Permit Information
Permit NumberESC17-01595
StatusFinaled
Name CAMERON A BROWN
Site Address 2460 E PARKSIDE DR
Project NameParkside Dr.Residence
Customer Number 
ePlanReviewNo
Description
Per Attached ESC Conditions. Stabilized construction access and staging area required to prevent trackout. Install hillside erosion controls and perimeter sediment controls per plan or as necessary. Site preparation inspection is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection1/8/20201/8/20201/8/2020 CANC
DetailsMichael Zawacki
DOC - Permit Finaled1/8/20201/8/20201/8/2020PPASS
DetailsMichael Zawacki
General Inspection12/24/201912/24/201912/24/2019 PASS
DetailsMichael Zawacki
Site looks nearly landscaped, No issues
General Inspection12/9/201912/9/201912/9/2019 PASS
DetailsAndy J. Long
WIP. No trackout or discharges observed. Project near completion.
General Inspection11/22/201911/22/201911/22/2019 PASS
DetailsMichael Zawacki
Home exterior looks completed, site landscaped.
General Inspection11/7/201911/7/201911/14/2019 CANC
DetailsAndy J. Long
General Inspection10/23/201910/23/201910/23/2019 PASS
DetailsMichael Zawacki
Home exterior nearly complete.
Driveway has been poure to where the sidewalk will be. Sidewalk and apron still need to be poured, no dumped washout on site. No landscaping done, no dirt leaving site.
General Inspection10/8/201910/8/201910/9/2019 CANC
DetailsAndy J. Long
General Inspection9/23/20199/23/20199/23/2019 PASS
DetailsAndy J. Long
WIP. No trackout, discharges. RP on site.
General Inspection9/6/20199/6/20199/6/2019 PART
DetailsMichael Zawacki
Road clean, sidewalk covered in dirt.
General Inspection8/22/20198/22/20198/22/2019 PASS
DetailsMichael Zawacki
Doing interior trim work. Outside is tight, no major ESC issues, not much room for anything.
General Inspection8/7/20198/7/20198/7/2019PFAIL
DetailsAndy J. Long
Dirty sidewalk and gutter.

Request to sweep up gutter, sidewalk, and shovel dried up drywall slurry visible in gutter.

Verbal correction to onsite crew and phone call to RP.
General Inspection7/31/20197/31/20197/31/2019 PASS
DetailsMichael Zawacki
WIP on interior. Home has scaffolding around it. Site clean, no issues.
General Inspection7/16/20197/16/20197/16/2019 CANC
DetailsAndy J. Long
General Inspection7/1/20197/1/20197/2/2019 PASS
DetailsAndy J. Long
No trackout or discharges. Down gradient sediment controls installed. Trash contained. Approved.
General Inspection6/14/20196/14/20196/17/2019 CANC
DetailsAndy J. Long
General Inspection5/30/20195/30/20195/30/2019 PASS
DetailsAndy J. Long
General Inspection5/13/20195/13/20195/14/2019 PASS
DetailsAndy J. Long
WIP on frame, no trackout. RP on duty daily. No corrections requested.
General Inspection4/26/20194/26/20195/1/2019 PASS
DetailsAndy J. Long
General Inspection4/11/20194/11/20194/12/2019 CANC
DetailsAndy J. Long
General Inspection3/27/20193/27/20193/27/2019 PASS
DetailsMichael Zawacki
No dirt on street. Builder knows to clean at end of work day.
General Inspection3/12/20193/12/20193/12/2019PPASS
DetailsMichael Zawacki
WIP on foundation. Road is clean. Will sweep sidewalk and fence off lot at end of day.
General Inspection2/26/20192/26/20192/26/2019 PASS
DetailsMichael Zawacki
WIP on foundation walls, everything contained to site.
General Inspection2/8/20192/8/20192/8/2019 PASS
DetailsMichael Zawacki
Met with contractor at site. Some frozen trackout, will clean as it thaws. Currently building forms for rear wall.
General Inspection1/22/20191/22/20191/22/2019 PASS
DetailsMichael Zawacki
Crew on site setting rebar. Planning on bringing in eco pan before pour.
General Inspection1/7/20191/7/20191/7/2019 PEND
DetailsMichael Zawacki
Talked with contractor while on site.
Currently loading and hauling away backfill. Will make sure to clean street and sidewalk when done.
General Inspection12/21/201812/21/201812/21/2018 PART
DetailsAndy J. Long
RP onsite. WIP on excavation and haul off of material. Lots of material has veen removed, sidewalk and dirt between curb and sidewalk is muddy and wet.

RP will repair section of silt fence and clean side walk and gutter at end of the day. Sediment check bags in gutter are capturin dirt and mud in gutter in front of project.
General Inspection12/6/201812/6/201812/10/2018 PASS
DetailsAndy J. Long
WIP on excavation. No trackout. Site is cleaning up at end of day. Wintery/frozen conditions.
BMP Violation11/21/201811/21/201811/21/2018PPASS
DetailsAndy J. Long
Road swept. Silt fence containment installed properly. RP on duty, will sweep up after last load hauled off.
General Inspection11/6/201811/20/201811/20/2018PFAIL
DetailsMichael Zawacki
Lots of dirt and rocks on street and sidewalk. Left written correction notice left on site and message sent to RP.
Site Preparation11/5/201811/6/201811/6/2018APASS
DetailsAndy J. Long
Cameron Phone #: ###-####

Preconstruction meeting with RP-GC. Reviewed ESC plan. Storm drain down hill on Parkside has inlet protection installed. Wattle check dam onsite for use. Excavation to begin later this week or next, backfill to be hauled away during work, not stored onsite. Preserve hillside vegetation around home footprint.

After excavation, perimeter sediment controls will installed. Reviewed RP of need for good washout containment and watch for spill from the pump truck that will be required. RP has permit sign to post with rest of plans.

Approved to start construciton. follow up inspection scheduled.