Third Notice | | 7/14/2020 | 8/11/2020 | | DONE |
|
|
|
mailed 8-14-2020
|
Third Notice | | 5/12/2020 | 7/9/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
Second Notice | | 4/13/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
First Notice | 3/4/2020 | 3/4/2020 | 4/3/2020 | | DONE |
Tell Riley
|
|
|
mailed 4-6-2020
|
BLD-Final | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | DONE |
Tell Riley
|
|
|
Doyle Phone #: ###-####//final complete per description/scope//landscaping will be completed to remove dirt/vegitation from near siding//
|
DOC - Permit Finaled | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | NR |
Tell Riley
|
|
|
Doyle Phone #: ###-####//no roofing on door cover or any accents//
|
BLD-Final | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | CANC |
Tell Riley
|
|
|
Dole Phone #: ###-####//needs electrical final prior to building final//let contact know//
|
FIRE-Final Inspection | 2/5/2020 | 2/5/2020 | 2/5/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Doyle Phone #: ###-####
|
FIRE-Conference | 1/16/2020 | 1/16/2020 | 1/16/2020 | P | DONE |
Troy Cobbley
|
|
|
The phone conferenced with the geal contractor about the possible need for a sprinkler contractor to to determine whether sprinkler coverage is needed in the new construction areas.
|
BLD-Framing/Rough-in | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Tell Riley
|
|
|
Doyle- call for access Phone #: ###-####//final framing for wall accents, installed ledgers with lags and a 35 clips per plans//sheathing was installed at time of inspeciton//
|
BLD-Framing/Rough-in | 12/23/2019 | 12/24/2019 | 12/24/2019 | A | PASS |
Tell Riley
|
|
|
Doyle Phone #: ###-####//south wall in courtyard accent framing//
|
BLD-Framing/Rough-in | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PART |
Tell Riley
|
|
|
Call half hour before // Doyle Phone #: ###-####//gyp board on side entry per details//north wall in courtyard framing of accents ok//
|
CHANGE STATUS TO (ISS) | | | 12/19/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | FAIL |
Tell Riley
|
|
|
call ahead // Doyle Phone #: ###-####//side entry cover--need to add 1 hr over structural beams per plans//
|
Permit Ready to Issue | | | 12/18/2019 | | DONE |
|
|
|
PLAN MOD
|
Plan assigned to (Joe) | 12/5/2019 | 12/5/2019 | 12/17/2019 | | PASS |
Joe Bruce
|
|
|
(plan mod) Heatherwood Senior Living
|
Routing - PLAN CHECK | 12/10/2019 | | 12/17/2019 | | PASS |
Joe Bruce
|
|
|
PLAN MOD - Removed fire rating from non-structural elements.
|
BLD-Framing/Rough-in | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | PART |
Tell Riley
|
|
|
Call 30 minutes ahead // Doyle Phone #: ###-####//plan change on wall accents--advised Doyle to submit for plan mod to plan review//
|
Plan Modification Accepted | | | 12/5/2019 | | DONE |
|
|
|
removed the need to fire rate the soffits on the non structural over builds and surface applied eyebrow roofs. these are all non structural items and do not effect the existing fire rating of the walls
|
BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | PART |
Tell Riley
|
|
|
Call 30 mins ahead- Doyle Phone #: ###-####//parapet wall ok//wall accent framing ok--need to add 1 hr protection per plans and call for verifiction//side entry framing ok--add 1 hr rated assembly per plans and call for inspection//
|
BLD-Framing/Rough-in | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | NR |
Tell Riley
|
|
|
on parapet wall - Doyle Phone #: ###-####//discussed parapet wall framing//will call when framing is completed//
|
BLD-Framing/Rough-in | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Tell Riley
|
|
|
Call 30 minutes ahead // Doyle Phone #: ###-####//fire rated covers have been fixed//framing for cover ok//framing inspections for other areas will be required/
|
BLD-Framing/Rough-in | 10/7/2019 | 10/8/2019 | 10/8/2019 | A | PART |
Tell Riley
|
|
|
Doyle-please call when on way Phone #: ###-####//fire rated can light covers need to sit flat to ceilng--some have gaps under them//call in for re-inspection//ok to begin cover//
|
BLD-Framing/Rough-in | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | FAIL |
Tell Riley
|
|
|
call 30 mins before // dowel Phone #: ###-####//need electrical sign off//fire proofing at can lights not approved--use approved fire proofing//call for re-inspection//
|
BLD-Footing | 10/1/2019 | 10/2/2019 | 10/2/2019 | P | PASS |
Tell Riley
|
|
|
Doyle-please call when on way Phone #: ###-####//ok to pour//special inspection was performed for dowels epoxied into footing//
|
BLD-Footing | 9/30/2019 | 10/1/2019 | 10/1/2019 | P | PART |
Tell Riley
|
|
|
call when you are on your way- Dole Phone #: ###-####//footings for cover already poured//oversized from plans//verts will be drilled and epoxied--special inspection required//call for foundation inspection//
|
Plan Reviewer's activity | | | 9/30/2019 | | DONE |
|
|
|
Approved an alternate 1-hr roof/ceiling assembly for the porte cochere. CJW
|
BLD-Framing/Rough-in | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | FAIL |
Tell Riley
|
|
|
Call half hour before // Doyle Phone #: ###-####//1 hr ceiling does not meet details on plans//submit plan mod for changes in fire rated ceiling//verify penetrations for cans in rated ceiling//
|
BLD-Framing/Rough-in | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | FAIL |
Tell Riley
|
|
|
Doel Phone #: ###-####//no framers onsite//appears to be front entry cover--framing is not visible as framing has already been covered//call for re-inspection//
|
BLD-Framing/Rough-in | 9/23/2019 | 9/25/2019 | 9/24/2019 | A | CANC |
Tell Riley
|
|
|
Doyle -per Doyle need to cancel inspection
|
BLD-Framing/Rough-in | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PART |
Tell Riley
|
|
|
Doyle Phone #: ###-####//north wing framing of exterior accents ok per plans//ad fire blocking as discussed//call for other wings framing inspections//
|
Issue PAID IN FULL permit | | | 8/2/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/2/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 6/13/2019 | 6/13/2019 | 7/30/2019 | | PASS |
Joe Bruce
|
|
|
07/31 (3rd Rev) 06/25 (L2) Heatherwood Senior Living, ePlan (Struc)
|
Routing Off Site - STRUCTURAL | 7/24/2019 | | 7/30/2019 | | PASS |
Joe Bruce
|
|
|
AHJ
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/30/2019 | | DONE |
|
|
|
Need MET
Revised Cert of Value
(***DOC FINAL early start permit after issuance of this permit BLD19-02200)
|
Plan resubmittals received | | | 7/24/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 7/16/2019 | | 7/22/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ - Not all comments were responded to please see the original comments as well as an added comment to one of the original comment. Please provide a written response to the structural comments.
|
Plan resubmittals requested | | | 7/22/2019 | | DONE |
Joe Bruce
|
|
|
Structural comments required for a resubmittal.
|
Plan resubmittals received | | | 7/16/2019 | | DONE |
Joe Bruce
|
|
|
Architect revised sheet A2.0 to have city stamping area clear.
|
Routing - PLAN CHECK | 7/16/2019 | | 7/16/2019 | | PASS |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 7/15/2019 | | FAIL |
Joe Bruce
|
|
|
Please provide the following so we can accept your resubmittal:
1) Plan sheet A2.0 does not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. The structural engineers stamp is obstructing the space designated for the city stamp. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block.
|
Routing - FIRE | 6/13/2019 | 6/13/2019 | 6/25/2019 | | PASS |
Mark Scharfen
|
|
|
06.25.2019-Completed fire review. Made notation on plans. No report needed. Passed fire review.
|
Routing Off Site - STRUCTURAL | 6/13/2019 | | 6/25/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ
|
1st review completed | | | 6/25/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 6/25/2019 | | DONE |
Joe Bruce
|
|
|
Emailed Architect Plan Review Report.
|
Routing - PLAN CHECK | 6/13/2019 | | 6/24/2019 | | FAIL |
Joe Bruce
|
|
|
See plan review report for corrections required.
|
Intake Approval | | | 6/13/2019 | | PASS |
Michael Hanson
|
|
|
Prescreen approved my M_H. Early start issued under BLD19-02200 for window and siding portion of project.
|
Routing - Design Review | 6/13/2019 | | 6/13/2019 | | PASS |
Josh Wilson
|
|
|
No DR required- not in Design Review overlay
|
Intake Approval | | | 6/3/2019 | | FAIL |
Michael Hanson
|
|
|
Please provide planning and zoning approval letter. The DRH19-00227 listed in the application is a voided permit.
|
Application received | | | 5/30/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 30 2019 12:00AM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|