code compliance4/24/20174/25/20174/25/2017APASS
DetailsMike Jordan
Herb Phone #: ###-####. Rooms 127 to 133 ok.
BLD-Framing/Rough-in4/25/20174/25/20174/25/2017APASS
DetailsMike Jordan
Herb Phone #: ###-####. Rooms 127 to 13 ok.
BLD-Framing/Rough-in4/19/20174/20/20174/20/2017PCANC
DetailsMike Jordan
BLD-Framing/Rough-in4/19/20174/20/20174/20/2017ACANC
DetailsMike Jordan
BLD-Framing/Rough-in4/18/20174/19/20174/19/2017PCANC
DetailsMike Jordan
BLD-Energy code compliance4/19/20174/19/20174/19/2017PPASS
DetailsMike Jordan
Exterior walls at south wing and east wing south half.
BLD-Conference4/18/20174/19/20174/19/2017ACANC
DetailsMike Jordan
OVERRIDE  4/11/2017  
Print Occupancy Form  4/11/2017 DONE
Telephone call  4/11/2017 DONE
Left a message for Doug informing him that his plan modification is ready to be picked up and the fee amount due for re-issuance
CHANGE STATUS TO (ISS)  4/11/2017 DONE
(F) Reprint permit  4/11/2017 DONE
Permit Ready to Issue  4/11/2017 DONE
DO NOT RE ISSUE PLAN MOD
Plan assigned to (CDM)3/15/20173/15/20174/10/2017 PASS
DetailsCarl D Madsen
Plan resubmittals received  4/10/2017 DONE
resubmittal to plan mod received 2 sets of sheets A4.2 & A4.3
took to Carl M
Case Summary (BLD)  4/10/2017 DONE
BLD-Framing/Rough-in4/4/20174/5/20174/5/2017PPART
DetailsMike Jordan
Framing inspection on south wing rooms and east wing rooms,South half. Needs to complete all lateral bracing, nail off all simpson hangars, provide additional studs and squash blocking under 2ply girder bearing. Complete the idividual encasement for 1 hr. protection on columns and complete all fire caulking. Work is still in progress in these areas. All rough ins except for electrical have been completed. Aslo Needs to provide the sheetrock at ceiling in concealed areas for 1hr. roof/ceiling assembly.
BLD-Framing/Rough-in4/5/20174/5/20174/5/2017PPASS
DetailsMike Jordan
Remaining roof nailing completed and ok to cover.
BLD-Framing/Rough-in4/4/20174/5/20174/5/2017ACANC
DetailsMike Jordan
BLD-Framing/Rough-in4/4/20174/4/20174/4/2017PPASS
DetailsMike Jordan
Roof nailing around courtyard #1 ok.
BLD-Wall Bracing4/3/20174/4/20174/4/2017ANR
DetailsMike Jordan
Herb Phone #: ###-####. roof nailing, moved to pm. inspection.
Routing - PLAN CHECK3/16/2017 4/3/2017 FAIL
DetailsCarl D Madsen
The soffits are not allowed to be reduced in rating as they are required to be a minimum of 1 hour per building construction type VA.
Routing - Design Review3/16/2017 3/21/2017 PASS
DetailsSarah Schafer
Plan Modification Accepted  3/15/2017 DONE
DetailsChristina Prado
Plan Mod to change approved soffit from stucco to aluminum
BLD-Other3/8/20173/9/20173/9/2017APASS
DetailsMike Jordan
Roof nailing - Herb Phone #: ###-####. North wing, south side ok to cover.
BLD-Framing/Rough-in3/3/20173/6/20173/6/2017PPASS
DetailsMike Jordan
Herb//this is for shear nailing roof Phone #: ###-####. Roof nailing north wing and north west wing. Nailing edge nailing and nailing on drag trusses ok.
BLD-Footing2/16/20172/17/20172/17/2017APART
DetailsJim Sly
Herb Phone #: ###-####
Thickened footings at slab. OK pending Geotech special inspections, tests and approvals.
BLD-Final2/2/20172/3/20172/3/2017ACANC
DetailsMike Jordan
Herb Phone #: ###-#### **not sure this should be a final. herb said roof, but didn't sound too sure**
BLD-Framing/Rough-in2/3/20172/3/20172/3/2017APASS
DetailsMike Jordan
Herb Phone #: ###-#### **not sure this should be a final. herb said roof, but didn't sound too sure**. Roof nailing ok.
BLD-Framing/Rough-in1/17/20171/17/20171/17/2017PPART
DetailsMike Jordan
Work in progress on roof sheeting.
BLD-Ceiling Grid Inspection1/13/20171/17/20171/17/2017ACANC
DetailsMike Jordan
Herb Phone #: ###-####. Moved to pm.
BLD-Other1/11/20171/12/20171/12/2017PPASS
DetailsMike Jordan
Herb-roof nailing scheduling Phone #: ###-####. South east portion ok.
Telephone call  1/9/2017 DONE
called Mike Jordan to let know i changed his footing inspection from here to BLD16-03666 (foundation permit)
OVERRIDE  11/17/2016  
Telephone call  11/17/2016 DONE
called Doug to let know permit is ready and that we need the ACHD, GC & Rev cert of val-left message on Dougs phone
Issue PAID IN FULL permit  11/17/2016 DONE
Print Occupancy Form  11/17/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/17/2016 DONE
Print Occupancy Form  11/17/2016 DONE
Permit Ready to Issue  11/17/2016 DONE
NEED ACHD, GC and Certificate of value
Routing - PLAN CHECK11/8/2016 11/17/2016 PASS
DetailsCarl D Madsen
Plan resubmittals received  11/15/2016 DONE
resubmittals recieved 2 response letters & 2 of sheets A2.0, A2.1, A2.2 & A10.0-took to Carl M
Routing - Design Review11/14/2016 11/14/2016 PASS
DetailsJosh Wilson
Routing - FIRE11/8/201611/8/201611/9/2016 PASS
DetailsKatie Marron
Revised report attached to plans.
Routing - MECHANICAL11/8/2016 11/8/2016 PASS
DetailsTroy James
Routing - PLUMBING11/8/2016 11/8/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Plan resubmittals received  10/31/2016 DONE
received two full sets of plans and two copies of response to plan checker (Carl M and Katie) -put on Carl's desk
Plan assigned to (CDM)8/10/20168/11/201610/4/2016 PASS
DetailsCarl D Madsen
Plan resubmittals received  10/4/2016 DONE
resubmfittals received 3 sets of sheet A2.3 & A2.4-took to Carl M
Routing Off Site - STRUCTURAL10/3/2016 10/3/2016 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL9/21/2016 9/30/2016 FAIL
DetailsCarl D Madsen
Route to Impact Fee Review9/27/20169/30/20169/29/2016 PASS
DetailsCindy M. Gould
Routing - FIRE9/23/20168/10/20169/27/2016 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
1st review completed  9/27/2016 FAIL
DetailsCarl D Madsen
Failed Fire, Plan Check, Plumbing, Mechanical
Plan resubmittals received  9/22/2016 DONE
Additional engineering calculation sent in via E-Mail CDM 9-22-16
Routing - PLAN CHECK  9/21/2016 FAIL
DetailsCarl D Madsen
Plan resubmittals received  9/16/2016 DONE
Two copies of sheets A2.1, A2.2, A6.0, A6.1 and A6.2. Taken to Carl M
Plan resubmittals received  9/9/2016 DONE
Two copies of sheets C2.1, M1.0, M2.0 and M3.0. Taken to Carl M
Routing - MECHANICAL8/30/2016 9/7/2016 FAIL
DetailsTroy James
emailed corrections to engineer and architect
Routing - PLUMBING  9/2/2016 CANC
DetailsBill VanDegrift
storm water piping under the building must be schedule 40. Schedule 40 pipe has been indicated on the civil plans for the storm drains under the building. OK to issue foundation Per Bill V. CDM 10-4-16
Routing - PUBLIC WORKS  8/30/2016 PASS
DetailsRachael Beierle
Routing - PLANNING8/30/2016 8/30/2016 PASS
DetailsCody Riddle
Routing - Design Review8/30/2016 8/30/2016 PASS
DetailsJosh Wilson
Routing - Erosion and Sediment8/30/2016 8/30/2016 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

(GRACE MEMORY CARE @ ENGLEFIELD GREEN) For the construction of a 43,986 sq. ft. memory care facility with 50 units. (Approximately 2 Acres of Expected Disturbance)
Routing PW Street Lights8/30/2016 8/30/2016 PASS
DetailsTom Marshall
Routing PW Drainage8/16/2016 8/30/2016 PASS
DetailsBrian Murphy
Routing Off Site - STRUCTURAL8/10/2016 8/30/2016 FAIL
DetailsCarl D Madsen
Routing PW Solid Waste8/15/2016 8/16/2016 PASS
DetailsPeter J. McCullough
Existing Enclosure
Routing PW Environmental8/15/2016 8/16/2016 PASS
DetailsRick Christenson
1500 Gallon Exterior Interceptor Shown
Routing - PLANNING Land Div8/10/2016 8/15/2016 PASS
DetailsTodd Tucker
Routing - Addressing8/15/2016 8/15/2016 PASS
DetailsLaura Hunter
Routing PW Sewer Rating8/15/2016 8/15/2016 PASS
DetailsRachael Beierle
WEST BOISE SEWER DISTRICT. MUST CONTACT WBSD FOR SEWER PERMIT. ###-####
Intake Approval  8/10/2016 PASS
DetailsCarl D Madsen
Recd Pcfee & Taken To Pln CK  8/10/2016 DONE
Intake Approval  8/8/2016 FAIL
DetailsDavid Ferguson
See scanned #502 checklist for items outstanding.
Meeting  8/8/2016 DONE
Received Appendix J. Taken to Brian Mu
Application received 8/8/2016