Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberESC18-00488
StatusIssued
Name JUSTIN MILANDER
Site Address 4200 E WOLF TREE ST
Project NameWolf Tree Square Subdivision
Customer Number 
ePlanReviewNo
Description
New residential subdivision; includes offsite sewer line installation and dewatering plan. Site has CGP coverage in addition to City of Boise permits, see NOI tracking # IDR1000ZY. Site has been rough graded in 2018, utilities and infrastructure will be completed in early 2019.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/20/20207/20/20207/20/2020 PASS
DetailsMichael Zawacki
WIP on east side of project. No new flat work or foundations, roll pan washout still on site.
Lots with foundations that haven't started building are becoming overgrown and weed stable. Site is clean, no loose trash or trash blown off site.
General Inspection6/19/20206/19/20206/19/2020 PASS
DetailsMichael Zawacki
Inspected 6-18. West section is completed. All concrete pads have been poured. Site kept clean.
General Inspection5/19/20205/19/20205/19/2020PPASS
DetailsMichael Zawacki
Western most blocks are all completed. All foundations have already been poured. Few workers at site. Some backfill stored at site. No esc issues.
General Inspection4/22/20204/22/20204/23/2020PPASS
DetailsMichael Zawacki
No dirt work, pads look like they've all been poured.
No blowing trash, no issues.
General Inspection3/26/20203/26/20203/26/2020PPASS
DetailsMichael Zawacki
Silt fence along east perimeter has been repaired. WIP on multiple homes, western most homes are completed. Site is being kept clean, no loose wind blown trash at site. No issues.
General Inspection3/5/20203/5/20203/5/2020PPASS
DetailsMichael Zawacki
Met with Gus while on site. Foundations are poured. Multiple homes being framed, they are keeping a better watch on trash due to wind. All trash contained during inspection.
General Inspection2/11/20202/11/20202/11/2020PPASS
DetailsMichael Zawacki
Met with gus on site. Will start more pad work in a few weeks. No major issues, some clusters of homes now finished.
General Inspection1/13/20201/13/20201/14/2020 PASS
DetailsMichael Zawacki
Few homes have exteriors completed.
No mud on major roads.
Site is snow covered, unable to tell if there is loose trash.
General Inspection12/13/201912/13/201912/13/2019PFAIL
DetailsMichael Zawacki
Crew loading excavator tracked all over barnside. '
Message sent to RP.
General Inspection12/5/201912/5/201912/5/2019PFAIL
DetailsMichael Zawacki
Called Gus and did site walk.
Lots of trackout, said they will get sweeoer out today.
Silt fence has been knocked over.
Washout is full and overflowing. Will get it cleaned and figure out better option for next pours.
Trash cleanup in ongoing.
General Inspection11/25/201911/25/201911/25/2019 PEND
DetailsMichael Zawacki
Message sent to RP.
Silt fence along east needs to be repaIRED.
cREW HAULING BACKFILL, SOME TRACKOUT. sTRRETS SHOULD BE SWEPT BEFORE SNOWS.
wASHOUTS NOW ON SOUTH EAST CORNER OF PROJECT.
General Inspection10/23/201910/23/201910/23/2019PPART
DetailsMichael Zawacki
Lots of activity at site. All foundations on west end poured, roll pans on site, no stabalized entrance going to them. Excavation for foundations on north east of site, lots of dirt has fallen on road.
Person on site cleaning trash. Site needs to be swept.
BMP Violation9/23/20199/26/20199/26/2019APASS
DetailsMichael Zawacki
wASHOUT AROUND HOMES WAS CLEANED, NORTHERN WASHOUT WASN'T, CUTTING EDGE SCRAPED IT UP WHEN i ASKED.
hUNTER hOMES NOTIFIED ABOUT REINSPECTION FEE.
General Inspection9/23/20199/23/20199/23/2019 FAIL
DetailsMichael Zawacki
Multiple areas of dumped washout and saw cut slurry. Messag eand pictures sent to Jameson and Justin. Follow up scheduled for 9-26
Conference8/22/20198/22/20198/22/2019APASS
DetailsMichael Zawacki
Site walkthrough completed.
Will work to keep trash cleaned up and wood scraps clean.
Will add BMPs in low spots and work to keep water flowing from site.
Poly will be used to catch rain water before gutters installed.
Will keep swppp maps up to date.
Syman is ESC contractor.
General Inspection8/19/20198/19/20198/19/2019 FAIL
DetailsMichael Zawacki
Two homes being framed, a few foundation completed. Trash and building waste starting to accumulate around homes. Lots of dirt on sidewalks, material stored on road. Storm drains not all protected, pit run road to washout does right over unprotected washout. Two roll pan washouts at site and being used.
General Inspection7/18/20197/19/20197/22/2019APASS
DetailsMichael Zawacki
Sidewalks and roads have been installed, roll pan still on site. Crew on site doing landscape wall around sidewalk, some dust when moving drainage rocks.
No major ESC issues.
General Inspection7/8/20197/8/20197/9/2019 PASS
DetailsMichael Zawacki
WIP on interior roads. Curbing completed, graders running on roadbed. Water truck on site, no dust. Silt fence has been knocked down. Washout on site.
General Inspection6/5/20196/5/20196/5/2019PPASS
DetailsMichael Zawacki
Work has begun on aprons and curb along perimeter of development. Worker sweeping street. Site is very disturbed, no workers at time of inspection in site. No ESC issues.
General Inspection5/20/20195/20/20195/21/2019 PASS
DetailsMichael Zawacki
No workers on site. Access road is below grade and not accessible. Silt fence will need to be replaced.
Tracking Control4/17/20194/17/20194/17/2019PPART
DetailsAndy J. Long
No construction entrance at site, old entrance buried. Utility installation is in progress. Workers parking on Old Hickory or Barnside to prevent trackout. Track Utiilities to complete work Monday, clean up site. Paving crew will install new rock entrance for a staging area on the parcel south of site to avoid placing where the new roads will be.

Verbal request to Jameson with Hunter Homes. Stated entrance will be installed by next week and order for site clean up at aprons has been given.
General Inspection3/19/20193/19/20193/19/2019 PASS
DetailsAndy J. Long
WIP on infrastructure installation/excavation. No trackout to Old Hickory or Barnside. Silt fence perimeter and vegetated buffer are in place. Permit posted.

Will need to be prepared for fugitive dust control during grading and earthwork...ground is starting to dry. No corrections at this time.
General Inspection2/13/20192/13/20192/13/2019PPART
DetailsMichael Zawacki
Some trackout on east side of project, sweeper on site.
General Inspection2/7/20192/7/20192/7/2019PPASS
DetailsMichael Zawacki
Sweeper located on site. Some light trackout from loading backfill. All workers parked on road, no one driving on or off site. Backfill is being loaded onto trucks pulled onto apron.
General Inspection1/8/20191/9/20191/9/2019APEND
DetailsMichael Zawacki
Met with Dahle project manager on site. Work on water lines has begun, have not hit any ground water.
Lots of trackout, sweeper truck is ordered and scheduled. Will install entrance when work is done by entrance, currently there is no room.
Conference1/2/20191/2/20191/2/2019PDONE
DetailsAndy J. Long
phone call regarding submission of dewatering plan and updated SWPPP for project.
General Inspection12/26/201812/26/201812/26/2018 PASS
DetailsMichael Zawacki
No new activity, site is stable. Siltfence will need repairs before next phase.
General Inspection8/14/20188/14/20188/14/2018PPASS
DetailsMichael Zawacki
Site graded and not actives. Perimeter silt fence and DIs still in place. Small retention pond on south side to collect irragation water coming off ranch.
General Inspection6/14/20186/14/20186/14/2018PPASS
DetailsMichael Zawacki
Site grading completed, all equipment off site. Silt fence and inlet protection still in place. Will need to monitor for dust.
Tracking Control5/15/20185/15/20185/15/2018PPEND
DetailsMichael Zawacki
Lots of trackout headed north on Wolf Tree. Sweeper is scheduled to come end of every day.
Tracking Control5/8/20185/9/20185/10/2018PPART
DetailsAndy J. Long
Some sandy/dust trackout to Timbersaw is still on the road.

Called Jamison with Hunter Homes and requested street sweeping on Timbersaw and at Trapper where the fill dirt is being hauled from.

Stated sweeper scheduled for today after 5 and it will also sweep all of HRN and Barnside as well.

Will follow up next week.
General Inspection5/8/20185/8/20185/8/2018PPART
DetailsAndy J. Long
Need to clean up trackout on Timbersaw. follow up inspection scheduled...
General Inspection4/24/20184/25/20184/25/2018APASS
DetailsMichael Zawacki
Clearing and grubbing has begun. Currently hauling away debris from trees and stockpiling top soil. About half of area exposed at time of inspection, no dust
Site Preparation4/24/20184/24/20184/24/2018PPASS
DetailsAndy J. Long
Pre-construction meetiong completed with PW engineering and ESC division. Approved to begin construction