General Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PART |
Michael Zawacki
|
|
|
Landscaping needs to be completed. Rocks currently stored on sidewalk and street.
|
General Inspection | 12/14/2018 | 12/14/2018 | 12/14/2018 | P | PASS |
Michael Zawacki
|
|
|
Major exterior work complete. Lot still needs landscaping, currently frozen. Rocks are being stored on the road and sidewalk.
|
General Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/1/2018 | 10/1/2018 | 10/2/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | | PASS |
Michael Zawacki
|
|
|
Site is clean, most outside framing complete. Site still has no stabalization.
|
General Inspection | 6/29/2018 | 6/29/2018 | 6/29/2018 | | PASS |
Michael Zawacki
|
|
|
Plumbers have trench in yard, want to have it closed before weekend. No dirt leaving site. Site is free from trash.
|
General Inspection | 5/14/2018 | 5/14/2018 | 5/14/2018 | | PEND |
Michael Zawacki
|
|
|
Site is contained, no dirt leaving site. Lots of lumber scraps that need to be cleaned from site.
|
Aging Inspection | 3/28/2018 | 3/28/2018 | 3/28/2018 | | PASS |
Michael Zawacki
|
|
|
Building materials delivered to site. No new disturbances.
|
DOC - Permit Finaled | 9/28/2017 | 9/28/2017 | 9/28/2017 | P | PASS |
Andy J. Long
|
|
|
permit expired. No activity. Any new activity will required new permits.
|
General Inspection | 9/11/2017 | 9/11/2017 | 9/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/25/2017 | 7/25/2017 | 7/25/2017 | | PASS |
Andy J. Long
|
|
|
No activity at site, sign posted saying it is for sale. No sediment runoff or hillside erosion issues. Will keep open, if project resumes with new contractor, new ESC permit shall be required.
|
General Inspection | 6/9/2017 | 6/9/2017 | 6/9/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 4/24/2017 | 4/24/2017 | 4/24/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 | | PASS |
Melissa Jannusch
|
|
|
No WIP
|
General Inspection | 2/22/2017 | 2/22/2017 | 2/24/2017 | | PASS |
Melissa Jannusch
|
|
|
No WIP
|
General Inspection | 2/7/2017 | 2/7/2017 | 2/8/2017 | | PASS |
Melissa Jannusch
|
|
|
No WIP.
|
General Inspection | 1/23/2017 | 1/23/2017 | 1/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/6/2017 | 1/6/2017 | 1/10/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/22/2016 | 12/22/2016 | 12/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/7/2016 | 12/7/2016 | 12/7/2016 | | CANC |
Andy J. Long
|
|
|
project inactive
|
General Inspection | 11/22/2016 | 11/22/2016 | 11/23/2016 | | PASS |
Andy J. Long
|
|
|
project is still inactive. No ESC violations or sediment leaving site. No activity of BLD permit since May 2016....
|
General Inspection | 11/7/2016 | 11/7/2016 | 11/7/2016 | | PASS |
Eric Strole
|
|
|
No activity
|
General Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 | | CANC |
Andy J. Long
|
|
|
site inactive. No issues observed 10/20
|
General Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 | | PASS |
Andy J. Long
|
|
|
No activity at site. Foundation has been built but no other work. Perimeter wattle installed and no sediment running off site.
|
General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 | | PASS |
Andy J. Long
|
|
|
No recent activity. No corrections needed at site at this time.
|
General Inspection | 9/6/2016 | 9/6/2016 | 9/6/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 8/19/2016 | 8/19/2016 | 8/19/2016 | | PASS |
Evan Jenkins
|
|
|
No issues observed
|
General Inspection | 8/4/2016 | 8/4/2016 | 8/4/2016 | | PASS |
Andy J. Long
|
|
|
No activity. Site currently stable. Perimeter wattle installed in the runoff location of lot.
|
General Inspection | 7/20/2016 | 7/20/2016 | 7/20/2016 | | PASS |
Evan Jenkins
|
|
|
work is in progress. no ESC issues observed at this time
|
General Inspection | 7/5/2016 | 7/5/2016 | 7/5/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/20/2016 | 6/20/2016 | 6/20/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/3/2016 | 6/3/2016 | 6/3/2016 | | PASS |
Evan Jenkins
|
|
|
|
BMP Violation | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed, sediment being carried off site to sidewalk and gutter.
1. Need to install sediment control wattle along the upper portions of the site along the sidewalk where stormwater is carrying sediment offsite. 2. Clean out receiving stormdrain below site and install sediment protection
|
General Inspection | 5/12/2016 | 5/12/2016 | 5/12/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/27/2016 | 4/27/2016 | 4/29/2016 | | PASS |
Andy J. Long
|
|
|
No activity. No violations.
|
General Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 | | PASS |
Evan Jenkins
|
|
|
corrections have been made
|
BMP Violation | 1/20/2016 | 1/21/2016 | 1/25/2016 | A | PEND |
Andy J. Long
|
|
|
|
BMP Violation | 1/15/2016 | 1/18/2016 | 1/20/2016 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|
BMP Violation | 1/13/2016 | 1/15/2016 | 1/15/2016 | P | PEND |
Andy J. Long
|
|
|
RP acknowledged correction requests issued and has started clean up process. Overnight snowfalls have delayed some operations since Wednesday. Will re-inspect early next week to check conditions after the foundation has been backfilled. Wattles will be reinstalled.
|
BMP Violation | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | FAIL |
Andy J. Long
|
|
|
2nd warning to RP
Corrections: - need to re-post yellow ESC sign - remove dirty/degraded wattle from street, improper use of BMP - sweep street, gutter, and sidewalk - empty out DI bag, replace/install new bag - install sediment control BMP along sidewalk and provide trash containment.
VM left to Michael with Azure Properties. Will reinspect Friday.
|
Random Inspection | 12/22/2015 | 12/22/2015 | 12/22/2015 | P | FAIL |
Andy J. Long
|
|
|
Need to conduct clean up of sediment and mud on sidewalk and gutter and collected at inlet. Install new inlet filter BMP.
Install perimeter wattles along the backfill adjacent to sidewalk. Has been inactive for well over 2 weeks.
Verbal CN issued to RP Michael
|
Site Preparation | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted. Wattles installed at toe of slope on lot and sidewalk boundary. Approved for excavation. WIP.
|