Site Final | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 6/26/2018 | 6/26/2018 | 6/26/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/11/2018 | 6/11/2018 | 6/11/2018 | | PASS |
Michael Zawacki
|
|
|
Complete and stable.
|
General Inspection | 5/25/2018 | 5/25/2018 | 5/25/2018 | | PASS |
Michael Zawacki
|
|
|
Everything complete, will final when building permit closed.
|
General Inspection | 5/10/2018 | 5/10/2018 | 5/10/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/25/2018 | 4/25/2018 | 4/26/2018 | | PASS |
Andy J. Long
|
|
|
Home is complete, yard is landscaped. Hillside vegetation bond issued. BLD open. Will check with BLD inspector on status. Home appears occupied.
|
General Inspection | 4/10/2018 | 4/10/2018 | 4/10/2018 | | PEND |
Michael Zawacki
|
|
|
Landscaper on site running skid steer, lots of trackout onto road. Talked to them and they said they will clean road and sidewalk at end of each work day.
|
General Inspection | 3/26/2018 | 3/26/2018 | 3/26/2018 | | PEND |
Michael Zawacki
|
|
|
Lots of runoff from side onto sidewalk. Some rills forming.
|
General Inspection | 3/9/2018 | 3/9/2018 | 3/9/2018 | | PASS |
Michael Zawacki
|
|
|
Front and side need landscaping. No erosion issues.
|
General Inspection | 2/22/2018 | 2/22/2018 | 2/22/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/7/2018 | 2/7/2018 | 2/7/2018 | | PASS |
Michael Zawacki
|
|
|
Lot just needs landscaping.
|
General Inspection | 1/23/2018 | 1/23/2018 | 1/23/2018 | | PASS |
Michael Zawacki
|
|
|
Home complete, retaining walls complete. Yard is still exposed. No issues or violations.
|
General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 | | PASS |
Michael Zawacki
|
|
|
Some concrete work in back and side. Dirt still exposed. Nothing leaving site and no violations at this time.
|
General Inspection | 12/22/2017 | 12/22/2017 | 12/22/2017 | | PASS |
Michael Zawacki
|
|
|
WIP. Yard is about half landscaped. All major earth moving activities are complete. No issues or violations.
|
General Inspection | 12/7/2017 | 12/7/2017 | 12/7/2017 | | PASS |
Michael Zawacki
|
|
|
Taljked to George whil on site. Front yard still needs landscaping, they are working on getting bond. Rock wall completed, pad poured in back yard and some sod down.
|
General Inspection | 11/22/2017 | 11/22/2017 | 11/22/2017 | | PASS |
Michael Zawacki
|
|
|
Front yard covered in plastic. No runoff from back.
|
General Inspection | 11/7/2017 | 11/7/2017 | 11/9/2017 | | PASS |
Andy J. Long
|
|
|
Frame complete, rooftop gutters and drainage installed. Landscaping to be completed next week. Trash contained, no trackout or discharge. RP George onsite. Approved.
|
General Inspection | 10/23/2017 | 10/23/2017 | 10/23/2017 | | PASS |
Michael Zawacki
|
|
|
Wall being built. No runoff signs after weekend rain.
|
General Inspection | 10/6/2017 | 10/6/2017 | 10/10/2017 | | PEND |
Michael Zawacki
|
|
|
Would like to see some wattle on south side slope above retaining wall to prevent erosion if rain event occurs. Trench dug on north side slope that will drain onto sidewalk. Would repair and add wattle or blanket to slow rain runoff. Area clean of trash and well maintained.
|
General Inspection | 9/21/2017 | 9/21/2017 | 9/22/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/6/2017 | 9/6/2017 | 9/8/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/22/2017 | 8/22/2017 | 8/22/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/4/2017 | 8/7/2017 | 8/10/2017 | A | PASS |
Andy J. Long
|
|
|
Wallboard material and dust in gutter and sidewalk has been swept. No trackout or discharges at site. No new corrections requested.
|
BMP Violation | 7/28/2017 | 7/31/2017 | 8/7/2017 | P | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 7/24/2017 | 7/27/2017 | 7/28/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/24/2017 | 7/24/2017 | 7/24/2017 | | FAIL |
Andy J. Long
|
|
|
Corrections needed:
- sweep up wall board residue that is on sidewalk and in gutter. Request to sweeping entire gutter to receiving storm drain.
- empty trash, currently over full.
Reinspection scheduled 7/27. VM left with RP-GC George.
|
General Inspection | 7/7/2017 | 7/7/2017 | 7/7/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 6/22/2017 | 6/22/2017 | 6/22/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP on interior and exterior. Trash contained. No trackout or runoff. No corrections.
|
General Inspection | 6/7/2017 | 6/7/2017 | 6/7/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP on interior and exterior. No trackout, sign is posted. No corrections.
|
General Inspection | 5/23/2017 | 5/23/2017 | 5/23/2017 | P | PASS |
Melissa Jannusch
|
|
|
Vertical WIP. No trackout leaving site. No other ESC issues.
|
General Inspection | 5/19/2017 | 5/19/2017 | 5/22/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/4/2017 | 5/4/2017 | 5/4/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 | | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 3/7/2017 | 3/8/2017 | 3/9/2017 | P | FAIL |
Melissa Jannusch
|
|
|
Work has been occurring on foundation. No WIP during inspection No site preparation was scheduled. The road and sidewalk are clean. Sign posted. The perimeter wattle has not been installed. RP did not answer and mailbox is full. No answer from owner. Need to install perimeter wattle to pass site inspection.
|