FIRE-Final Inspection | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for phase 3 and 4. Need the fire alarm addressed in these areas, Need exit signs and emergency lightys repaired.
Schedule with fire alarm at 7am. Thank you Phone #: ###-#### Inspection requested via web by tom mccalister
|
FIRE-Final Inspection | 8/3/2020 | 8/3/2020 | 8/3/2020 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was for the remodeled restrooms. The new fire alarm notification system needs to be extended into this remodeled area.
screened // TOm Phone #: ###-####
|
BLD-Framing/Rough-in | 7/31/2020 | 8/3/2020 | 8/3/2020 | A | PART |
Tell Riley
|
|
|
Give Tom a call when in route. Phone #: ###-#### Inspection requested via web by tom mccalister//phase 4 temp ok pending fire life safety temp//phase 5 framing of training room and vestibule ok per plans//
|
CHANGE STATUS TO (ISS) | | | 7/31/2020 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2020 | | DONE |
|
|
|
emailed the GC to inform them the 522 app stated the value is afftected and to please fill out another value 306 form and email it back.
|
BLD-Ceiling Grid Inspection | 7/20/2020 | 7/21/2020 | 7/21/2020 | A | PART |
Tell Riley
|
|
|
screened // Tom Phone #: ###-####//phase 4 restrooms and phase 5 hall and conference room, grid ok pending mechanical//
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 7/21/2020 | | DONE |
|
|
|
met
PLAN MOD -
need
Revised value (plan mod app states value changed)
|
Plan assigned to (M_H) | 7/6/2020 | | 7/21/2020 | | DONE |
Michael Hanson
|
|
|
07/10 Plan Mod - DHW
|
Routing - PLAN CHECK | 7/6/2020 | | 7/21/2020 | | PASS |
Michael Hanson
|
|
|
|
BLD-Ceiling Grid Inspection | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | NR |
Mike Jordan
|
|
|
Tom - */Screened*/ Phone #: ###-####. Needs fire sprinkler rough in inspection.
|
Plan Modification Accepted | | | 7/1/2020 | | DONE |
|
|
|
revised to create open workspace instead of individual offices. reception/office area revised to eliminate hallway. revised to retain one existing office and eleminate another. Revised to add staff meeting rood and additional meeting room at lobby
|
Plan assigned to (M_H) | 7/1/2020 | | 7/1/2020 | | DONE |
Michael Hanson
|
|
|
|
BLD-Framing/Rough-in | 6/16/2020 | 6/17/2020 | 6/17/2020 | A | PART |
Tell Riley
|
|
|
Tom *screened* Phone #: ###-####//Phase 4, two offices, ok per plans//
|
BLD-Framing/Rough-in | 6/10/2020 | 6/10/2020 | 6/10/2020 | P | PART |
Tell Riley
|
|
|
Screened- Tom Phone #: ###-####//phase 5- conference room--walls not full height per plan--Tom will provide details of using shorter braced walls per the architect// maintain 4'6" corridor width per the plans//phase 4 employee restrooms--center wall demo to increase size--no new framing--pending plumbing approval//
|
BLD-Ceiling Grid Inspection | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | PART |
Tell Riley
|
|
|
Screened // Tom Phone #: ###-####//phase 3 and a portion of phase 4//fix clips in areas noted prior to floodinng grid//
|
BLD-Framing/Rough-in | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | PART |
Tell Riley
|
|
|
Please give me a call when you are on your way. Phone #: ###-#### Inspection requested via web by tom mccalister//phase 3 restrooms and open work room, wall framing ok, add bracing at double/plumbing wall//
|
BLD-Framing/Rough-in | 4/9/2020 | 4/9/2020 | 4/9/2020 | P | PART |
Tell Riley
|
|
|
screened // Tom Phone #: ###-####//phase 3, 1 wall, ele passed//ok to cover//
|
BLD-Framing/Rough-in | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | PART |
Tell Riley
|
|
|
Tom Phone #: ###-####//area 3A walls ok to cover//
|
BLD-Final | 2/18/2020 | 2/19/2020 | 2/19/2020 | P | PART |
Tell Riley
|
|
|
Tom Phone #: ###-####//phase 2 temp occupancly approved//wall at start of phase 3 ok to cover//
|
FIRE-Final Inspection | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | PART |
Troy Cobbley
|
|
|
Life safety for phase 1 and phase 2 is complete.
Tom Phone #: ###-####
|
BLD-Final | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | CANC |
Tell Riley
|
|
|
Tom Phone #: ###-####//cancel per Tom//
|
FIRE-Final Inspection | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | CANC |
Troy Cobbley
|
|
|
Need the project related fire alarm permit finaled prior to a life safety sign off.
Tom Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/22/2020 | 1/23/2020 | 1/23/2020 | P | PART |
Tell Riley
|
|
|
TOM Phone #: ###-####//phase 2 grid//ok pending mechanical this afternoon//wing wall ok//
|
BLD-Framing/Rough-in | 12/26/2019 | 12/27/2019 | 12/27/2019 | P | PART |
Tell Riley
|
|
|
Tom Phone #: ###-####//phase 2 wall framing--areas without plumbing--ok to cover//
|
BLD-Final | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PART |
Tell Riley
|
|
|
Tom Phone #: ###-####//phase 1 temp occupancy approved//
|
FIRE-Final Inspection | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | PART |
Troy Cobbley
|
|
|
Life safety passed for Phase 1/Building B. Will need the project related fire alarm permit finaled prior to a Phase 1 sign off.
Tom Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | PART |
Tell Riley
|
|
|
Building B // Tom Phone #: ###-####//grid looks ok//pending mechanical inspection//
|
BLD-Framing/Rough-in | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PART |
Tell Riley
|
|
|
Tom Phone #: ###-####//moved wall 10 inches//new electrical inspection was completed//bracing ok//
|
BLD-Framing/Rough-in | 10/4/2019 | 10/7/2019 | 10/7/2019 | A | PART |
Tell Riley
|
|
|
Tom Phone #: ###-####//area B wall framing and demo//walls ok to cover area B only//plumbing and electrical approved///
|
Telephone call | | | 9/20/2019 | | DONE |
|
|
|
emailed fees on 9-19-19 to -office@sl-builders.com
|
Inspection Record Card- Bld | | | 9/20/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/20/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/17/2019 | 9/20/2019 | 9/18/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 9/18/2019 | | 9/18/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 9/18/2019 | | DONE |
|
|
|
ALL MET- NEED
GC FORM
REVISED VALUE
|
Plan assigned to (M_H) | 8/31/2019 | | 9/18/2019 | | DONE |
Michael Hanson
|
|
|
1st review completed - 09/11 #518 L2 ePlan - Dept.of Health & Welfare Remodel
|
Routing - FIRE | 8/31/2019 | 8/31/2019 | 9/17/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 9/17/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 8/31/2019 | | 9/13/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Routing - Addressing | 8/31/2019 | | 9/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/31/2019 | | 9/3/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Design Review | 8/31/2019 | | 9/3/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Intake Approval | | | 8/29/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 8/23/2019 | | FAIL |
Michael Hanson
|
|
|
Please provide Planning and Zoning approval letter for exterior modifications
|
Application received | | | 8/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 20 2019 3:10PM
|